ASTM F3124-2015e1 Standard Practice for Data Recording the Procedure used to Produce Heat Butt Fusion Joints in Plastic Piping Systems or Fittings《用于生成塑料管系统或配件热熔对接的程序记录数据的标准实践规程》.pdf
《ASTM F3124-2015e1 Standard Practice for Data Recording the Procedure used to Produce Heat Butt Fusion Joints in Plastic Piping Systems or Fittings《用于生成塑料管系统或配件热熔对接的程序记录数据的标准实践规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F3124-2015e1 Standard Practice for Data Recording the Procedure used to Produce Heat Butt Fusion Joints in Plastic Piping Systems or Fittings《用于生成塑料管系统或配件热熔对接的程序记录数据的标准实践规程》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F3124 151Standard Practice forData Recording the Procedure used to Produce Heat ButtFusion Joints in Plastic Piping Systems or Fittings1This standard is issued under the fixed designation F3124; the number immediately following the designation indicates the year oforiginal adoption or,
2、in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEThe title was editorially corrected and keywords were added in March 2015.1. Scope1.1 Th
3、is practice specifies the data recording informationthat is recorded, when data recording equipment is used, onbutt fusion joints in a plastic piping system in order to comparethe procedure used in making the joint to the heat butt fusionjoining procedure specified. This practice is suitable for use
4、with all heat butt fusion joining procedures that requiremeasurable time and pressure profiles, such as Practice F2620,Specification F2785, Specification F2945 international stan-dards or other qualified procedures. This practice applies tohydraulically operated heat butt fusion machines only and do
5、esnot apply to manually operated fusion machines or specializedfabrication equipment for fittings in a controlled environmentwith proprietary procedures and processes.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of
6、the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:F2620 Practice for Heat Fusion Joining of Polyethylene Pipeand FittingsF2785 Specification for Polyamide 1
7、2 Gas Pressure Pipe,Tubing, and FittingsF2945 Specification for Polyamide 11 Gas Pressure Pipe,Tubing, and Fittings3. Terminology3.1 Definitions:3.1.1 Data Recording Device (“Device”)This is an instru-ment that obtains and stores information.3.1.1.1 DiscussionThis is generally an electronic deviceth
8、at accepts sensor input for pressure and time and manualinput for other information. These Devices are typically small,battery powered, portable, and equipped with amicroprocessor, internal memory for data storage, and connec-tions for pressure sensors to the hydraulic fusion machine.Devices may int
9、erface with a personal computer and mayutilize software to activate the Device and to view and analyzethe collected data. Other Devices may have a local interfacedevice, such as a keypad or touch sensing, LCD display, andcan be used as a standalone device.4. Summary of Practice4.1 The principle of h
10、eat butt fusion of plastic pipe is toapply heat, at a designated temperature, to two prepared pipeends for a heat soak period and then fuse them together by theapplication of a sufficient force, thereby resulting in fusion.This practice identifies the information that is collected by thedata recordi
11、ng device about the heat butt fusion joint. TheDevice records the hydraulic pressures and times during thebutt fusion process for individual joints and manual entriessuch as operator identification, product information, fusionparameters, and heater surface temperature.5. Significance and Use5.1 The
12、Device record includes information about how theheat butt fusion joint was made (heater temperature, pressuresand times for the heating, fusion and cooling steps) and otherimportant information about the process, job, equipment used,etc. The Device record is compared to the specified heat buttfusion
13、 procedure parameters to determine if the procedure wasfollowed correctly. For comparison purposes, a graph of timeversus pressure is generated from the data record to showpressure changes that occur during the butt fusion process.Comparing the time versus pressure graph to the steps in theprocedure
14、 helps determine that the procedure parameters wereobserved. (See Appendix X1.) These records may be down-loaded from the device and stored.6. ApparatusGeneral Requirements6.1 Data Recording Device:6.1.1 The Device shall be capable of collecting the follow-ing information:1This practice is under the
15、 jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.20 on Joining.Current edition approved March 1, 2015. Published March 2015. DOI: 10.1520/F312415E01.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, P
16、A 19428-2959. United States1the heater temperature at the beginning of the heat cycle and the pressuresapplied during the heating, fusing and cooling cycletime for each stage of the process from the beginning of the heat cyclethrough the end of the cool cyclethe operators name or identification numb
17、er, or boththe job numberjoint numberthe date and timethe equipment manufacturerequipment model and serial number usedthe heat butt fusion procedure or standard usedthe pipe/fitting manufacturerthe pipe OD and DRpipe material and material designationdrag pressurethe interfacial pressure used (unless
18、 already included in the gauge pressuredetermination)plus any notes about the job that would help evaluate the record such as:o weather conditions: ambient temperature, wind speedo job set-up issueso use of an enclosure.6.1.2 The Device shall be able to operate accurately underthe ambient conditions
19、 for which it is designed.6.1.3 The Device shall be able to output the data for theproduction of a time versus pressure graph of the fusionprocess. See Appendix X1 for an example of a time versuspressure graph that shows the pressures and times of thedifferent steps in the heat butt fusion process.6
20、.1.4 The Device shall be able to record and store at least24 h of continuous operation of heat butt fusion joint data.6.1.5 The records in the Device shall be downloadable to acomputer or other data storage device. (see Note 1.)NOTE 1The records should not be overwritten prior to downloadingwithout
21、a warning message to the user. Records should be offloaded beforedeleting the records from the Device.6.1.6 Calibration requirements shall be followed per themanufacturers recommendations.6.1.7 The Device shall be capable of connecting to thehydraulic system of the butt fusion machine in order to re
22、cordthe pressures during the fusion cycle.6.1.8 The Device shall calculate and recommend heat buttfusion pressures based on entered/provided pipe size informa-tion and interfacial pressure.6.2 Pressure Transducer:6.2.1 The pressure transducer shall be capable of measuringthe hydraulic pressure used
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF31242015E1STANDARDPRACTICEFORDATARECORDINGTHEPROCEDUREUSEDTOPRODUCEHEATBUTTFUSIONJOINTSINPLASTICPIPINGSYSTEMSORFITTINGS

链接地址:http://www.mydoc123.com/p-540065.html