ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf
《ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、5- 37- 19 MIL- P - 4 8 2 5 o ( PA ) 15 March i974 (see 6.6) MILITARY SPECIFICATION PRIMER, STAB, r455 PARTS AND LOADING, ASSEMBLING, AND PACKING This specificatick is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the parts and t
2、he loading, assembling and packing for one type of initiating device de- signated as Primer, Stab, 1455. (This primer is used solely for testing flash detonators). 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bTds or request for proposal form a
3、 part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservation, Packaging, Method of MIL-A-2550 - Ammunition, General Specification For STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) PICL-STD-10
4、9 - Quality Assurance Terms and Definitions MIL-STD-650 - Explosives: Sampling, Inspection, and PIIL-STD-1168 - Lot Numbering of Ammunition Testing FSC: 1375 THIS DOCUMENT CONTA1NS.B-PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 (
5、PA) MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes DRAWINGS U. S. ARMY PICATINNY ARSENAL PRODUCT AND PACKAGING DRAWINGS 9218452 - Primer, Stab, PI55 9258182 - Box, Set-up, Packing, Ammunition, Inner for Small Explosive components. 9258183
6、- Box, Set-up, Packing, Ammunition, Outer, for Small Explosive Components 9258184 - Box, Packing, Ammunition, for Small Exp lo s ive Component s INSPECTION EQUIPPENT DRAWINGS 8816367 - Xolder, firing pin 8827828 - Sleeve 8827829 - Bushing 8827934 - Adapter, ball, steel 8855295 - Disc, lead, coined 9
7、200012 - Pin, firing 9201952 - Assembling, firing (Copies of specifications, standards and drawings, required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREYENTS 3.1 Parts.-The parts
8、 shall be in accordance with the applicable drawings and specifications. requirements specified on Drawing (dwg.) 9218452 and with all requirements specified in applicable specifications. 3.2 Assembly.-The primer assembly shall comply with all 3.3 Moisture conk ent 3.3.1 Primer Mixture.-At the time
9、of loading, the mois- ture content of the primer mixture used in loading the primers shall not exceed 0.30 percent. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-q250 13 = 7779706 0317737 5 MIL-P-48250 (PA) 3.3.2 Lead Azide.-At the time of
10、loading, the moisture content of the lead azide used in loading the primers shall not exceed 0.50 percent. 3.4 Functioning 3.4.1 Output.-The primer shall function, on the first attempt, under an applied energy of 11.85 inch ounces, and shall cause perforation of the coined lead disc to a diameter of
11、 1/4 inch minimum. 3.4.2 Waterproofness. -The primer shall be waterproof as evidenced by normal functioning, after being immersed in water maintained at 75 degrees Fahrenheit (OF) plus or minus 5OF, at a depth of 2 inches minimum for not less than 48 hours. 3.5 Workmanship.-All parts and assemblies
12、shall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Exterior surface coa
13、tings shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. All packing components shall be dry. 3.6 First Article Inspection.-This specification con- tains technical provisions for first article inspection. Re- quir
14、ements for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspecti
15、on requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- quirement s specified herein, unless disapproved by the Govern- ment. The Government reserves the right
16、 to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and ser- vices conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provi- sions of MIL-A-2550 shall apply. 3 Provid
17、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 13 m 979970b O317938 7 .I MIL-P-48250 (PA) 4.1.1 Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the co
18、ntractor shall supply the fol- lowing information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted. a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. D
19、rawing and specification number and date, together with identification and date of changes thereto. c. A statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual docu
20、ments, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall he signed by a responsible agent of the certifying organization. The initial c.srtificate submitted shall be substantiated by evidence of the.agen
21、ts authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission,-Prior to th
22、e start of regular production the contractor shall submit a first article sample (see 6.1) to a Government approved facility as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2, and 4.2.3. The first article sample shall consist of three hundred forty (3
23、40) loaded primers and 50 complete sets of parts (i.e., 50 each of every component) which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All
24、parts and materials, in- cluding packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the same to the degree necessary to assure that it conforms to the requirements of the contract and submit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP482501974PRIMERSTABM55PARTSANDLOADINGASSEMBLINGANDPACKINGM55 针刺 引物 部件 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446374.html