1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.00 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 45 0
2、0.00 10QUALITY CONTROL02/10PART 1 GENERAL1.1 REFERENCES1.2 PAYMENTPART 2 PRODUCTSPART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.2 QUALITY CONTROL PLAN3.2.1 Content of the CQC Plan3.2.2 Additional Requirements for Design Quality Control (DQC) Plan3.2.3 Acceptance of Plan3.2.4 Notification of Changes3.3 CO
3、ORDINATION MEETING3.4 QUALITY CONTROL ORGANIZATION3.4.1 Personnel Requirements3.4.2 CQC System Manager3.4.3 CQC Personnel3.4.4 Additional Requirement3.4.5 Organizational Changes3.5 SUBMITTALS AND DELIVERABLES3.6 CONTROL3.6.1 Preparatory Phase3.6.2 Initial Phase3.6.3 Follow-up Phase3.6.4 Additional P
4、reparatory and Initial Phases3.7 TESTS3.7.1 Testing Procedure3.7.2 Testing Laboratories3.7.2.1 Capability Check3.7.2.2 Capability Recheck3.7.3 Onsite Laboratory3.7.4 Furnishing or Transportation of Samples for TestingSECTION 01 45 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networ
5、king permitted without license from IHS-,-,-3.8 COMPLETION INSPECTION3.8.1 Punch-Out Inspection3.8.2 Pre-Final Inspection3.8.3 Final Acceptance Inspection3.9 DOCUMENTATION3.10 SAMPLE FORMS3.11 NOTIFICATION OF NONCOMPLIANCE- End of Section Table of Contents -SECTION 01 45 00.00 10 Page 2Provided by I
6、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.00 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
7、April 2010*SECTION 01 45 00.00 10QUALITY CONTROL02/10*NOTE: This guide specification covers requirements for Contractor Quality Control for construction projects or design-build construction projects.Edit this guide specification for project specific requirements by adding, deleting, or revising tex
8、t. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical pr
9、oponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list t
10、he publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections
11、 Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 01 45 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References
12、 not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within t
13、he text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 3740 (2008) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and ConstructionASTM E 329 (2009) Standard Specification for Agencies Engaged in the Testing and
14、/or Inspection of Materials Used in ConstructionU.S. ARMY CORPS OF ENGINEERS (USACE)ER 1110-1-12 (2006; Change 1) Engineering and Design - Quality Management1.2 PAYMENTSeparate payment will not be made for providing and maintaining an effective Quality Control program, and all associated costs will
15、be included in the applicable Bid Schedule unit or lump-sum prices.PART 2 PRODUCTSNot UsedPART 3 EXECUTION3.1 GENERAL REQUIREMENTS*NOTE: Selection of construction or design-build construction text required.*Establish and maintain an effective quality control (QC) system in compliance with the Contra
16、ct Clause titled “Inspection of Construction.“ QC consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. Cover all construction design and construction operations, both onsite and offsite, and be keyed to the proposed constru
17、ction design and construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context the highest level manager responsible f
18、or the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent must maintain a SECTION 01 45 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-physical prese
19、nce at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.3.2 QUALITY CONTROL PLAN*NOTE: Selection of construction or design-build construction text required.*Submit no later than _ days after re
20、ceipt of notice to proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled “Inspection of Construction.“ The Government will consider an interim plan for the first _ days of operation. Construction Design and construction will be permit
21、ted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional wo
22、rk.3.2.1 Content of the CQC PlanInclude, as a minimum, the following to cover all design and constructionconstruction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agentssubcontractors, designers of record, consultants, architect/engine
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS01450000102010QUALITYCONTROL 质量 控制 PDF

链接地址:http://www.mydoc123.com/p-449506.html