ASTM C1103-2014 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线接头验收试验的标准实践规程》.pdf
《ASTM C1103-2014 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线接头验收试验的标准实践规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1103-2014 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线接头验收试验的标准实践规程》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1103 14Standard Practice forJoint Acceptance Testing of Installed Precast Concrete PipeSewer Lines1This standard is issued under the fixed designation C1103; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of
2、 last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for testing the joints ofinstalled precast concrete pipe sewer lines, when using eith
3、erair or water under low pressure to demonstrate the integrity ofthe joint and the construction procedures. This practice is usedfor testing 27-in. and larger diameter precast concrete sewerlines utilizing rubber gasket sealed joints.NOTE 1The user of this practice is advised that methods describedh
4、erein may also be used as a preliminary test to enable the manufactureror installer to demonstrate the condition of sewer pipe prior to delivery.1.2 This practice is the inch-pound companion to PracticeC1103M; therefore, no SI equivalents are presented in thepractice.NOTE 2The owner shall specify th
5、e following: who will conduct,observe, and furnish labor, material, and measuring devices and pay forthe tests; who is responsible for determining local ground conditions; andwhether an air or water test is to be used.NOTE 3The user of this practice is advised that test criteria presentedin this pra
6、ctice are similar to those in general use. Pipe shall be acceptedby infiltration or exfiltration testing utilizing Practice C969.NOTE 4Test times tabulated and the rate of air loss in this practice arebased on successful testing of installed pipelines. However, since air andwater have different phys
7、ical properties, retests of some pipelines notmeeting field air tests have been successful when tested with water.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate s
8、afety and health practices and determine the applica-bility of regulatory limitations prior to use. Specific precau-tions are given in Section 6.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and RelatedProductsC969 Practice for Infiltration and Exfiltration Ac
9、ceptanceTesting of Installed Precast Concrete Pipe Sewer Lines3. Terminology3.1 DefinitionsFor definitions of terms relating to concretepipe, see Terminology C822.4. Summary of Practice4.1 The joint in the sewer line to be tested is covered on theinside of the pipe by a ring with two end element sea
10、ling tubes.Air or water, at low pressure, is introduced through a connec-tion on the ring into the annular space between the ring andjoint. The amount of air, or water, loss is used to determine theacceptability of the installed sewer line.5. Significance and Use5.1 This is not a routine test. The v
11、alues recorded areapplicable only to the sewer being tested and at the time oftesting.6. Safety Precautions6.1 The use of compressed air is dangerous if a sewer line isnot prepared properly and proper procedures are not followed.6.2 It is imperative that all pressures be relieved completelybefore th
12、e test apparatus is loosened for removal.6.3 Pressurizing lines for the two end element sealing tubesshall be separate from the lines for pressurizing the voidvolume created by the joint test apparatus. The pressuresrequired to seal the end element tubes shall be as specified bythe apparatus manufac
13、turer, and are greater than the pressurerequired to test the joint. The line for pressurizing the voidvolume shall include a 6-psi pressure relief device to reducehazards and avoid overpressurization.7. Preparation of the Sewer Joint7.1 Check the size of access openings to ensure that the testappara
14、tus will fit in the sewer line.7.2 Clean the joint and interior joint surfaces to eliminatedebris prior to wetting and testing.NOTE 5The user of this practice is advised that a wetted interiorsurface is desirable and will produce more consistent results. Air may passthrough the walls of dry pipe. Th
15、is can be overcome by wetting the pipe.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved Nov. 15, 2014. Published November 2014. Originallyapproved in 1989. Last previous
16、edition approved in 2009 as C1103 03(2009).DOI: 10.1520/C1103-14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM webs
17、ite.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States17.3 Review safety precautions in Section 6.8. Procedures8.1 The following procedures apply to testing with either airor water.8.1.1 Determine groundwater conditions surrounding these
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC11032014STANDARDPRACTICEFORJOINTACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINES 安装 预制

链接地址:http://www.mydoc123.com/p-463388.html