1、- t MIL-R-55165 61 = 9999906 0093907 3 3 -/5-$/ MILITARY SPEC I Fi CATION MI L-R-55165 (SigC) 15 March 1962 RECTIFIER BATTERY CHARGER PP-255( )/FT 1. SCOPE 1.1 Scope.- This specification covers one type of full wave, metallic, regulated rectifier designed to suppiy power to a telephone system and to
2、 charge lead-acid type stom e batteries within its rated capacity, designated as “Rectifier Battery Charger PP-255( )/fV, .(See 3. i) 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, form a part of this specification to the extent specified h
3、erein. SPEC1 F!CATlOlS FED ERAL PPP-B-621 PPP-B-636 Eox, Fiberboard PP P-T-76 QQ-S-571 Solder: Lead Alloy, Tin Lead Alloy, and Tin Alloy; Boxes, Wood, Nailed and Lock Corner Tape , Pressure-Sensitive Adhesive Paper, Water Resistant Flux Cored Ribbon and Wire, and Solid Form . T-T-871 Twine, Cotton,
4、Wrapping MI LITARY MIL-P-116 Preservation, Methods of MI L-B-117 Bags, Interibted charger consisting of a single component containing two saturable reactor-taTc regulators and a dry disk rectifier. sheet metal ca6e intended for wall mounting. power to a telephone system and 16 also capable of chargi
5、ng lead-wid type etoyge batteries with duty ratings of 23 cells. The charger can operate *thin 8 9 to 130 ac input voltage range, 60 cycle 80ce; hm an OPU of 48.5 to 50.5 volta de for a load variation of .3 to 2.4 amperes, and Can be wed with either positm or negative ground system. The charger i8 c
6、apable of supplyilq; 2 Licensed by Information Handling ServicesMIL-R-55165 61 W 7779706 O073909 7 W 3.2 Construction.- The equipment sliaU. be constructed in accordarice 31th m8dnE; SC=D,-+76563. 3.3 Preproduction samples.- The contrsctor shell furnish two 0) pre- production sompies for opprovol, p
7、rovided the invitatjon for bids and the contract requires samples. 3.4 Sol6ering.- 3.4.1 Solder.- Solder shall ninn to specfication cl however, exception is permitted for preliminary tinning of electrical connections end fer tinning or soldering of mechanical joints got Ued +,o compiete electrical c
8、ircuits, ?ut in no ctme shall acid or mid Baits be used uhere they can come in contact with insulation material. Uhere acid or Scld Saita are wed, a8 permitted aboye, they shall be completely neutrazed and Te- moved imediately after we. 3.4.3 rocess.- There EII be no 6- points or rough surfaces rcsu
9、ltine from insufficient heating, me solder shall feather out to a thin edge, %ndicatiw proper flowing ana vetting action, and shall not be cryetalli?,ed, overheatsea, or Under-heated. The ll nat. infur the risk of loose particles of flux, brush brI flux being spread over a weer mea; Or danage to the
10、 equipment. Insulation material thtrt bas been subjected to Beating durlng the srildeing operation shall be undamaged and gart8 fastened thereto Shall not have becoue loosened. . 3.5 Cleaning.- 3.5.1 Parts.- After fabrication, paFts shall be cleaned in accordance wth Corrosive material shall be remo
11、ved good comercial practice, or as speciied in an asplicable document. Cleaning processes shall have no deleterious eifect. CoJqletLy before the part6 are mounted M obassis, panels, etCo 3 .S -2 Units .- Aiter msemby, units sba11 be cleaned thoroughly and cxposure at he high temperature extreme not
12、to exceed 4 hours, and at the low temperature extreme not to exceod 72 hours, at any one time. (b) Nonoperating: Exposure- in the range of +160F to -SOOF; exposure at the htgh temperature extreme not to exceed 4 hours, and at the low temperature extreme not to exceed 24 hours, at any one time. 3.9.2
13、 Relative humidity (see 4.14)i- Daily exposure up to 97 percent relative humidity for 20 hours; and exposure at 100 percent relative humidity, with condentation, for 4 hours, 3.9.3 Elevation see 4.15) (o) OperatinE Up to 10,000 feet above sea level, (b) Nonoperating: Up to 50,000 feet above rea leve
14、l. 3.9.4 - Shock.- The equipment shall meet the requirements of this specification when 3.10 jnjerchangeabilfty.- Like units, assemblies, subassemblies and replaceable parts tested in accordance with 4.11 shall be physically and functionally interchangeable, without modification of such items of the
15、 equipment. Individual items shall not be had-picked fw fit or performance. ReJfance shall not be placed on any unspecified dimension, rating, characteristic, etc. PROBLEM HARD COPY Licensed by Information Handling ServicesMIL-R-55365 63 W 7777906 0073733 5 MIL-R-55165(SlgC) -. . 3*11 Input.- The eq
16、uipment shall operate from an input of 95 to 130 volts, 60 cycles, single phase, alternating current power source. The current input shall not exceed 4.5 amperes for the output specified in 3.12 with an ambient temperature of 95OF or less. 3.12 atput.- Over the entire range of input voltage specifie
17、d, the output dc voltage shall be 48.5 to 50.5 volts dc for load variation of .3 to 2.4 amperes. The maximum continuous output current shall be 3 amperes, for ambient temperature of 95OF or less. For higher ambtent temperatures, the maximum continuous output current shall be as follows: 2.7 amperes
18、for ambient temperatures up to 105F; 2.4 amperes for ambient temperatures above lMoF UP t 1146 2.1 amperes for ombient,temperatuqs above iJ4OF up to 122F; and i .8 ampere.! for ambiei;:/ temperatures - reqliireinents as specified herein. kept as otherwise specified, the supplier may utilize his m or
19、 my other Inspection faclifties and sewces mccptdh of the examination and tests shall be kept complete and available to the Government QI sp4fi.d in the contract. The Government reserves the right to perform any of the inspectfans set Wh in the specification where such inspections are deemed neceuor
20、y to led by the Goverrment unless otherwise specified ln the contract. preproduction inspection specified in table 1, the inspecton specified in the subsidiary documents covering the Item listed in 4.4, and the ipcction 8pccuid for group A and group B. (See tables II and III, respectively) It 6hall
21、consist of Table i - Preproduction inspection Inqpction Rqt h3P (For additional preproduction inspection Par PEW see 4.3) -re ssio n 3.8 Temperature 3.9.1 . 44:; Moisture renstance 3.9.2 4.14 4.15 4.18 Elevat i on Grcunding 4.4 Acceptance Inspection covered by Subsidiary documents.- The followiag sh
22、all be inspected under the appicable 8ubaidiW documnts BB part of the =cepue lpspection before preparation for delivery: Item Finish Harking I- Licensed by Information Handling ServicesI MIL-R-55165 61 7799906 0093913 7 4,5 Acceptancc inspection of equipment before preparation for delivery.- Tho con
23、tractor, to demonstrate compliance with specified requirements, stmil perform the inopection spseified In 4.4 an6 4.5.1 through .4 5.2.2. This doe6 not relieve the contractor of hie responsii1it.y for performing any additional inspection which IS necessary to control the quality of %he product and t
24、o assure compliance with all speciilcation requirements . The Government -dl1 review and eVLilUate the Contractort 6 iD6peCtiOn procedures and uramne the contractors inspection records. In addition the Government-at its diecretion-l%y perform all. or any part of the specified i-pection, to verify th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILR551651962RECTIFIERBATTERYCHARGERPP255FTPP255FT 整流 电池充电器 PDF

链接地址:http://www.mydoc123.com/p-447801.html