ASTM E2137-2006 Standard Guide for Estimating Monetary Costs and Liabilities for Environmental Matters《评定环境情况的经济成本和负债的标准指南》.pdf
《ASTM E2137-2006 Standard Guide for Estimating Monetary Costs and Liabilities for Environmental Matters《评定环境情况的经济成本和负债的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2137-2006 Standard Guide for Estimating Monetary Costs and Liabilities for Environmental Matters《评定环境情况的经济成本和负债的标准指南》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 2137 06Standard Guide forEstimating Monetary Costs and Liabilities for EnvironmentalMatters1This standard is issued under the fixed designation E 2137; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last
2、 revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 PurposeThe purpose of this document is to provide astandard guide for estimating costs and liabilities for environ-mental
3、 matters.2Many possible uses for estimates of costs andliabilities for environmental matters exist, including but notlimited to business decision making, communications andnegotiations involving change of property ownership, regula-tory requirements, third-party lawsuits, insurance premiumcalculatio
4、n and claim settlement, change of property use,revitalization, compliance planning, construction, analysis ofremedial alternatives, budgeting, strategic planning, financing,and investment analysis by shareholders. The use of estimatedcosts and liabilities developed in accordance with this standardma
5、y be subject to other standards applicable to the matterinvolved. For example, it is not intended to supersede account-ing and actuarial standards including those by the FinancialAccounting Standards Board and the U.S. Security and Ex-change Commission. This standard does not address theestablishmen
6、t of reserves or disclosure requirements.1.2 ObjectivesThe objective of this standard is to provideguidance on approaches for estimating costs and liabilities forenvironmental matters.2. Referenced Documents3,42.1 ASTM Standards:E 1527 Practice for Environmental Site Assessments: PhaseI Environmenta
7、l Site Assessment ProcessE 1739 Guide for Risk-Based Corrective Action Applied atPetroleum Release SitesE 2081 Guide for Risk-Based Corrective ActionE 2091 Guide for Use of Activity and Use Limitations,Including Institutional and Engineering ControlsE 2205 Guide for Risk-Based Corrective Action for
8、Protec-tion of Ecological ResourcesE 2345 Practice for Investigating Electrical Incidents2.2 Other Document:EPA OSWER Directive 9610.17 Concerning Use of Risk-Based Decision Making, 199553. Terminology3.1 Definitions:3.1.1 activity and use limitations (AULs)legal or physicalrestrictions or limitatio
9、ns on the use of, or access to, a site orfacility to eliminate or minimize potential exposures to chemi-cals of concern, or to prevent activities that could interfere withthe effectiveness of a response action, to ensure maintenance ofa condition of “acceptable risk” or “no significant risk” tohuman
10、 health and the environment. These legal or physicalrestrictions are intended to prevent adverse impacts to indi-viduals or populations that may be exposed to chemicals ofconcern.3.1.2 allocation or allocated sharethe portion of cost orliability for which a party is responsible for payment orreimbur
11、sement.3.1.3 asset retirement obligationlegal obligations associ-ated with the retirement of a tangible long-lived asset thatresult from the acquisition, construction, development, ornormal operation of a tangible long-lived asset.3.1.4 costs and liabilitieseconomic expenses, accruedliabilities, ass
12、et retirement obligations, and loss contingencies.3.1.5 environmental complianceoperations, permits,equipment, facilities, products, records, documentation, re-ports, training, procedures, inspections, certifications, monitor-ing, controls, or other conditions or activities that mustconform to envir
13、onmental statutes including, but not limited to,CAA, CWA, OPA, RCRA, CERCLA, TSCA, FIFRA, SDWA,and state and local laws, as well as any international jurisdic-tional requirements.1This guide is under the jurisdiction ofASTM Committee E50 on EnvironmentalAssessment, Risk Management and Corrective Act
14、ion and is the direct responsibil-ity of Subcommittee E50.05 on Environmental Risk Management.Current edition approved Nov. 1, 2006. Published December 2006. Originallyapproved in 2001. Last previous edition approved in 2001 as E 2137 01.2For the purposes of this standard, costs and values are defin
15、ed as monetaryestimates.3Appendix X1 includes citations for additional relevant documents and require-ments from other organizations including FASB, SEC, and AICPA.4For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Boo
16、k of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.5Available from U.S. Environmental Protection Agency, 1200 PennsylvaniaAvenue, NW Washington, DC 20460.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428
17、-2959, United States.3.1.6 estimatoran individual or entity that prepares andanalyzes costs and liabilities.3.1.7 eventa condition or incident which occurred, or mayoccur, with respect to an environmental condition and/orenvironmental compliance issue, that affects or leads to poten-tial costs and l
18、iabilities. Examples of events include: a newrequirement for air emission controls (for example, NOx), ahazardous waste site that requires remediation, a claim forpersonal injury related to an alleged environmental incident, orthe need to comply with NPDES standards as a result of aprocess change.3.
19、1.8 fair valuean estimate of the price that could bereceived for an asset or paid to settle a liability in a currenttransaction between marketplace participants that are unre-lated, knowledgeable about factors relevant to the liability andthe transaction, able, and willing to transact in the referen
20、cemarket for the liability.3.1.9 liabilityan actual or potential obligation that may ormay not be accrued.3.1.10 orphan shareliability assigned to a PRP that can-not be located or that is insolvent, or the liability associatedwith pollutants which cannot be attributed to a PRP.3.1.11 potentially res
21、ponsible party (PRP)any individual,legal entity, or governmentincluding owners, operators,transporters, or generatorspotentially responsible for, orcontributing to, the environmental impacts at an event.3.1.12 studiesinvestigations such as regulatory interpreta-tions and applicability studies, compl
22、iance analysis, operatingscenarios study, engineering design and analysis, cost estima-tion, process hazard analysis, modeling, communication plans,preliminary investigation, sampling and analysis, site assess-ment, site characterization, Phase I and II studies, remedialaction plan, remedial investi
23、gation, contamination assessmentreport, feasibility study, risk assessment, treatability study,ecological impact assessment, environmental impact report,work plans, ASTM Risk-Based Corrective Action (RBCA)analysis, RCRA facility investigation, RCRA facility assess-ment, report of waste discharge, co
24、rrective measures study,corrective action report, health and safety plan, quality assur-ance plan, and other studies.3.2 Acronyms:3.2.1 AICPAAmerican Institute of Certified Public Ac-countants.3.2.2 AULsActivity and Use Limitations.3.2.3 CAAClean Air Act.3.2.4 CERCLAComprehensive Environmental Respo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME21372006STANDARDGUIDEFORESTIMATINGMONETARYCOSTSANDLIABILITIESFORENVIRONMENTALMATTERS 评定 环境 情况 经济

链接地址:http://www.mydoc123.com/p-530379.html