1、Designation: F 2304 03Standard Practice forRehabilitation of Sewers Using Chemical Grouting1This standard is issued under the fixed designation F 2304; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A nu
2、mber in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice describes the procedures for testing andsealing individual sewer pipe joints with appropriate chemicalgrouts using the pac
3、ker method. Sewer systems shall includesanitary, storm, and combined and their appurtenances. Chemi-cal grouting is a soil sealing process, which seals the voidswithin the soil surrounding the exterior of the pipe at the pointof leakage. Chemical grouting is not considered a structuralrepair.1.2 Thi
4、s practice applies to sewers 6 to 42 in. (18 to 107 cm)in diameter. Larger diameter pipe may be grouted with spe-cialized packers or man entry methods. Host pipe interiorsurfaces must be adequate to create an effective seal for thepacker elements.1.3 The values stated in inch/pound units are to be r
5、egardedas the standard. The values in parentheses are for informationonly.1.4 Worker safety training should include reviewing thehazards associated with hoses, pumps, tanks, couplers, com-pressors, bottles, motors, and all other related applicationapparatus. Additional safety considerations includin
6、g safelyhandling, mixing, and transporting of chemical grouts shouldbe provided by the chemical grout manufacturer or supplier orboth. Their safe operating practices and procedures shoulddescribe in detail appropriate personal protective equipment(PPE) for the various grouting operations. Operations
7、 coveredshould include the proper storage, transportation, mixing, anddisposal of chemical grouts, additives, and their associatedcontainers.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard
8、to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 NASSCO Standards:NASSCO Specifications Guidelines, Wastewater Collec-tions Systems Maintenance and Rehab, Sewer Line Clean-ing2NASSCO Specification
9、s Guidelines, Wastewater Collec-tions Systems Maintenance and Rehab, Television Inspec-tion, Main Sewers23. Summary of Practice3.1 The work required by this practice shall consist offurnishing all labor, materials, equipment and supervising andperforming all work necessary to rehabilitate the design
10、atedsanitary or storm sewer lines or both, all in accordance with theprocedures. The work shall consist of, but not necessarily belimited to, performing the following tasks where specified:3.1.1 Sewer Line Cleaning, shall be performed with hydrau-lically propelled high-velocity jet or mechanically p
11、oweredequipment. Selection of equipment shall be based on fieldconditions such as access to manholes, quantity of debris, sizeof sewer, depth of flow, and so forth. NASSCO SpecificationsGuidelines, Wastewater Collection Systems Maintenance andRehabilitation, Sewer Line Cleaning section adequately ad
12、-dresses the sewer line cleaning process in the current edition.3.1.2 Sewer Flow Control, shall be performed as required tocomply with this practice.3.1.3 Television Inspection, shall be required to reveal anddocument sewer line conditions and be performed in advanceof or in conjunction with pipe jo
13、int testing and sealing sewerpipe joints. NASSCO Specifications Guidelines, WastewaterCollection Systems Maintenance and Rehabilitation, Televi-sion Inspection, Main Sewers section adequately addressessewer line television inspection processes in the current edi-tion.3.1.4 Sewer Pipe Joint Testing,
14、shall be performed toidentify defective (infiltrating/exfiltrating) pipe joints and shallbe accomplished by applying a positive test pressure to each1This practice is under the jurisdiction of ASTM Committee F36 on Technologyand Underground Utilities and is the direct responsibility of Subcommittee
15、F36.20on Rehabilitation of Sewers Using Chemical Grouting Techniques.Current edition approved July 10, 2003. Published August 2003.2NASSCO, 1108 Sheller Ave., Suite 5, Chambersburg, PA 17201.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United S
16、tates.individual sewer pipe joint, monitoring the test pressure andany test pressure decay, or through visual observation of theleaking joint.3.1.5 Sewer Pipe Joint Sealing, shall be accomplished bythe pressure injection of chemical grout (chemical sealingmaterial) into the soils encompassing the pi
17、pe joint. Chemicalgrouts are designed to be injected into the soil surrounding thepipe, which stabilizes the soil and forms a permanent imper-meable seal called a soil ring. Because the chemical grout isplaced outside the pipe, adequate volumes must be injected toform an effective seal. This applica
18、tion will be throughstructurally sound joints from within the pipe (packer method)in tandem with a closed circuit television inspection system.4. Significance and Use4.1 The inspection, testing, and repair of sewer pipe joints isa practice that can assist in maintaining and optimizing sewerperforman
19、ce. It is important to identify methods that use themost current compounds and technology to ensure the reduc-tion of infiltration and exfiltration. The method selected shouldutilize environmentally safe grout and minimize the disruptionof traffic.4.2 This practice serves as a means to inspect, test
20、, and sealsewer pipe joints, having selected the appropriate chemicalgrouts, using the packer method. Television inspection andjoint testing are used to identify sewer line conditions, defec-tive joints, and document the repairs undertaken. Instruction onjoint sealing, if necessary, is then detailed
21、, using pressureinjection into the soils encompassing the pipe joint with achemical grout (chemical sealing material).4.3 This practice should not be used for longitudinallycracked pipe, severely corroded pipe, structurally unsoundpipe, flattened, or out-of-roundpipe. In areas with high ground-water
22、 pressure, greater than 10 psi (68.9 ksi) at the test point,consult equipment manufacturers.5. Contract Responsibilities5.1 Sewer system rehabilitation contracts should define oraffix responsibility or make provisions for the following items:5.1.1 Notice Of Client/Owner Requirements, which arereleva
23、nt to and within the scope of work to be performed underthe contract.5.1.2 Municipal And Other Licenses And Permits, andassistance in obtaining approvals or consent from utilities orcarriers or other persons or organizations upon whose propertyor authority performance of work under the contract migh
24、timpinge; or a written release from responsibility for theperformance of work under the contract if and to the extentsuch work is precluded by the inability to obtain approvals orconsent.5.1.3 Access To Site Of Work, to be provided to the extentthat the owner is legally able to so provide or, if not
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF23042003STANDARDPRACTICEFORREHABILITATIONOFSEWERSUSINGCHEMICALGROUTING 化学 灌浆 修复 下水道 标准 实施 规范 PDF

链接地址:http://www.mydoc123.com/p-538352.html