ANSI UL 1478A-2013 UL Standard for Safety Pressure Relief Valves for Sprinkler Systems (First Edition Reprint with Revisions Through and Including August 4 2017)《喷洒灭火系统用泄压阀用安全性标准》.pdf
《ANSI UL 1478A-2013 UL Standard for Safety Pressure Relief Valves for Sprinkler Systems (First Edition Reprint with Revisions Through and Including August 4 2017)《喷洒灭火系统用泄压阀用安全性标准》.pdf》由会员分享,可在线阅读,更多相关《ANSI UL 1478A-2013 UL Standard for Safety Pressure Relief Valves for Sprinkler Systems (First Edition Reprint with Revisions Through and Including August 4 2017)《喷洒灭火系统用泄压阀用安全性标准》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 1478A Pressure Relief Valves for Sprinkler Systems STANDARD FOR SAFETYUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTED
2、 MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Pressure Relief Valves for Sprinkler Systems, UL 1478A First Edition, Dated May 20, 2013 Summary of Topics This revision of ANSI/UL 1478A is being issued to update the title page t
3、o reect reaffirmation of ANSI approval. Text that has been changed in any manner or impacted by ULs electronic publishing system is marked with a vertical line in the margin. The requirements are substantially in accordance with Proposal(s) on this subject dated June 16, 2017. All rights reserved. N
4、o part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, electronic, mechanical photocopying, recording, or otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied,
5、 including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be liable for any special, incidental, consequential, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use o
6、f or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility of such damage. In no event shall ULs liability for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic version
7、s of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liability, damage, claim, or judgment (including reasonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the pur
8、chasers computer system. The following table lists the future effective dates with the corresponding reference. Future Effective Dates References May 20, 2015 Entire Standard AUGUST 4, 2017 UL 1478A tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION
9、 FROM UL AUGUST 4, 2017 UL 1478A tr2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL MAY 20, 2013 (Title Page Reprinted: August 4, 2017) 1 UL 1478A Standard for Pressure Relief Valves for Sprinkler Systems Prior to the rs
10、t edition, the requirements for the products covered by this standard were included in the Outline of Investigation for Pressure Relief Valves for Sprinkler Systems, Subject 1478A. First Edition May 20, 2013 This ANSI/UL Standard for Safety consists of the First Edition including revisions through A
11、ugust 4, 2017. The most recent designation of ANSI/UL 1478A as a Reaffirmed American National Standard (ANS) occurred on August 4, 2017. ANSI approval for a standard does not include the Cover Page, Transmittal Pages, and Title Page. Comments or proposals for revisions on any part of the Standard ma
12、y be submitted to UL at any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System (CSDS) at https:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a Standard should be altered in any way. All of
13、 ULs Standards and all copyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT 2017 UNDERWRITERS LABORATORIES INC. ANSI/UL 1478A-2013 (R2017)UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERM
14、ISSION FROM UL AUGUST 4, 2017 PRESSURE RELIEF VALVES FOR SPRINKLER SYSTEMS - UL 1478A 2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope .4 2 Components 4 3 Units of Measurement .4 4 Glossary
15、.5 CONSTRUCTION 5 Sizes 5 6 Use and Set Pressure .5 7 Materials .6 PERFORMANCE 8 General 6 9 Elastomeric Parts (Except Gaskets) Test 6 10 Leakage Test 7 11 Hydrostatic Strength and Body Leakage Test .7 12 Relief Valve Operation, Flow Capacity and Reseat Tests .7 13 Spring Cycling Test 8 14 Contamina
16、ted-water Cycle Test 8 15 10-Day Moist Ammonia Air Stress Cracking Test 9 MANUFACTURING AND PRODUCTION TESTS 16 General .9 MARKING 17 General 10 INSTRUCTIONS 18 General 10 MAY 20, 2013 PRESSURE RELIEF VALVES FOR SPRINKLER SYSTEMS - UL 1478A 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODU
17、CTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INTRODUCTION 1 Scope Section 1 effective May 20, 2015 1.1 These requirements cover pressure relief valves intended for use in sprinkler systems for re protection service to relieve excessive pressures caused by thermal expansion, downstream of a press
18、ure reducing valve or in valve trim. 1.2 Requirements for installation of these valves are included in the Standard for the Installation of Sprinkler Systems, NFPA 13. 2 Components Section 2 effective May 20, 2015 2.1 Except as indicated in 2.2, a component of a product covered by this standard shal
19、l comply with the requirements for that component. 2.2 A component is not required to comply with a specic requirement that: a) Involves a feature or characteristic not required in the application of the component in the product covered by this standard; or b) Is superseded by a requirement in this
20、Standard. 2.3 A component shall be used in accordance with its recognized rating established for the intended conditions of use. 2.4 Specic components are recognized as being incomplete in construction features or restricted in performance capabilities. Such components are intended for use only unde
21、r limited conditions, such as certain temperatures not exceeding specied limits, and shall be used only under those specic conditions for which they have been recognized. 3 Units of Measurement Section 3 effective May 20, 2015 3.1 If a value for measurement is followed by a value in other units in p
22、arentheses, the rst stated value is the requirement. MAY 20, 2013 PRESSURE RELIEF VALVES FOR SPRINKLER SYSTEMS - UL 1478A 4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 4 Glossary Section 4 effective May 20, 2015 4.1 For the purpose of thi
23、s standard the following denitions apply. 4.2 OPENING PRESSURE The internal pressure at which the relief valve is intended to start to allow the ow of water. 4.3 RESEATING PRESSURE The internal pressure at which the relief valve is intended to prevent the ow of water. 4.4 SET PRESSURE The pressure v
24、alue marked on the valve which represents the pressure at which the valve is intended to relieve pressure from a water supply system. CONSTRUCTION 5 Sizes Section 5 effective May 20, 2015 5.1 The inlet shall have a nominal 1/2-inch size or larger male or female NPT pipe thread in accordance with the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIUL1478A2013ULSTANDARDFORSAFETYPRESSURERELIEFVALVESFORSPRINKLERSYSTEMSFIRSTEDITIONREPRINTWITHREVISIONSTHROUGHANDINCLUDINGAUGUST42017

链接地址:http://www.mydoc123.com/p-438896.html