1、AMSC N/A AREA QCICDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.DEPARTMENT OF DEFENSETEST METHOD STANDARDDOD PREFERRED METHODSFOR ACCEPTANCE OF PRODUCTNOT MEASUREMENTSENSITIVEMIL-STD-19161 April 1996Provided by IHSNot for ResaleNo reproduction or networking permitt
2、ed without license from IHS-,-,-MIL-STD-1916iiF O R E W O R D1. This Military Standard is approved for use by all Departments and Agencies of theDepartment of Defense (DoD).2. Beneficial comments (recommendations, additions, deletions) and any pertinent datawhich may be of use in improving this docu
3、ment should be addressed to: Commander, U.S.Army Armament Research, Development and Engineering Center, ATTN: AMSTA-AR-EDE-S,Picatinny Arsenal, NJ 07806-5000, by using the self-addressed Standardization DocumentImprovement Proposal (DD Form 1426) appearing at the end of this document or by letter.3.
4、 DoD procurement practices encourage industry innovation and provide flexibility toachieve the benefits of continuous improvement.4. There is an evolving industrial product quality philosophy that recognizes the need forquality policy changes that will provide defense contractors with opportunities
5、and incentivestoward improvement of product quality and cooperative relationships between the contractor andthe Government.5. Process controls and statistical control methods are the preferable means of preventingnonconformances, controlling quality, and generating information for improvement. Aneff
6、ective process control system may also be used to provide information to assess the quality ofdeliverables submitted for acceptance. Suppliers are encouraged to use process control andstatistical control procedures for their internal control and to submit effective process controlprocedures in lieu
7、of prescribed sampling requirements to the Government for approval.6. Sampling inspection by itself is an inefficient industrial practice for demonstratingconformance to the requirements of a contract and its technical data package. The application ofsampling plans for acceptance involves both consu
8、mer and producer risks; and increasedsampling is one way of reducing these risks, but it also increases costs. Suppliers can reducerisks by employing efficient processes with appropriate process controls. To the extent that suchpractices are employed and are effective, risk is controlled and, conseq
9、uently, inspection andtesting can be reduced.7. The following points provide the basis for this standard:a. Contractors are required to submit deliverables that conform to requirements and togenerate and maintain sufficient evidence of conformance.b. Contractors are responsible for establishing thei
10、r own manufacturing and processcontrols to produce results in accordance with requirements.c. Contractors are expected to use recognized prevention practices such as processcontrols and statistical techniques.8. This standard also provides a set of sampling plans and procedures for planning andcondu
11、cting inspections to assess quality and conformance to contract requirements. Thisstandard complies with the DoD policy of eliminating acceptable quality levels (AQLs) andassociated practices within specifications.Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
12、rom IHS-,-,-MIL-STD-1916C O N T E N T SPARAGRAPH PAGEiii1. SCOPE . 11.1 Scope 11.2 Applicability . 11.3 Applications 11.4 Product requirements 11.5 Limitations 22. APPLICABLE DOCUMENTS 32.1 General. 32.2 Non-Government publications. 32.3 Order of precedence 43. DEFINITIONS 53.1 Acronyms used in this
13、 standard. 53.2 Acceptance. 53.3 Contract quality requirements 53.4 Critical characteristic. 53.5 Critical nonconforming unit. 53.6 Government contract quality assurance 63.7 Inspection. 63.8 Major characteristic. 63.9 Major nonconforming unit. 63.10 Minor characteristic 63.11 Minor nonconforming un
14、it. 63.12 Nonconformance. 63.13 Nonconforming unit 63.14 Production interval 63.15 Quality 63.16 Quality assurance 63.17 Quality audit. 63.18 Quality program 63.19 Screening inspection 73.20 Traceability. 73.21 Verification level (VL) 74. GENERAL REQUIREMENTS. 84.1 Acceptance by contractor-proposed
15、provisions 84.1.1 General. 84.1.2 Requirements and procedures 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1916C O N T E N T SPARAGRAPH PAGEiv4.1.3 Submission and incorporation 94.1.3.1 Submission 94.1.3.2 Incorporation 94.1.4 Withdrawal
16、of approval of alternates. 94.2 Acceptance by tables. 94.2.1 Preferred sampling plans 94.2.2 Formation and identification of lots or batches. 94.2.3 Determination of sampling plan. 104.2.4 Sampling of lots or batches 104.2.4.1 Selection of units. 104.2.4.2 Representative (stratified) sampling. 104.2
17、.4.3 Process of sampling. 104.2.4.4 Non-conforming product. 104.3 Disposition of nonconforming product 114.4 Critical characteristics. 114.5 Special reservations for critical nonconformance 115. DETAILED REQUIREMENTS 125.1 Acceptance by contractor proposed-provisions . 125.1.1 Quality system plan. 1
18、25.1.2 Prevention-based quality system 125.1.3 Process focus of quality system. 125.1.4 Objective evidence of quality system implementation and effectiveness 135.1.4.1 Examples of evidence regarding process improvement. 135.1.4.2 Examples of evidence regarding process control 135.1.4.3 Examples of e
19、vidence regarding product conformance. 145.2 Acceptance by tables. 145.2.1 Sampling inspection 145.2.1.1 Verification level specification. 145.2.1.2 Sampling procedures. 155.2.1.3 Switching procedures 155.2.1.3.1 Normal to tightened 155.2.1.3.2 Tightened to normal 165.2.1.3.3 Normal to reduced 165.2
20、.1.3.4 Reduced to normal 165.2.1.4 Discontinuation of acceptance. 165.2.2 Preferred sampling inspection tables 175.2.2.1 Attributes sampling plans for lot or batch inspection 175.2.2.1.1 Acceptability criterion. 17Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
21、rom IHS-,-,-MIL-STD-1916C O N T E N T SPARAGRAPH PAGEv5.2.2.2 Variables sampling plans for lot or batch inspection. 175.2.2.2.1 Limitations on use. 175.2.2.2.2 Nonconforming unit 185.2.2.2.3 Acceptability criteria. 185.2.2.3 Continuous attributes sampling inspection plans 205.2.2.3.1 Conditions for
22、continuous sampling procedures. 205.2.2.3.2 Continuous sampling inspection procedure 215.2.2.3.3 Acceptability criterion. 215.2.2.3.3.1 Special reservation for critical nonconforming unit 216. NOTES 226.1 Intended use 226.2 Issue of DoDISS. 226.3 Supersession data 226.4 Subject term (keyword listing
23、). 22TABLEI Code letters (CL) for entry into the sampling tables. 15II Attributes sampling plans 17III Variables sampling plans. 19IV Continuous sampling plans 20APPENDIX Examples of sampling plan use 23FIGURE1 Attributes sampling inspection log. 242 Computations for single specification limit case.
24、 253 Computations for double specification limit case 264 Continuous sampling inspection log. 275 Procedure to determine a valid f 28CONCLUDING MATERIAL 29Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-191611. SCOPE1.1 Scope. The purpose of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILSTD19161996DODPREFERREDMETHODSFORACCEPTANCEOFPRODUCT 验收 国防部 首选 方法 PDF

链接地址:http://www.mydoc123.com/p-448364.html