ASME B31 9 INTERPRETATIONS-2010 Interpretations to B31 9-1996 Building Services Piping (Includes Interpretation March 1987 through November 2010)《B31 9-1996的解释 建筑结构用管》.pdf
《ASME B31 9 INTERPRETATIONS-2010 Interpretations to B31 9-1996 Building Services Piping (Includes Interpretation March 1987 through November 2010)《B31 9-1996的解释 建筑结构用管》.pdf》由会员分享,可在线阅读,更多相关《ASME B31 9 INTERPRETATIONS-2010 Interpretations to B31 9-1996 Building Services Piping (Includes Interpretation March 1987 through November 2010)《B31 9-1996的解释 建筑结构用管》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、ASME B31.9 INTERPRETATIONSASME B31.9 INTERPRETATIONSReplies to Technical InquiriesOctober 2007 Through November 2010FOREWORDIt has been agreed to publish interpretations isssued by the B31 Committee concerning B31.9as part of the update service to the Code. The interpretations have been assigned num
2、bers inchronological order. Each interpretation applies to the latest Edition at the time of issuance ofthe interpretation or the Edition stated in the reply. Subsequent revisions to the Code may havesuperseded the reply.These replies are taken verbatim from the original letters, except for a few ty
3、pographical andeditorial corrections made for the purpose of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a technical nature. In these cases, a revisedreply, bearing the original interpretation number with the suffix R, is presented. In the ca
4、se whereaninterpretationiscorrectedbyErrata,theoriginalinterpretationnumberwiththesuffixEisused.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation. Further,persons aggrieved by
5、 an interpretation may appeal to the cognizant ASME committee or subcom-mittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,”“certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.For detailed instructions on the preparation of
6、technical inquiries to the B31 Committee, referto Mandatory Appendix IV.I-1ASME B31.9 INTERPRETATIONSInterpretation: 9-16Subject: Piping Designed to B31.1 RequirementsDate Issued: January 27, 2010File: 09-1586Question: Does piping that is designed and constructed in accordance with ASME B31.1 meetth
7、e design and construction requirements of B31.9?Reply: Yes, provided the wall thickness meets the requirements of para. 904.1.1 using theallowable stress specified in Table I-1 and as long as the pressure, temperature, size, etc. arewithin the scope of B31.9-2008, para. 900.1.I-2ASME B31.9 INTERPRET
8、ATIONSASME B31.9 INTERPRETATIONSReplies to Technical InquiriesJanuary 2003 Through August 2007FOREWORDIt has been agreed to publish interpretations isssued by the B31 Committee concerning B31.9as part of the update service to the Code. The interpretations have been assigned numbers inchronological o
9、rder. Each interpretation applies to the latest Edition at the time of issuance ofthe interpretation or the Edition stated in the reply. Subsequent revisions to the Code may havesuperseded the reply. The interpretations are not part of the Code.These replies are taken verbatim from the original lett
10、ers, except for a few typographical andeditorial corrections made for the purpose of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a technical nature. In these cases, a revisedreply, bearing the original interpretation number with the suffix R,
11、 is presented. In the case whereaninterpretationiscorrectedbyErrata,theoriginalinterpretationnumberwiththesuffixEisused.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation. Furt
12、her,persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcom-mittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,”“certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.For detailed instruction
13、s on the preparation of technical inquiries to the B31 Committee, referto Mandatory Appendix IV.I-1ASME B31.9 INTERPRETATIONSInterpretation: 9-13Subject: Initial Service Leak Testing (1996 Edition)Date Issued: October 26, 2006File: 06-37Question: Is initial service leak testing in lieu of a hydrosta
14、tic test permissible for a watersystem with a 150 psig design pressure, 150F design temperature, and a maximum operatingpressure of 100 psig?Reply: Yes; see para. 937.1.Interpretation: 9-14Subject: Paragraph 907.1.2, Use of Ball Valves Manufactured to MSS SP-110 (1996 Edition)Date Issued: August 1,
15、2007File: 07-1249Question: May bronze ball valves meeting the requirements of MSS SP-110 made from ASTMB 61, C92200 or ASTM B 62, C93600, be used for construction to the requirements of ASMEB31.9-2004?Reply: Yes. The manufacturer of the valve shall be responsible for establishing the pressureand tem
16、perature limits for their use.Interpretation: 9-15Subject: Paragraph 927.6.3, Welder Qualification (2004 Edition)Date Issued: August 21, 2007File: 06-1179Question: Does B31.9, para. 927.6.3, permit continuity records to be updated by the employerof a welder or brazer even though the welder or brazer
17、s current employer may not be the sameemployer who qualified that welder?Reply: Yes.I-2ASME B31.9 INTERPRETATIONSASME B31.9 INTERPRETATIONSReplies to Technical InquiriesJanuary 2003 Through August 2007FOREWORDIt has been agreed to publish interpretations isssued by the B31 Committee concerning B31.9
18、as part of the update service to the Code. The interpretations have been assigned numbers inchronological order. Each interpretation applies to the latest Edition at the time of issuance ofthe interpretation or the Edition stated in the reply. Subsequent revisions to the Code may havesuperseded the
19、reply. The interpretations are not part of the Code.These replies are taken verbatim from the original letters, except for a few typographical andeditorial corrections made for the purpose of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a tech
20、nical nature. In these cases, a revisedreply, bearing the original interpretation number with the suffix R, is presented. In the case whereaninterpretationiscorrectedbyErrata,theoriginalinterpretationnumberwiththesuffixEisused.ASME procedures provide for reconsideration of these interpretations when
21、 or if additionalinformation is available which the inquirer believes might affect the interpretation. Further,persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcom-mittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,”“cert
22、ify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.For detailed instructions on the preparation of technical inquiries to the B31 Committee, referto Mandatory Appendix IV.I-1ASME B31.9 INTERPRETATIONSInterpretation: 9-13Subject: Initial Service Leak Testing (1996 Edit
23、ion)Date Issued: October 26, 2006File: 06-37Question: Is initial service leak testing in lieu of a hydrostatic test permissible for a watersystem with a 150 psig design pressure, 150F design temperature, and a maximum operatingpressure of 100 psig?Reply: Yes; see para. 937.1.Interpretation: 9-14Subj
24、ect: Paragraph 907.1.2, Use of Ball Valves Manufactured to MSS SP-110 (1996 Edition)Date Issued: August 1, 2007File: 07-1249Question: May bronze ball valves meeting the requirements of MSS SP-110 made from ASTMB 61, C92200 or ASTM B 62, C93600, be used for construction to the requirements of ASMEB31
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB319INTERPRETATIONS2010INTERPRETATIONSTOB3191996BUILDINGSERVICESPIPINGINCLUDESINTERPRETATIONMARCH1987THROUGHNOVEMBER2010B3191996

链接地址:http://www.mydoc123.com/p-456560.html