ASTM D6092-2014 3102 Standard Practice for Specifying Standard Sizes of Stone for Erosion Control《指定侵蚀控制用石材标准尺寸的标准实施规程》.pdf
《ASTM D6092-2014 3102 Standard Practice for Specifying Standard Sizes of Stone for Erosion Control《指定侵蚀控制用石材标准尺寸的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6092-2014 3102 Standard Practice for Specifying Standard Sizes of Stone for Erosion Control《指定侵蚀控制用石材标准尺寸的标准实施规程》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D6092 14Standard Practice forSpecifying Standard Sizes of Stone for Erosion Control1This standard is issued under the fixed designation D6092; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers size designations and maximumranges in mass or gradation for standard sizes for riprap, spalls,or bedding, or b
3、oth, used for slope protection of damembankments, streambank erosion control, bridge piers andabutments. Sizes used for outer harbor structures such asbreakwalls, revetments, confined diked disposal structures(heretofore described as armor stone, cover stone, or dimensionstone) for which stone sizes
4、 range between 5 and 25 tons, orthat require cut dimensions for layed-up structures are beyondthe scope of this practice.1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information
5、onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limi
6、tations prior to use.1.4 This practice offers an organized collection of informa-tion or a series of options and does not recommend a specificcourse of action. This document cannot replace education orexperience and should be used in conjunction with professionaljudgment. Not all aspects of this pra
7、ctice may be applicable inall circumstances. This ASTM standard is not intended torepresent or replace the standard of care by which theadequacy of a given professional service must be judged, norshould this document be applied without consideration of aprojects many unique aspects. The word “Standa
8、rd” in thetitle of this document means only that the document has beenapproved through the ASTM consensus process.2. Referenced Documents2.1 ASTM Standards:2D653 Terminology Relating to Soil, Rock, and ContainedFluidsD4992 Practice for Evaluation of Rock to be Used forErosion ControlD5519 Test Metho
9、ds for Particle Size Analysis of Naturaland Man-Made Riprap MaterialsE11 Specification for Woven Wire Test Sieve Cloth and TestSieves3. Terminology3.1 DefinitionsFor definitions of common technical termsin this practice, refer to Terminology D653.3.2 Definitions of Terms Specific to This Standard:3.
10、2.1 filter/bedding stone/spallsstone, filter stone consist-ing of crushed stone ranging in size from minus 2.0 in. (50mm) to No. 100 (150 m) and bedding stone, often referred toas “spalls,” consisting of crushed stone ranging in size fromminus 612 in. (163 mm) to No. 16 (1.18 mm). Filter andbedding
11、may be placed in two layers prior to the riprapplacement, that is, a filter layer 8 to 10 in. (200 to 250 mm)thick and a bedding layer of 6 to 8 in. (150 to 200 mm) thick.3.2.2 geotextilessuitable geotextile fabrics that meet thedesign requirements may be used instead of, or in conjunctionwith, the
12、above filter/bedding stone. Suitable cover thicknessmay be required.3.2.3 gradationthe proportions by mass of stones distrib-uted within specified ranges between maximum and minimumlimits.3.2.4 prolate spherea spheroid in which the polar axis isgreater than the equatorial diameter.3.2.5 riprapstone
13、materials generally less than 3000 lb inmass (1400 kg), specially selected and graded, and when1This practice is under the jurisdiction of ASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.17 on Rock for ErosionControl.Current edition approved Feb. 1, 2014. Publ
14、ished March 2014. Originallyapproved in 1997. Last previous edition approved in 2008 as D6092 97 (2008).DOI: 10.1520/D6092-14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information,
15、 refer to the standards Document Summary page onthe ASTM website.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1properly placed prevents erosion through minor wave acti
16、on,or strong currents and thereby preserves the shape of a surface,slope, or the underlying structure.3.2.6 standard size designationone of a group of stoneswith specified gradation limits.4. Summary of Practice4.1 The design team shall establish the size and mass ofgraded quarry stone using accepta
17、ble design criteria. If designcriteria and economic factors permit, standard gradationsshown in Tables 1 and 2 should be selected. If using standardsizes, the design team shall select the appropriate gradation;this might require selecting the next larger size, therebycreating an over-designed struct
18、ure, but one which is economi-cally a cheaper structure. Added cost may result due to theincreased volume of stone required, and in transporting andplacing the additional stone at the project site. The costeffectiveness of using “standard grading” versus “non-standardgrading” always should be evalua
19、ted, and standard gradingsused whenever possible.5. Significance and Use5.1 The standard size designations listed in this practice areprovided so that the design team, consumer, and the producerhave a common reference in sizing stone materials used inerosion control. The design team should assign a
20、materialssurvey, and rock quality testing series to determine whichquarry sources may have suitable in-place rock and performsuitable blasting and processing procedures to produce therequired gradations. The design team must recognize the factthat not all sources are capable of or willing to produce
21、 therequired gradations. Only those sources listed by the designteam should be considered for construction of the project.5.2 The standard size designations provided in this guide aresuitable for protective surfacing and structures designed forerosion control. These sizes are for typical structures
22、such asjetties, revetments, groin baffles, bulkheads, lining fordrainage/irrigation ditches and for intake or outlet facilities,bridges and stream channel banks, gabions, and slope protec-tion for earth embankment and rock-fill dams.5.3 The design selection of stone sizes, durability,placement, filt
23、er/bedding materials, or geotextiles, steepness ofslopes for placement, and layer thickness are beyond the scopeof this guide.6. Manufacture6.1 The standard size designations of quarried stone forerosion control in this guide may be produced by any suitablecommercial quarrying method, and by the use
24、 of any type ofsizing device, shape or size of plant grizzly or screen openings,or combinations thereof, necessary to produce the requiredsizes within the gradation limits specified in Section 7.6.2 Stones shall be hard, angular to subangular, and of suchquality that they will not disintegrate on ex
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD609220143102STANDARDPRACTICEFORSPECIFYINGSTANDARDSIZESOFSTONEFOREROSIONCONTROL 指定 侵蚀 控制 石材 标准 尺寸

链接地址:http://www.mydoc123.com/p-521514.html