ASTM E2727-2018 Standard Practice for Assessment of Rainwater Quality《雨水质量评估的标准实施规程》.pdf
《ASTM E2727-2018 Standard Practice for Assessment of Rainwater Quality《雨水质量评估的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2727-2018 Standard Practice for Assessment of Rainwater Quality《雨水质量评估的标准实施规程》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2727 101E2727 18Standard Practice forAssessment of Rainwater Quality1This standard is issued under the fixed designation E2727; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in pa
2、rentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1 NOTETable X1.1 alignment was editorially corrected in October 2014.1. Scope1.1 This practice provides a methodology for assessing rainwater quality.1.1.1 Thi
3、s practice identifies a set of research and reporting requirements that will permit the intended user to assess therainwater quality of a catchment area of a particular site.1.1.2 This practice characterizes rainwater quality in general and identifies site conditions that may affect rainwater qualit
4、y.Where site conditions affecting rainwater exist, additional assessment techniques may be required.1.1.3 Objectives guiding the development of this practice are (1) to synthesize and put in writing good commercial andcustomary practice for rainwater quality assessment; (2) to facilitate high qualit
5、y, standardized water stewardship protocols; and(3) to clarify a standard of due diligence that is practical and reasonable.1.2 This practice does not establish design requirements for rainwater harvesting systems. However, it may provide informationin support of decisions relative to design and imp
6、lementation of rainwater harvesting projects.1.3 This practice does not identify use(s) of rainwater, commercial or otherwise. However, it may provide information in supportof decisions relative to evaluation of property conditions and development options.1.4 This practice offers a set of instructio
7、ns for performing one or more specific operations. This document cannot replaceeducation or experience and should be used in conjunction with professional judgment.1.4.1 Water laws vary among governing jurisdictions. It is the responsibility of the user of this practice to determine regulatoryrequir
8、ements applicable to rainwater quality assessment and potential use(s).1.5 The values stated in SI units are to be regarded as standard. The values given in parentheses are mathematical conversionsto inch-pound units that are provided for information only and are not considered standard.1.6 This sta
9、ndard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety safety, health, and healthenvironmental practices and determine theapplicability of regulatory limitations prior to use.
10、1.7 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Principles for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Technical Barriers to Tr
11、ade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2E1527 Practice for Environmental Site Assessments: Phase I Environmental Site Assessment ProcessE1528 Practice for Limited Environmental Due Diligence: Transaction Screen ProcessE2114 Terminology for Sustainability Relative to the Perfor
12、mance of BuildingsE2635 Practice for Water Conservation in Buildings Through In-Situ Water Reclamation2.2 EPA Documents:Document:3CERCLA Comprehensive Environmental Response, Compensation and Liability Act, commonly known as Superfund1 This practice is under the jurisdiction ofASTM Committee E60 on
13、Sustainability and is the direct responsibility of Subcommittee E60.07 on Water Use and Conservation.Current edition approved July 1, 2010Feb. 1, 2018. Published October 2010March 2018. DOI:10.1520/E2727-10E01.Originally approved in 2010. Last previous editionapproved in 2010 as E2727-101. DOI:10.15
14、20/E2727-18.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standardsstandards Document Summary page on the ASTM website.3 Available from United States Environme
15、ntal ProtectionAgency (EPA),Ariel Rios William Jefferson Clinton Bldg., 1200 PennsylvaniaAve., NW, Washington, DC 20460,http:/www.epa.gov.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous ve
16、rsion. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM Internati
17、onal, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13. Terminology3.1 Definitions:3.1.1 For terms related to sustainability relative to the performance of buildings, refer to Terminology E2114.3.2 Definitions of Terms Specific to This Standard:3.2.1 adjacent sit
18、e, nany property or properties the border of which is contiguous or partially contiguous with that of theproperty, or that would be contiguous or partially contiguous with that of the property but for a street, road, public thoroughfare,or other physical barrier separating them.3.2.2 brownfield site
19、, nreal property, the expansion, redevelopment, or reuse of whichmay be complicated by the presence orpotential presence of a hazardous substance, pollutant, orcontaminant.3.2.2.1 DiscussionThe term “brownfield site“brownfield site” does not include a site described in Comprehensive Environmental Re
20、sponse,Compensation, and Liability Act (CERCLA), commonly known as Superfund, Section 101(39)(B), even though this languagetracks the definition of “brownfield site“ in CERCLA Section 101(39)(A) and (B).3.2.3 building department records, nthose records of the local government in which the property i
21、s located indicatingpermission of the local government to construct, alter, or demolish improvements on the property.3.2.4 catchment area, nsurface, including hard roofs, from which rainwater may be collected.3.2.5 first flush filter, ndevice that automatically diverts the first flow of rainwater co
22、llected from the catchment area.3.2.5.1 DiscussionA first flush filter device usually contains a temporary storage of 50100 L (13.2126.42 gal) (although size is determined byspecific design objectives of the rainwater harvesting system) and a simple valve unit consisting of a ball and seat. The init
23、ialrainfall fills the storage and floats the ball until it rises up to the seat, blocking the opening to the storage.3.2.6 intended user, nindividual or organization identified by the entity assessing rainwater quality as being the one who relieson that information to make decisions.3.2.6.1 Discussi
24、onThe intended user could be the client, the responsible party, program administrators, regulators, the financial community or otheraffected stakeholders, such as local communities, governmental agencies, or non-governmental organizations.3.2.7 nonpotable water, nwater that has not been treated for
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME27272018STANDARDPRACTICEFORASSESSMENTOFRAINWATERQUALITY 雨水 质量 评估 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-531773.html