ASTM C1103-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准规程》.pdf
《ASTM C1103-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1103-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准规程》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1103 03Standard Practice forJoint Acceptance Testing of Installed Precast Concrete PipeSewer Lines1This standard is issued under the fixed designation C 1103; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year
2、of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for testing the joints ofinstalled precast concrete pipe sewer lines, when using e
3、itherair or water under low pressure to demonstrate the integrity ofthe joint and the construction procedures. This practice is usedfor testing 27-in. and larger diameter precast concrete sewerlines utilizing rubber gasket sealed joints.NOTE 1The user of this test method is advised that methods desc
4、ribedherein may also be used as a preliminary test to enable the manufactureror installer to demonstrate the condition of sewer pipe prior to delivery.1.2 A complete metric companion to Practice C 1103 hasbeen developedC 1103M; therefore, no metric equivalentsare presented in this practice.NOTE 2The
5、 owner shall specify the following: who will conduct,observe, and furnish labor, material, and measuring devices and pay forthe tests; who is responsible for determining local ground conditions; andwhether an air or water test is to be used.NOTE 3The user of this practice is advised that test criter
6、ia presentedin this practice are similar to those in general use. Pipe 24-in. diameter andsmaller shall be accepted by infiltration or exfiltration testing utilizingPractice C 969 or by low pressure air testing utilizing Practice C 924. Pipegreater than 24-in. diameter shall be accepted by infiltrat
7、ion or exfiltrationtesting utilizing C 969.NOTE 4The user of this practice is advised that no correlation hasbeen found between air loss and water leakage.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of
8、this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. Specific precau-tions are given in Section 6.2. Referenced Documents2.1 ASTM Standards:2C 822 Terminology Relating to Concrete Pipe and RelatedProductsC 924 Pr
9、actice for Testing Concrete Pipe Sewer Lines byLow-Pressure Air Test MethodC 969 Practice for Infiltration and Exfiltration AcceptanceTesting of Installed Precast Concrete Pipe Sewer Lines3. Terminology3.1 DefinitionsFor definitions of terms relating to con-crete pipe, see Terminology C 822.4. Summa
10、ry of Practice4.1 The joint in the sewer line to be tested is covered on theinside of the pipe by a ring with two end element sealing tubes.Air or water, at low pressure, is introduced through a connec-tion on the ring into the annular space between the ring andjoint. The amount of air, or water, lo
11、ss is used to determine theacceptability of the installed sewer line.5. Significance and Use5.1 This is not a routine test. The values recorded areapplicable only to the sewer being tested and at the time oftesting.6. Safety Precautions6.1 The use of compressed air is dangerous if a sewer line isnot
12、 prepared properly and proper procedures are not followed.6.2 It is imperative that all pressures be relieved completelybefore the test apparatus is loosened for removal.6.3 Pressurizing lines for the two end element sealing tubesshall be separate from the lines for pressurizing the voidvolume creat
13、ed by the joint test apparatus. The pressuresrequired to seal the end element tubes shall be as specified bythe apparatus manufacturer, and are greater than the pressurerequired to test the joint. The line for pressurizing the voidvolume shall include a 6-psi pressure relief device to reducehazards
14、and avoid overpressurization.7. Preparation of the Sewer Joint7.1 Check the size of access openings to ensure that the testapparatus will fit in the sewer line.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Me
15、thods of Test.Current edition approved November 1, 2003. Published January 2004. Originallyapproved in 1989. Last previous edition approved in 2002 as C 110302.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of
16、 ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.7.2 Clean the joint and interior joint surfaces to eliminatedebris prior to wetting an
17、d testing.NOTE 5The user of this practice is advised that a wetted interiorsurface is desirable and will produce more consistent results. Air may passthrough the walls of dry pipe. This can be overcome by wetting the pipe.7.3 Review safety precautions in Section 6.8. Procedures8.1 The following proc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC11032003STANDARDPRACTICEFORJOINTACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINES 安装 预制

链接地址:http://www.mydoc123.com/p-463386.html