ARMY MIL-G-48165-1973 GRENADE G P M43A1 AND BOMB BLU-18 CONTAINER ASSEMBLY FOR《GP M43A1型手榴弹和子弹 BLU-18集装箱装配》.pdf
《ARMY MIL-G-48165-1973 GRENADE G P M43A1 AND BOMB BLU-18 CONTAINER ASSEMBLY FOR《GP M43A1型手榴弹和子弹 BLU-18集装箱装配》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-48165-1973 GRENADE G P M43A1 AND BOMB BLU-18 CONTAINER ASSEMBLY FOR《GP M43A1型手榴弹和子弹 BLU-18集装箱装配》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、 flIL-G-LlLb5 13 W 7777706 03168b5 L I . 5-37-6 4 MIL-G-48165 (MU) 31 July 1973 . SUPERSEDING (See 6.6) MILITARY SPECIFICATION GRENADE, Gap.: M43A1 AND BOMB, BLU-18 CONTAINER ASSEMBLY FOR 1. SCOPE 1.1 This specification covers the c ntainer assembly for Grenade, G.P.: M43A1,and Bomb, BLU-18* 2. APPL
2、ICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition, General Specification For STANDARDS MILITARY MIL-STD-105 - Sa
3、mpling Procedures and Tables for Inspection by Attributes (ABC-STD-105) and Definitions MIL-STD-109 - Quality Assurance Terms t#iS bO however,a few light scratches not exposing base material may be permitted. All required marking and stamping shall be neat and sharply defined. njurious to any part,
4、nor shall theparts be contaminated Exterior surface coatings shall be con- 3 . 4 Submission of results of contractor-Qonucted e-xamna- tions and tests.-The contractor shall forward copies of the results of any of his examinations or tests to the designated address as required by the contract. (See 6
5、.5) 3.5 First article testing.-This specification makes pro- visions for first article testing. quantity by the contractor shall be as specified in the contract. Submission of first article 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility .fop inspectn.-Unless otherwise speci- Except as otherwise
6、specified in the contract fied in the contractor or purchase order, th.e supplier is respon-. sible for the performance of all inspection requirements as specified herein. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-48165 (MU) or order, the
7、 supplier may use his own or any other facilities suitable for the performance of the inspection requirements specffied herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed n
8、ecessary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provisions of MIL-A-2550 shall apply. lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall s
9、upply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: assurance provisions specified in this specification. with identification and date of changes thereto. meets requirements when such mater
10、ial is purchased by the contractor or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. 4.1.1 Submission of product.-At the time the completed a. A statement that the lot complies with all the quality
11、b. Drawing and specification number and date, together C. A statement that all material purchased by the contractor d. Number of items in the lot. e. Date submitted. f. Number of units of product inspected. g, Results obtained, ,by code number, for all inspections performed. The certificates shall b
12、e signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of th
13、e contract, this authority is vested in another agent of the certifying organization. 4.2 First article inspection. 4.2.1 Submission.-The contractor shall submit a first article quantity as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.2.2. (See 6.1.) Th
14、e first article sample shall consist of the following: a, Twenty-five (25) of each part. b. Twenty-five (25) container assemblies. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-48165 (MU) All parts and completed assemblies submitted shall hav
15、e been produced by the Contractor (or furnished by a supplier) using the same production processes, procedures and equipment as will be used in fulfilling the contract. All parts and material including packaging and packing, shall be obtained from the same sources of supply as will be used in regula
16、r production. sample shall be accompanied by certificates of conformance. A first article quantity, or portion thereof, as directed hy the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufactur
17、ing process (including heat treatmenk procedures and equipment, material used, drawing specification or source of supply as to significantly affect product uniformity as determined by the Government. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that
18、it conforms to the requirements of the contract and submit a record of this inspection with the sample. will not be submitted unless specifically authorized by the Contracting Officer. The A sample containing known defects 4.2.2 Inspection to be performed.-All parts and assemblies shall be subjected
19、 by the Government to any or all the examinations or tests specified in this specification and any or all require- ments of the applicable drawing. 4.2.3 Rejection.-If any part or assembly fails to comply The- Government reserves the right with any of the applicable requirements, the first article q
20、uantity shall be rejected. to terminate its inspection upon any failure of any part or assembly. In the event of rejection, the Government reserves the right to require the contractor to take corrective action and submit a new first article quantity or portion thereof. until a first article quantity
21、 is accepted, the contractor is in no way authorized by the Government .to resume regular production unless otherwise directed by the Contracting Officer. 4.3 Inspection p.r.ovisons .- 4.3.1 Lot formatLon.-The term “inspection lott1 as used in this specification is defined as an essentially homogene
22、ous callection of units of product from which a representative sample is drawn and inspected to determine conformance with. applicable requirements. only that quantity of units from which th.e sample was drawn and shall not be construed to represent any prior or subsequent quantities pagsented for i
23、nspection. Homogeneity shall be con- sidered to exis-t-provided the inspection lot has been produced by one manufacturer, in one unchanged process in accordance with the same drawing, same drawing revision, same specification and The- sample selected shall represent 5 k i i Provided by IHSNot for Re
24、saleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-48165 (MU) - 105. Diameter of hole Gage 01005 106. Concentricity of diameter of hole with outside diameter Gage O1006 Minor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG481651973GRENADEGPM43A1ANDBOMBBLU18CONTAINERASSEMBLYFORGPM43A1 手榴弹 子弹 BLU18 集装箱 装配 PDF