ASME PTC 47-2006 Integrated Gasification Combined Cycle Power Generation Plants《整体气化联合循环发电厂》.pdf
《ASME PTC 47-2006 Integrated Gasification Combined Cycle Power Generation Plants《整体气化联合循环发电厂》.pdf》由会员分享,可在线阅读,更多相关《ASME PTC 47-2006 Integrated Gasification Combined Cycle Power Generation Plants《整体气化联合循环发电厂》.pdf(102页珍藏版)》请在麦多课文档分享上搜索。
1、AN AMERICAN NATIONAL STANDARDIntegrated Gasification CombinedCycle Power Generation PlantsASME PTC 47-2006Performance Test CodesASME PTC 47-2006IntegratedGasificationCombinedCycle PowerGenerationPlantsPerformance Test CodesAN AMERICAN NATIONAL STANDARDThree Park Avenue New York, NY 10016Date of Issu
2、ance: January 22, 2007This Code will be revised when the Society approves the issuance of a new edition. There will be noaddenda issued to ASME PTC 47-2006.ASME issues written replies to inquiries as code cases and interpretations of technical aspects ofthis document. Code cases and interpretations
3、are published on the ASME website under theCommittee Pages at http:/cstools.asme.org as they are issued.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStanda
4、rds. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additio
5、nal public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with an
6、yitems mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent r
7、ights, and the risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only
8、those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written
9、 permission of the publisher.The American Society of Mechanical EngineersThree Park Avenue, New York, NY 10016-5990Copyright 2007 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSNotice . vForeword viCommittee Roster . viiCorrespondence With the PTC 47 Commit
10、tee . ixIntroduction . xSection 1 Object and Scope . 11-1 Object . 11-2 Scope 11-3 Uncertainty 1Section 2 Definitions and Descriptions of Terms 32-1 Definitions . 32-2 Symbols Used in Equations 102-3 Subscripts Used in Equations . 10Section 3 Guiding Principles. 113-1 Introduction . 113-2 Test Bound
11、ary and Required Measurements 113-3 Test Plan 133-4 Test Preparations 133-5 Conduct of Test 143-6 Calculation and Reporting of Results . 16Section 4 Instruments and Methods of Measurement 174-1 General Requirements 174-2 Pressure Measurement . 174-3 Temperature Measurement . 184-4 Solids Flow Measur
12、ement 244-5 Liquid Flow Measurement . 284-6 Gaseous Flow Measurement 314-7 Material Analysis 334-8 Input and Output Heat Measurement . 334-9 Electrical Generation Measurement . 344-10 Collection and Handling . 42Section 5 Calculations and Results. 445-1 Test Result Equations 445-2 Calculated (Derive
13、d) Terms 485-3 Measured Terms . 505-4 Corrections 51Section 6 Report of Results 566-1 General Requirements 566-2 Executive Summary 566-3 Introduction . 566-4 Calculations and Results . 566-5 Instrumentation 566-6 Conclusions . 576-7 Appendices 57iiiFigures3-2.2-1 IGCC Plants With Air Separation Unit
14、 123-2.2-2 IGCC Plants Without Air Separation Unit (Air-Blown, or Oxygen-BlownWith Separate ASU) . 124-3.1.3-1 Four-Wire RTDs . 194-3.1.3-2 Three-Wire RTDs . 194-3.3.2 Flow-Through Well 204-3.3.3.1 Sampling Grids for Rectangular Ducts 224-3.3.3.2 Sampling Grid for Circular Ducts 234-9.1.1 Three-Wire
15、 Metering Systems 364-9.1.2 Four-Wire Metering Systems: Connections for Three Wattmeters or OneThree-Element Watt-Hour Meter . 37Tables1-3 Largest Expected Test Uncertainties 23-5.2-1 Guidance for Establishing Permissible Deviations From Design 153-5.2-2 Typical Stabilization Times and Recommended T
16、est Run Durations 164-4.1.2 Typical Systematic Uncertainty for Flow Measurements . 254-4.5.2-1 Typical ASTM Standard Test Repeatability for Coal and Coke Properties 294-4.5.2-2 Typical Systematic Uncertainty for Limestone Properties 304-5.2 Typical ASTM Standard Test Repeatability for Fuel Oil Prope
17、rties . 324-9.1 Metering Method Restrictions Summary 355-3 List of Measured Terms 515-4.2.2-1 Additive and Multiplicative Correction Factors . 545-4.2.2-2 Additive Correction Terms . 555-4.2.2-3 Multiplicative Correction Terms 55Nonmandatory AppendicesA Uncertainty Analysis . 59B Sample Calculation
18、for Air-Blown IGCC 62C Sample Calculation for Oxygen-Blown IGCC Including ASU 74D Inlet Air Conditions and Corrections . 82E Sample Calculation for Electric Power Generation . 85ivNOTICEAll Performance Test Codes must adhere to the requirements of ASME PTC 1, General Instruc-tions. The following inf
19、ormation is based on that document and is included here for emphasisand for the convenience of the user of the Code. It is expected that the Code user is fully cognizantof Sections 1 and 3 of ASME PTC 1 and has read them prior to applying this Code.ASME Performance Test Codes provide test procedures
20、 that yield results of the highest levelof accuracy consistent with the best engineering knowledge and practice currently available.They were developed by balanced committees representing all concerned interests and specifyprocedures, instrumentation, equipment-operating requirements, calculation me
21、thods, and uncer-tainty analysis.When tests are run in accordance with a Code, the test results themselves, without adjustmentfor uncertainty, yield the best available indication of the actual performance of the tested equip-ment. ASME Performance Test Codes do not specify means to compare those res
22、ults to contractualguarantees. Therefore, it is recommended that the parties to a commercial test agree before startingthe test and preferably before signing the contract on the method to be used for comparing thetest results to the contractual guarantees. It is beyond the scope of any Code to deter
23、mine orinterpret how such comparisons shall be made.vFOREWORDASME Performance Test Codes (PTCs) have been developed and have long existed for determin-ing the performance of most major components used in electric power production facilities. APerformance Test Code has heretofore not existed to deter
24、mine the overall performance of anintegrated gasification combined cycle (IGCC) power generation plant. The ability to fire a widerange of fuels has been a key advantage of gas turbines over competing technologies. Untilrecently, the traditional fuels for gas turbines have been natural gas and disti
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEPTC472006INTEGRATEDGASIFICATIONCOMBINEDCYCLEPOWERGENERATIONPLANTS 整体 气化 联合 循环 发电厂 PDF

链接地址:http://www.mydoc123.com/p-456850.html