ARMY MIL-P-60416 A (2)-1991 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf
《ARMY MIL-P-60416 A (2)-1991 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60416 A (2)-1991 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、UIL-P-604LbA (2) 13 9999906 0486034 7 MIL-P-60416A (AR) AMENDMENT 2 24 June 1991 SUPERSEDING AMENDMENT 1 30 March 1983 MILITARY SPECIFICATION PROPELLANT M1 FOR-USE IN CHARGE, PROPELLING, 155MM, M3A1 This Amendment forms a part of Military Specification MIL-P-60416A (AR) dated 23 March 1982 and is ap
2、proved for use by the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 Add the following drawing to para 2.1.2: I 1 2 9 1 4 O 1 9 - Collar and Rail Assembly, Dynagun Beta. 12914000 - Dynagun Charge Weight P
3、rocedure“ PAGE 3 * 3.2 Delete in its entirety and substitute the following new paragraph : l3.2 Ballistic assessment requirements. The propellant, . when fired in the M1 cannon with the M107 projectile or in the Dynagun system, shall be capable of assessment to the velocities and pressures at 70 deg
4、rees F as specified in Table I. Propellant shall be aged for 90 calendar days minimum after packout prior to Dynagun testing. Sample drums designated for assessment tests shall not be unsealed for used in the test until the 90 day time frame is met. In the event of war emergency, this requirement do
5、es not apply.“ AMSC N/A 1 of 4 FSC 1376 DISTRIBUTION STATEMENT A. Approved -for public release; distribution is unlimited. Licensed by Information Handling Servicesc MPL-P-bO41bA (2) 13 W 999990b 114dbI335 9 PPI - -s. IC d MIL-P-60416A (AR) AMENDMENT 2 31 3.3 Delete in its entirety and substitute th
6、e following new paragraph: “3.3 Bal list i c un i form i ty requirements . The pr ope1 lank, when fired in the M1 cannon with the M107 projectile or in the Dynagun system, shall comply with the following requirements when tested as specified in 4.5.1.2 or 4.5.2.2 respectively. All charges shall be m
7、anufactured in accordance with MIL-C-60418 except with the Dynagun firing. All charges fired in the Dynagun system shall be manufactured in accordance with the applicable Unit Operating Procedure.“ PAGE 9 4.5.2 Delete “Method 310.4“. * 4.5.2 Delete.in its entirety and substitute the following new pa
8、ragraphs: “4.5.2 Dynagun assessments. This alternative test method may be used for substitution of proving ground assessments (see 4.5.1). However, proving ground assessment or the acceptance of the propellant lot shall be used for every fifth lot accepted by the dynagun assessment. The dynagun asse
9、ssment shall be performed at the propellant production facility in accordance with the applicable facility unit operating procedure for the beta dynagun firing system and with Drawing 12914019 and 12914000. All charges shall be conditioned to the required temperature for a minimum of 24 hours and as
10、surance will be made that, when fired, the charges are at a conditioning temperature. The following tolerances shall apply to all temperature conditionings: -50 degrees F, + 5 degrees F; 70 degrees F, - t 2 degrees F, 145 degrees F, - 5 degrees F. The facility unit operation procedures shall be subm
11、itted to AMSMC-QAR-R(D) and AMSMC-QAH-T for review and approval. 4.5.2.1 Charge establishment (See Table II). Six charges each loaded with charge weights of propellant for zones 1, 2, 3, 4, 5 and 5t shall be conditioned and fired at 70 degrees F, with the test charges. From the data, charge weights
12、shall be calculated which will yield the prescribed service velocity (see 3.2). This calculated charge weight shall then be loaded into charges for the uniformity series (see 4.5.2.2). The difference between the corrected velocity obtained during the uniformity series and the service velocity shall
13、be compensated for by a final adjustment in charge weight using the slope of the velocity charge weight curve previously established. The result will be the recommended charge weight. 2 Licensed by Information Handling ServicesMIL-P-60416A (AR) AMENDMENT 2 4.5.2.2 Charge uniformity (see Table II). 4
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP60416A21991PROPELLANTM1FORUSEINCHARGEPROPELLING155MMM3A1M3A1 155 MM 点火 管用 M1 发射 火药 PDF

链接地址:http://www.mydoc123.com/p-446655.html