EN 60079-0-2012 en Explosive atmospheres - Part 0 Equipment - General requirements (Incorporates Amendment A11 2013).pdf
《EN 60079-0-2012 en Explosive atmospheres - Part 0 Equipment - General requirements (Incorporates Amendment A11 2013).pdf》由会员分享,可在线阅读,更多相关《EN 60079-0-2012 en Explosive atmospheres - Part 0 Equipment - General requirements (Incorporates Amendment A11 2013).pdf(116页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationExplosive atmospheresPart 0: Equipment General requirementsIncorporating corrigenda November 2012 and December 2013BS EN 60079-0:2012+A11:2013BS EN 60079-0:2012+A11:2013Incorporating corrigenda November 2012, December 2013 and October 2014BS EN 60079-0:2012+A11:2013National
2、forewordThis British Standard is the UK implementation of EN 60079-0:2012+A11:2013. It is derived from IEC 60079-0:2011,incorporating corrigenda November 2012 and December 2013. Itsupersedes BS EN 60079-0:2012, which is withdrawn.The CENELEC common modifications have been implemented at theappropria
3、te places in the text. The start and finish of each commonmodification is indicated in the text by tags . The commonmodifications introduced by CENELEC amendment A11 are indicatedby hi.The UK participation in its preparation was entrusted to TechnicalCommittee EXL/31, Equipment for explosive atmosph
4、eres.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. The British Standards Institution 2014.Published by BSI Sta
5、ndards Limited 2014ISBN 978 0 580 85492 7ICS 13.230; 29.260.20Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 30 September 2012.Amendments/corrigenda issued since
6、publicationDate Text affected30 June 2013 30 April 2014 Implementation of IEC corrigendum November 2012: Subclause 9.3.3 modifiedImplementation of IEC corrigendum December2013: Subclauses 7.1.2.2 and 7.1.2.3 modified.Implementation of CENELEC amendment A11:2013. Implementation of IEC Interpretation
7、SheetNovember 2013 which is appended at the end ofthis document.BRITISH STANDARDBS EN 60079-0:2012+A11:2013 BRITISH STANDARD8386 6, December 2013 andOctob r 2014. It supersedes BS EN 60079-0:2012, hich is withdrawn.i c er. . . ified. Im-plementation of CEN LEC amendment A11:2013.I r r t ti eetin Nat
8、ion l An ex NA31 December 2014 Implementation of IEC Interpretation SheetOctober 2014 in National Annex NBTC 31/Publication 60079-0 (2011), sixth edition/I-SH 01 EXPLOSIVE ATMOSPHERES Part 0: Equipment General requirements INTERPRETATION SHEET 1 This interpretation sheet has been prepared by technic
9、al committee 31: Equipment for explosive atmospheres, of IEC. The text of this interpretation sheet is based on the following documents: ISH Report on voting 31/1085/ISH 31/1095/RVD Full information on the voting for the approval of this interpretation sheet can be found in the report on voting indi
10、cated in the above table. _ Interpretation of Annex A Questions: Is the torque used for the tensile test of A.3.1.4 required to be the same torque as the initial torque determined in A.3.1.1? At what point in the testing sequence is the thermal endurance to heat test conducted? Interpretation: In A.
11、3.1.1, a torque is applied to either the screws of a flanged compression element or the nut of a screwed compression element to compress the sealing ring to secure the mandrel. A tensile force is then applied to the mandrel to confirm the securement. The tensile force is applied for not less than 6
12、h. The test is carried out at an ambient temperature of (20 5) C. The torque value needed for clamping to be assured by the sealing ring is acceptable if the slippage of the mandrel or cable sample as a result of the tensile force is not more than 6 mm. Subsequently, either the complete cable gland
13、and mandrel assembly used for the determination described above, or a new sample prepared using the same torque values, is then to be subjected to the thermal endurance tests. The maximum service temperature is considered to be 75 C unless otherwise specified by the manufacturer. NOTE 1 The 75 C ser
14、vice temperature is the median of the branching point and entry point temperatures. NOTE 2 Cable glands employing only metallic sealing rings and metallic parts do not require thermal endurance tests. The subsequent test conditions and acceptance criteria are given in A.3.1.4. Prior to the applicati
15、on of the tensile force, the gland may be re-tightened in accordance with the manufacturers instructions. BS EN 60079-0:2012+A11:2013 IEC 60079-0 2011 106 November 2013 ICS 29.260.20 NOTE The torque applied to the screws or nut during retightening is not required to be the same as the initial torque
16、 applied in A.3.1.1. In A.3.1.5, the “value needed to prevent slipping” is the torque required for A.3.1.4. It is intended that this interpretation will be introduced in IEC 60079-0 Edition 7 and therefore an Interpretation Sheet will not be required for this or future editions. BS EN 60079-0:2012+A
17、11:2013 IEC 60079-0 2011 107 National Annex NA (Informative)November 2013 ICS 29.260.20 NOTE The torque applied to the screws or nut during retightening is not required to be the same as the initial torque applied in A.3.1.1. In A.3.1.5, the “value needed to prevent slipping” is the torque required
18、for A.3.1.4. It is intended that this interpretation will be introduced in IEC 60079-0 Edition 7 and therefore an Interpretation Sheet will not be required for this or future editions. BS EN 60079-0:2012+A11:2013 IEC 60079-0 2011 107 TC 31/Publication 60079-0 (2011), sixth edition/I-SH 01 EXPLOSIVE
19、ATMOSPHERES Part 0: Equipment General requirements INTERPRETATION SHEET 1 This interpretation sheet has been prepared by technical committee 31: Equipment for explosive atmospheres, of IEC. The text of this interpretation sheet is based on the following documents: ISH Report on voting 31/1085/ISH 31
20、/1095/RVD Full information on the voting for the approval of this interpretation sheet can be found in the report on voting indicated in the above table. _ Interpretation of Annex A Questions: Is the torque used for the tensile test of A.3.1.4 required to be the same torque as the initial torque det
21、ermined in A.3.1.1? At what point in the testing sequence is the thermal endurance to heat test conducted? Interpretation: In A.3.1.1, a torque is applied to either the screws of a flanged compression element or the nut of a screwed compression element to compress the sealing ring to secure the mand
22、rel. A tensile force is then applied to the mandrel to confirm the securement. The tensile force is applied for not less than 6 h. The test is carried out at an ambient temperature of (20 5) C. The torque value needed for clamping to be assured by the sealing ring is acceptable if the slippage of th
23、e mandrel or cable sample as a result of the tensile force is not more than 6 mm. Subsequently, either the complete cable gland and mandrel assembly used for the determination described above, or a new sample prepared using the same torque values, is then to be subjected to the thermal endurance tes
24、ts. The maximum service temperature is considered to be 75 C unless otherwise specified by the manufacturer. NOTE 1 The 75 C service temperature is the median of the branching point and entry point temperatures. NOTE 2 Cable glands employing only metallic sealing rings and metallic parts do not requ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN6007902012ENEXPLOSIVEATMOSPHERESPART0EQUIPMENTGENERALREQUIREMENTSINCORPORATESAMENDMENTA112013PDF

链接地址:http://www.mydoc123.com/p-717556.html