ASTM C1840 C1840M-2017 Standard Practice for Inspection and Acceptance of Installed Reinforced Concrete Culvert Storm Drain and Storm Sewer Pipe《已安装钢筋混凝土排水管 雨水管和雨水污水管检查和验收的标准实施规程》.pdf
《ASTM C1840 C1840M-2017 Standard Practice for Inspection and Acceptance of Installed Reinforced Concrete Culvert Storm Drain and Storm Sewer Pipe《已安装钢筋混凝土排水管 雨水管和雨水污水管检查和验收的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1840 C1840M-2017 Standard Practice for Inspection and Acceptance of Installed Reinforced Concrete Culvert Storm Drain and Storm Sewer Pipe《已安装钢筋混凝土排水管 雨水管和雨水污水管检查和验收的标准实施规程》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1840/C1840M 17Standard Practice forInspection and Acceptance of Installed Reinforced ConcreteCulvert, Storm Drain, and Storm Sewer Pipe1This standard is issued under the fixed designation C1840/C1840M; the number immediately following the designation indicates theyear of original adopt
2、ion or, in the case of revision, the year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the requirements for inspection andacceptance of ins
3、talled reinforced concrete pipe by eitherperson-entry, or remote inspection as shown in Figs. 1 and 2,respectively.1.2 The scope of this specification is intended for installa-tion related observations and assumes that pre-installationinspection has been completed.1.3 The reinforced concrete culvert
4、, storm drain and stormsewer pipe shall be manufactured in accordance with Specifi-cation C76, C506, C507, C655,orC1417 and accepted inaccordance with AASHTO R073. This specification shall onlybe used for gravity, non-pressure storm drainage applications.1.4 Person Entry shall be used unless extenua
5、ting circum-stances preclude this type inspection. Remote inspection isacceptable for use for pipe diameters of 30 in. 750 mm andsmaller unless otherwise specified by owner or engineer.1.5 Access of installed pipe for manual inspection shallfollow OSHA 29 CFR PART 1926 SUBPART AA regulationsfor conf
6、ined space entry. However, this standard does notpurport to address all of the safety concerns, if any, associatedwith its use. It is the responsibility of the user of this standardto establish appropriate safety and health practices and deter-mine the applicability of regulatory limitations prior t
7、o use.1.6 This practice does not cover deformation or deflectionassessment. Concrete pipe is classified as a rigid structurebecause they do not bend or deflect appreciably under loadbefore cracking. Due to these facts shape evaluation are of littleor no value when evaluating concrete pipe.1.7 The va
8、lues stated in either Imperial/US or SI units areto be regarded separately as standard. The SI units are shownin brackets. The values stated in each system may not be exactequivalents; therefore, each system shall be used independentlyof the other.1.8 This international standard was developed in acc
9、or-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 AS
10、TM Standards:C76 Specification for Reinforced Concrete Culvert, StormDrain, and Sewer PipeC506 Specification for Reinforced Concrete Arch Culvert,Storm Drain, and Sewer PipeC507 Specification for Reinforced Concrete EllipticalCulvert, Storm Drain, and Sewer PipeC655 Specification for Reinforced Conc
11、rete D-LoadCulvert, Storm Drain, and Sewer PipeC822 Terminology Relating to Concrete Pipe and RelatedProductsC1417 Specification for Manufacture of Reinforced Con-crete Sewer, Storm Drain, and Culvert Pipe for DirectDesignD932 Practice for Filamentous Iron Bacteria in Water andWater-Formed Deposits2
12、.2 AASHTO Standards:AASHTO LRFD Bridge Design SpecificationAASHTO LRFD Bridge Construction Specification, Section27AASHTO PP63 Standard Practice for Pipe Joint Selectionfor Highway Culvert and Storm DrainsAASHTO R073 Standard Practice for Evaluation of PrecastConcrete Drainage Products2.3 Occupation
13、al Safety and Health Standards:OSHA 29 CFR Part 1926 Subpart AA for the ConstructionIndustry2.4 ISO/IEC Standards:ISO/IEC 17025 General Requirements for the Competenceof Testing and Calibration Laboratories3. Terminology3.1 For definitions of other terms relating to concrete pipenot defined in this
14、specification, see Terminology C822.1This test method is under the jurisdiction of ASTM Committee C13 onConcrete Pipe and is the direct responsibility of Subcommittee C13.05 on SpecialProjects.Current edition approved April 15, 2017. Published April 2017. DOI: 10.1520/C1840_C1840M-17Copyright ASTM I
15、nternational, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standar
16、ds, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.13.2 Definitions:3.2.1 calcium carbonate crystalsas shown in Fig. 3,crystals are formed when the carbon dioxide in the surroundingsoil, air and water carbonates the free (un-hydrated) ca
17、lciumoxide in the cement and the calcium hydroxide liberated by thehydration of the tricalcium silicate of the cement. This chemi-cal process results in white crystals along the pipe wall at acrack location and if it fills the crack is commonly referred toas autogenous healing.3.2.2 clock positionst
18、he relative circumferential position,direction or location of an observation on the pipe interior isdescribed using the analogy of a 12-hour clock as shown inFig. 4. For example, 12 oclock is the pipe crown; 3 oclock thespring line right; 6 oclock the invert; and 9 oclock the springline left. The vi
19、ewing orientation (upstream or downstream) ofthe clock position observations must be identified to establishthe spring line positions. When two clock positions are utilizedto characterize the location or relative size of an anomalywithin the pipe, the clock positions should be entered clock-wise (fo
20、r example, circumferential crack begins at 10 oclockand ends at 2 oclock).3.2.3 quadrantdescriptor for one fourth of the circumfer-ence of the pipe, or a circumferential 90-degree arc. Anexample quadrant shown in Fig. 5.FIG. 1 Person Entry InspectionFIG. 2 Remote Inspection CameraFIG. 3 Calcium Carb
21、onate Filled CrackFIG. 4 Clock PositionsFIG. 5 Pipe Wall QuadrantsC1840/C1840M 1723.2.4 cracka measurable surface separation found in con-crete indicating stress is being transferred from the concrete tothe reinforcement.3.2.4.1 circumferential cracka crack aligned with thecircumference of the pipe
22、and perpendicular to the longitudinalaxis of the pipe as shown in Fig. 6.3.2.4.2 hinge crackswhen more than one longitudinalcrack (at 12, 3, 6, or 9 oclock) occurs at the same cross sectionlocation in the pipe as shown in Fig. 7.3.2.4.3 longitudinal cracka crack aligned with the axis ofthe pipe as s
23、hown in Fig. 8.3.2.4.4 multi-directional cracka combination of longitu-dinal and circumferential cracks that intersect at one point asshown in Fig. 9.3.2.4.5 diagonal tension cracklongitudinal cracks 630 to60 degrees from the invert or obvert of the pipe (1-2 oclock,4-5 oclock, 7-8 oclock, or 10-11
24、oclock) with a visiblevertical offset across the crack.3.2.4.6 DiscussionNormal load induced longitudinalcracks can be present in the same locations but will not have avertical offset across the crack.3.2.5 engineerThe qualifications for an engineer involvedin the evaluation of installed RCP shall b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1840C1840M2017STANDARDPRACTICEFORINSPECTIONANDACCEPTANCEOFINSTALLEDREINFORCEDCONCRETECULVERTSTORMDRAINANDSTORMSEWERPIPE

链接地址:http://www.mydoc123.com/p-465905.html