欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf

    • 资源ID:446374       资源大小:731.74KB        全文页数:18页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf

    1、5- 37- 19 MIL- P - 4 8 2 5 o ( PA ) 15 March i974 (see 6.6) MILITARY SPECIFICATION PRIMER, STAB, r455 PARTS AND LOADING, ASSEMBLING, AND PACKING This specificatick is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the parts and t

    2、he loading, assembling and packing for one type of initiating device de- signated as Primer, Stab, 1455. (This primer is used solely for testing flash detonators). 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bTds or request for proposal form a

    3、 part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservation, Packaging, Method of MIL-A-2550 - Ammunition, General Specification For STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) PICL-STD-10

    4、9 - Quality Assurance Terms and Definitions MIL-STD-650 - Explosives: Sampling, Inspection, and PIIL-STD-1168 - Lot Numbering of Ammunition Testing FSC: 1375 THIS DOCUMENT CONTA1NS.B-PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 (

    5、PA) MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes DRAWINGS U. S. ARMY PICATINNY ARSENAL PRODUCT AND PACKAGING DRAWINGS 9218452 - Primer, Stab, PI55 9258182 - Box, Set-up, Packing, Ammunition, Inner for Small Explosive components. 9258183

    6、- Box, Set-up, Packing, Ammunition, Outer, for Small Explosive Components 9258184 - Box, Packing, Ammunition, for Small Exp lo s ive Component s INSPECTION EQUIPPENT DRAWINGS 8816367 - Xolder, firing pin 8827828 - Sleeve 8827829 - Bushing 8827934 - Adapter, ball, steel 8855295 - Disc, lead, coined 9

    7、200012 - Pin, firing 9201952 - Assembling, firing (Copies of specifications, standards and drawings, required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREYENTS 3.1 Parts.-The parts

    8、 shall be in accordance with the applicable drawings and specifications. requirements specified on Drawing (dwg.) 9218452 and with all requirements specified in applicable specifications. 3.2 Assembly.-The primer assembly shall comply with all 3.3 Moisture conk ent 3.3.1 Primer Mixture.-At the time

    9、of loading, the mois- ture content of the primer mixture used in loading the primers shall not exceed 0.30 percent. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-q250 13 = 7779706 0317737 5 MIL-P-48250 (PA) 3.3.2 Lead Azide.-At the time of

    10、loading, the moisture content of the lead azide used in loading the primers shall not exceed 0.50 percent. 3.4 Functioning 3.4.1 Output.-The primer shall function, on the first attempt, under an applied energy of 11.85 inch ounces, and shall cause perforation of the coined lead disc to a diameter of

    11、 1/4 inch minimum. 3.4.2 Waterproofness. -The primer shall be waterproof as evidenced by normal functioning, after being immersed in water maintained at 75 degrees Fahrenheit (OF) plus or minus 5OF, at a depth of 2 inches minimum for not less than 48 hours. 3.5 Workmanship.-All parts and assemblies

    12、shall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Exterior surface coa

    13、tings shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. All packing components shall be dry. 3.6 First Article Inspection.-This specification con- tains technical provisions for first article inspection. Re- quir

    14、ements for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspecti

    15、on requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- quirement s specified herein, unless disapproved by the Govern- ment. The Government reserves the right

    16、 to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and ser- vices conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provi- sions of MIL-A-2550 shall apply. 3 Provid

    17、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 13 m 979970b O317938 7 .I MIL-P-48250 (PA) 4.1.1 Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the co

    18、ntractor shall supply the fol- lowing information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted. a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. D

    19、rawing and specification number and date, together with identification and date of changes thereto. c. A statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual docu

    20、ments, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall he signed by a responsible agent of the certifying organization. The initial c.srtificate submitted shall be substantiated by evidence of the.agen

    21、ts authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission,-Prior to th

    22、e start of regular production the contractor shall submit a first article sample (see 6.1) to a Government approved facility as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2, and 4.2.3. The first article sample shall consist of three hundred forty (3

    23、40) loaded primers and 50 complete sets of parts (i.e., 50 each of every component) which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All

    24、parts and materials, in- cluding packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the same to the degree necessary to assure that it conforms to the requirements of the contract and submit

    25、 a record of this inspection with the sample, 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 13 m 7779706 0317737 7 m MIL-P-48250 (PA) including a certificate of conformance for materials. A sample containing known defects will not be

    26、submitted unless specifically specifically authorized by the Contracting Officer. A first article sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manuf

    27、acturing process, material used, drawing or spec- ification such as to significantly affect product uniformity as determined by the Government. 4.2.2 Inspections to be performed.-Components will be subjected by the Government to any or all of the examinations and tests specified in this specificatio

    28、n and any or all requirements of the applicable drawings. 4.2.3 Rejection.-If any component fails to comply with the applicable requirements, the first article sample shall be reject- ed. In the event of rejection, the Government reserves the right to require the contractor to take correct2ve action

    29、 and submit a new first article sample or portion thereof. Until a first article sample is accepted, the contractor is, in no way, auth- orized by the Government to initiate regular production unless otherwise directed by the contracting officer. 4.2.4 Loaded Primers. - A sample of three hundred for

    30、ty (340) loaded primers shall be submitted in accordance wich 4.2.1 and tested as specified in 4.3.3.3. 4.3 Inspection provisions 4.3.1 Lot formation.-The term “inspection lot“ as used in this specification is defined as an essentially homogeneous col- lection of units for product from which a repre

