ARMY MIL-G-48062C-1982 GRENADE HE G P M46 LOADING AND ASSEMBLING.pdf
《ARMY MIL-G-48062C-1982 GRENADE HE G P M46 LOADING AND ASSEMBLING.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-48062C-1982 GRENADE HE G P M46 LOADING AND ASSEMBLING.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、4 3anuary 1982 SUPERSEDING MIL-G-48062B(AR) 5 .May 1981 MILITARY SPECIFICATION GRENAbE, HE, G.P., M46 LOADING AND ASSEMBLING This specificatim is approved for use by the US Army Armament Research and Development Command, and is available for use by all Departnients anG Agencies OE the Department of
2、Defense. 1. SCOPE 1.1 This siecification contains .requirements and provides quality assurance provisions for loading and assembling of one type of 5renac;e designateci as Grenilde, HE, G.P., M46. 2. . APPLICABLE DOCUMENTS 2.1 The follohing documents of the issue in effect on date of irivitation tor
3、 bids or request for proposal, form a part .of this speciiicaticri to the exterit specified herein. SPECIFICATIONS hlL-S-13612 -Steel Plate, brought, Homogen- eous for Ammunition Testing (L/4. to 12 Inches, Incl.) . hIL-E-14970 -Explosive Conposition A5 -Ammunition, Stanard Quality Assurance Provisi
4、ons 8. General Specification. For . . -Grenades; GP8 R42 and M46. Lead Cup Assembly For FSC 1330 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-STANDARDS MILITARY MIL-STD-105 -Sampling ProceClUres and Tables for Inspection by Attributes MIL-STD-410
5、-Nondestructive Testing Personnel MIL-STD-1235 -Single and Multi-Level Continuous Qualification and Certification Sampling Procedures and Tables For Inspection by Attributes DRAWINGS (See 6.6) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 9215370 -Grenade, HE, G.P.# M46 I NCPECTION EQUIPMENT DRA
6、WINGS 9224981 -Spin Launcher 9225356 -Control Circuits 9202784 -Cap Obturator i202788 -Operating Ins tr uctic;ns (Copies of specifications, standards, drawings, and publications require6 by suppliers in connection with specific procurement functions should be obtained from the procuring activity or
7、as directed by the contracting officer). Other publications.- The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of invitation for bids or request for proposal shall appli. 2.2 AMERICAN SOCIETY FOR TES
8、TING AND MATERIALS ASTM E 18 -Standard Test Methods for Rockwell Hardness and Rockwell Superficial Hardness of Metallic Materials (Application for copies should be addressed to: for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103 ) . American Society 3. REQUIREMENTS 3.1 Material.- Ma
9、terials shall be in accordance with the applicable drawings anil specifications . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 Grenades.-.The grenades shall comply with all requirements specifieci on Dwg. 521537U, all associated drawings and
10、 with all requirements specified in applicable specifications. 3.3 Static penetration tests of body loading assembly.- The steel block used for the static penetration tests shall be either (i) mild steel, type 1018 or 1020, having a Rockwell hardness of B74 minimuni, or (2) steel plate for ammunitio
11、n testing having niaterial and Brinell hardness in accordance with MIL-S-13812. The penetration requirements of 3.3.1 and 3.3.2 shall apply with the test block oriented such that (a) penetration is perpendicular to the direction of grain of the test block and (b) shaped-charge action inipinges upon
12、the rolled scrface which is parallel to the direction in which laminations would be formed during manufacture of the test block material. 3.3.1 Normal standoff.- When tested at normal standoff, the boy loading assembly, (Dwg. 9215372) shall penetrate a minimum of 3.00 inches of mild steel or a minim
13、um of 2.50 inches of ammunition testing plate. 3.3.2 Modified standoff .- When tested at a standoff distance, which is 4 1/4 + 1/16 inches greater than the normal standoff aistarice, the body loading assembly shall penetrate a minimum of . 5.50 inches of mild steel or a minimum of 4.50 inches of amm
14、unition tes ti ng pleite. 3.4 Armin9 test of fuze sliue of grenade.- The grenade fuze, less safety clip and safety pin, shall have the arming screw rotatecc, arid held out of the slide permitting the slide assembly to move to the armed position. The armed position shall be considered to have occurre
15、cc when the distarice from the end of the tunnel of the fuze housing to the crown of the beveled end of the slide assembly measures -410 t .O35 inch. 3.5 Grenade functioning.- The grenade shall not function prematurelk, and shall function high order as intended with evidence of complete shape charge
16、 action . 3.6 Grenade Storage - Grenade boies removed from the barrier b5 packaging and stored as metal parts or partially or full loaded (See 6.8). assemblies, shall not be subjected to a temperature below 50 ti F 5.7 First article inspection.- This specification contains technical provisions for f
17、irst article inspection. Requirements tor the submission of first article samples by the confractor shall be as specified in the contract. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.8 Records of results of contractor-conducted - examinations
18、 and tests.- The contractor shall maintain records of the results of all examinations or tests required by this specification. (See 6.4) 3.9 WorkmanshiE.- All parts and assemblies shall be fabricated, loaded and assembled in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, c
19、racks, dirt, grease, rust and other foreign matter. After loading, all external surfaces, including cavity, shall be free from caked explosive. The cleaning method used shall not be injurious to any parts, nor shall the parts be contaminated by the cleaning agents. Exterior surface coatings shall be
20、 continuous; however, a few light scratches not exposing base material may be permitted. All required marking and stamping shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions .- Unless otherwise specified here
21、in or in the contract, the provisions of MIL-A-48078 (PA) shall apply and are hereby mdt a part of this detail specification. inspection shall be conductea on this iteri,: 4.2 Classification of inspections.- The following types of a. First Article Inspection b. Quality Conformance inspection 4.3 Fir
22、st article inspection 4.3.1 Submission.- The contractor shall submit a first article as designated by the Contracting Officer for evaluation in accordarAce with the provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated . Part description
23、 Draw inqs Quant i ty Inert Grenades 9215370 Inert Grenades with live fuze 9215370 Body Fuze Assemblies 9215371 Body Loaing Assemblies 9215372 100 60 60 104 4.3.2 Inspections to be performed.- See MIL-A-48078(PA) and %able 1 herein. 4 b Provided by IHSNot for ResaleNo reproduction or networking perm
24、itted without license from IHS-,-,-2 B ti P P !2 t - 4N WWW . m m mo * W NY em * NN Nnl mm mm rl N NN N m Mm m II III II II I II I O0 O0 O0 O0 rl4 FIFI * *o o O mm rl O0 mm O0 Wm a 5 c N O rl 4 O rl Nu Pa ma, mu 4x Na, m- k h a, 3 5 Provided by IHSNot for ResaleNo reproduction or networking permitte
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG48062C1982GRENADEHEGPM46LOADINGANDASSEMBLINGPDF

链接地址:http://www.mydoc123.com/p-444945.html