BS 3900-C1-1965 Methods of test for paints - Tests associated with paint film formation - Wet edge time《涂料试验方法 涂料膜形成试验 湿边时间》.pdf
《BS 3900-C1-1965 Methods of test for paints - Tests associated with paint film formation - Wet edge time《涂料试验方法 涂料膜形成试验 湿边时间》.pdf》由会员分享,可在线阅读,更多相关《BS 3900-C1-1965 Methods of test for paints - Tests associated with paint film formation - Wet edge time《涂料试验方法 涂料膜形成试验 湿边时间》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS3900-C1: 1965 Incorporating Amendment Nos.1 and 2 Methods of Test for Paints Part C1: Wet edge time It is recommended that this Part be read in conjunction with the general information in the Introduction to BS3900 issued separately. UDC667.61+667.612.6BS3900-C1:1965 BSI 10-1999 I
2、SBN 0 580 35631 0 A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This d
3、ocument comprises a front cover, an inside front cover, pages i and ii, page1 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover. Amendments issued since publication A
4、md. No. Date of issue Comments 724 April 1971 6807 November 1991 Indicated by a sideline in the marginBS3900-C1:1965 BSI 10-1999 i Contents Page 1 Scope 1 2 Supplementary information 1 3 Preparation of coated test panel 1 4 Procedure 1 5 Report of test 1ii blankBS3900-C1:1965 BSI 10-1999 1 NOTEPart
5、C1 is based on DEF-1053 Method No.16, “Settingtime”. 1 Scope 1.1 This Part describes a procedure for determining whether the edge of a film of paint or allied material remains “alive” after a specified period of drying, when applied over the appropriate surface. NOTEThe term “wet edge time” is also
6、known in the paint industry as “lapping time”, “live edge time” and “setting time”. 2 Supplementary information 2.1 The method of test described below requires to be completed, for any particular application, by the following supplementary information. This information is to be derived from the Brit
7、ish Standard or other specification for the material under test or, where appropriate, is to be the subject of agreement between purchaser and vendor. 1) Thickness and/or weight of coating and whether it is to be a single film or a coating system. 2) Wet edge time specified for the material under te
8、st. 3 Preparation of coated test panel 3.1 Unless otherwise stated use a panel of burnished steel, approximately600mm 300mm. 3.2 Prepare the panel in accordance with the method described in Part A3, “Preparation of panels prior to painting” coat it where necessary with the appropriate primer and/or
9、undercoat and allow each coat to dry for24 hours, unless otherwise specified. 4 Procedure 4.1 Carry out the test under substantially draught-free conditions, at a temperature of23 2 C and a relative humidity of50 5%. 4.2 Divide the panel into two equal areas by means of a line parallel to the shorte
10、r side. Place the panel in a position such that the longer side is vertical. 4.3 Coat the upper half of the panel with the material under test, using a25 mm brush. Lay off in a direction parallel to the shorter side and finish laying off along the edge flanking the dividing line taking care to avoid
11、 leaving an abnormally thick or thin edge. 4.4 Invert the panel. 4.5 Approximately2 minutes prior to the specified wet edge time, commence to coat the remaining area so that the two edges are worked together starting at the specified wet edge time, cross-brushing across the join as necessary. 4.6 Fi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS3900C11965METHODSOFTESTFORPAINTSTESTSASSOCIATEDWITHPAINTFILMFORMATIONWETEDGETIME 涂料 试验 方法 形成 时间 PDF

链接地址:http://www.mydoc123.com/p-543934.html