    31、sentative sample is drawn and inspected to determine conformance with applicable requirements. The sample selected shall represent only that quantitiy of units from which the sample was drawn and shall not be construed to represent any prior to subsequent quantities pre- sented for inspection. Homog

    32、eneity shall be considered to exist provided the inspection lot has been produced by one manufacturer in one unchanged process using the same materials and methods in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions and complies with the

    33、 provisions for submission of product as specified in MIL-STD- 105. Changes to the process, specifications, or drawings not affecting safety, performance, interchangeability, or storage, as Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-98250

    34、 13 = 7777706 0317790 5 MIL-P-48250 (PA) determined by the Government, shall not be deemed to alter the homogeneity of an inspection lot. All material submitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein regardless of the type of

    35、sampling procedure which is being applied to determine conformance with requirements. Lot numbering, as required, shall be in accordance with MIL-STD-1168. Each inspection lot of loaded primer assemblies shall contain: a. Parts of one lot interfix number from one supplier. b. Primer mixture from one

    36、 batch or blending of batches, which results in homogeneity of all primer mixture used in the loading of a lot. c. Lead azide of the same type from not more than two lots produced by the same manufacturer in accordance with the same specification and same specification revision and which have subseq

    37、uently been subjected to uniformly controlled dry- ing and operating conditions at the loading plant. 4.3.2 Examination.-The examinations listed in khe follow- ing subparagraphs .shall be performed on inspection lots (see 4.3.1) of the components or assemblies designated in the appli- cable paragrap

    38、h headings. Inspection for critical defects (and major defects, when so specified) shall be 100 percent. Sampling plans for major and minor defects shall be in accordance With MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved by the Government.

    39、 In- stead of applying the AQLs designated herein to the groups of major. and minor defects listed, the contractor may elect to apply AQLs to individual defects using an AQL of 0.40 percent for each major defect and an AQL of 0.65 percent for each minor defect. When this method is elected, it shall

    40、be applied to all of the major and minor defects lirsted in the applicable subparagraphs of this section, except where JO0 percent inspection is specified, and be documented as part of the contractors inspection system. Equipment necessary for the performance of the inspections listed shall be in ac

    41、cordance with 4.3.4. 4.3.2.1 Disc (see dwg. 9218454 covering a detail of dwg. 9218452). ,. Cat e gories Defects Method of Code No, Inspe et ion Critical: None defined 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Major: AQL 0.40 percent 101. Diam

    42、eter,. . Gage o1001 102. Thickness Gage 01002 201. Evidence of poor workmanship (see 3.5) Visual 0100 3 4.3.2.2 Cup, prior to coating (see dwg. 9218453 covering Cat e gor ies Defects Method of Code No. a detail of dwg. 9218452). Major : AQL 0.65 percent 101. Outside diameter Gage 02001 102. Wall thi

    43、ckness Gage 02002 103. Length Gage 02003 104. Thickness through bottom Gage 02004 Minor : AQL 0.65 percent 201. Evidence of poor workmanship (see 3.5), . Visual 02005 4.3.2.3 Cup, after coatlng (see dwg. 9218452). I Categories Def e et s Method of Code No. 1. Coating missing or contains bare spot Vi

    44、sual 03001 Major: None defined Minor : AQL 0.65 percent 201. Evidence of poor workmanship (see 3.5) Visual 03002 4.3.2.4 Assembly (see dwg. 9218452). Cat e gories Defect s Method of Code No. Inspection Critical : 1. Cup cracked or split. Visual 04001 Provided by IHSNot for ResaleNo reproduction or n

    45、etworking permitted without license from IHS-,-,-MIL-P-LI250 13 W 7777706 03177Lt2 7 W MIL-P-48250 (PA) Maj or: 101. 102. 103. 104. 105. 106. 107. AQL 1.00 percent Length . Gage Disc punctured or torn . Visual Cup damaged Visual Disc seal missing or incomplete Visual Diameter, maximum (max.) . Gage

    46、Crimp not full 360 degrees . Visual End color identification missing or incorrect, Visual Minor: AQL 0.65 percent 201. Evidence of-poor workmanship (see 3.5) Visual 4.3.2.5 Box, Set-up, Inner, after loading and prior to closing slide cover (see dwg. 9258182). Categories De fe c Ls Method of Inspecti

    47、on Critical : -1. Filler and cushion assembly 2. Filler and cushion assembly missing Visual improperly assembled . Visual 3. Stiffener missing Visual 4. Slide cover assembled reversed . Visual Ma j or : AQL 0.40 percent 101. Release paper missing Visual Minor: AQL 1.00 percent 201. Marking missing,

    48、incomplete 202. Evidence of poor workmanship or illegible . Visual (see 3.5) Visual 4.3.2.6 Box, Set-up, Outer, with Inner Set-up boxes assembled and prior to assembling top and sealing strip (see dwg. 9258183). 04002 04003 04004 04005 04006 04007 04008 04009 Code No. 05001 05002 0500 3 .O5004 05005

    49、 05006 05007 Cat e gorie s Defects Method of Code No. Inspect ion Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48250 33 M 7777906 0337743 O M MIL- P - 4 8 2 5 O Critical : 1. Red surfaces on inner Set-up boxes do not alternate on same side of outer Set-up box . Visual direction. . Visual 2. Stiffner not facing one Major: None defined Minor: AQL 1.00 percent 201


    注意事项

    本文(ARMY MIL-P-48250-1974 PRIMER STAB M55 PARTS AND LOADING ASSEMBLING AND PACKING《M55针刺引物部件的填装 组装和包装》.pdf)为本站会员(Iclinic170)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开