ETSI TS 186 022-3-2012 IMS Network Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance Testing Part 3 Abstract Test Suite (ATS_1.pdf
《ETSI TS 186 022-3-2012 IMS Network Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance Testing Part 3 Abstract Test Suite (ATS_1.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 186 022-3-2012 IMS Network Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance Testing Part 3 Abstract Test Suite (ATS_1.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 186 022-3 V3.1.1 (2012-01) IMS Network Testing (INT); Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Testing; Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification flop
2、py3Technical Specification ETSI ETSI TS 186 022-3 V3.1.1 (2012-01)2Reference DTS/INT-00030-3 Keywords ATS, IMS, OIP, OIR, PIXIT, SIP, testing, TTCN ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C
3、 Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice Individual copies of the present document can be downloaded from: http:/www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of existin
4、g or perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present documen
5、t should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the followi
6、ng services: http:/portal.etsi.org/chaircor/ETSI_support.asp Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2012. All rights
7、reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and own
8、ed by the GSM Association. ETSI ETSI TS 186 022-3 V3.1.1 (2012-01)3Contents Intellectual Property Rights 4g3Foreword . 4g31 Scope 5g32 References 5g32.1 Normative references . 5g32.2 Informative references 6g33 Definitions and abbreviations . 6g33.1 Definitions 6g33.2 Abbreviations . 6g34 Abstract T
9、est Method (ATM) . 6g34.1 Configurations for testing UE 6g35 The ATS development process . 7g35.1 Requirements and Test Purposes 7g35.2 ATS structure . 7g35.2.1 Test case grouping 7g35.2.2 Test case identifiers 7g35.3 ATS specification framework . 8g35.3.1 ATS Library 8g35.3.2 Use of TTCN-3 . 9g3Ann
10、ex A (normative): Partial PIXIT proforma 10g3A.1 Introduction 10g3A.2 PIXIT items 10g3A.2.1 PIXIT for UE Testing . 10g3A.2.2 PIXIT for AS Testing . 11g3A.2.3 General PIXIT 11g3Annex B (informative): TTCN-3 library modules . 12g3B.1 Electronic annex, zip file with TTCN-3 code 12g3Annex C (informative
11、): Validation Report 13g3C.1 Test Suite Validation Level 13g3C.2 TTCN-3 Edition . 13g3C.3 TTCN-3 Tool(s) . 13g3C.3.1 TTCN-3 Tool ElviorTestCast 13g3C.3.1.1 Identification of the TTCN-3 Tool ElviorTestCast 13g3C.3.1.2 Compilation status 13g3C.3.2 TTCN-3 Tool EricssonTitan 13g3C.3.2.1 Identification o
12、f the TTCN-3 Tool EricssonTitan . 13g3C.3.2.2 Compilation status 13g3C.3.3 TTCN-3 Tool Testing Technologies TTWorkbench14g3C.3.3.1 Identification of the TTCN-3 Tool Testing Technologies TTWorkbench14g3C.3.3.2 Compilation status 14g3C.3.4 Test Platform(s) 14g3History 15g3ETSI ETSI TS 186 022-3 V3.1.1
13、 (2012-01)4Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectu
14、al Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IP
15、R searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been
16、produced by ETSI Technical Committee IMS Network Testing (INT). The present document is part 3 of a multi-part deliverable covering Communication Waiting (CW), as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS)“; Part 2: “Test Suite Structure and Test Purposes (TSS Pa
17、rt 3: “Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification“. ETSI ETSI TS 186 022-3 V3.1.1 (2012-01)51 Scope The present document specifies the Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for T
18、esting (PIXIT) proforma based on the Test Suite Structure and Test purposes defined in TS 186 022-2 2. The TSS the testing architecture; the test methods and port definitions; the test configurations; the design principles, assumptions, and used interfaces to the TTCN3 tester (System Simulator); TTC
19、N styles and conventions; the partial PIXIT proforma; the modules containing the TTCN-3 ATS. Annex A provides the Partial Implementation Extra Information for Testing (PIXIT) Proforma of the ATS. Annex B provides the Testing and Test Control Notation (TTCN-3) part of the ATS. 2 References References
20、 are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the reference document (including any amendments) applies. Referenced document
21、s which are not found to be publicly available in the expected location might be found at http:/docbox.etsi.org/Reference. NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee their long term validity. 2.1 Normative references The following
22、referenced documents are necessary for the application of the present document. 1 ETSI TS 124 615 (V8.3.0): “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem;
23、 Protocol Specification (3GPP TS 24.615 version 8.3.0 Release 8)“. 2 ETSI TS 186 022-2 (V3.1.1): “Technical Committee for IMS Network Testing (INT); Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Testing; Part 2: Test Suite Structure and Test Purposes (T
24、SS Network Integration Testing; IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification“. 4 IETF RFC 3261 (200
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS18602232012IMSNETWORKTESTINGINTCOMMUNICATIONWAITINGCWUSINGIPMULTIMEDIAIMCORENETWORKCNSUBSYSTEMCONFORMANCETESTINGPART3ABSTRACTTESTSUITEATS_1PDF

链接地址:http://www.mydoc123.com/p-744391.html