ANSI ASTM F2158-2008 Standard Specification for Residential Central-Vacuum Tube and Fittings《住宅中央真空管和配件用规范》.pdf
《ANSI ASTM F2158-2008 Standard Specification for Residential Central-Vacuum Tube and Fittings《住宅中央真空管和配件用规范》.pdf》由会员分享,可在线阅读,更多相关《ANSI ASTM F2158-2008 Standard Specification for Residential Central-Vacuum Tube and Fittings《住宅中央真空管和配件用规范》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2158 08 (Reapproved 2016) An American National StandardStandard Specification forResidential Central-Vacuum Tube and Fittings1This standard is issued under the fixed designation F2158; the number immediately following the designation indicates the year oforiginal adoption or, in the ca
2、se of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers the establishment of require-ments and test methods for material
3、s, dimensions andtolerances, flattening resistance and impact resistance of plastictubing for use in central-vacuum systems for residentialbuildings.1.2 All notes and footnotes shall be considered as nonman-datory requirements of the specification.1.3 This specification does not apply to: inlet valv
4、e mount-ing plates of fittings directly connected to these plates, reducerfittings, mufflers exhaust vents, or flex tubing attached at thepower unit location.1.4 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI uni
5、ts that are provided for information onlyand are not considered standard.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine
6、the applica-bility of regulatory requirements prior to use.2. Referenced Documents2.1 ASTM Standards:2D618 Practice for Conditioning Plastics for TestingD1600 Terminology forAbbreviated Terms Relating to Plas-ticsD1784 Specification for Rigid Poly(Vinyl Chloride) (PVC)Compounds and Chlorinated Poly(
7、Vinyl Chloride)(CPVC) CompoundsD2122 Test Method for Determining Dimensions of Ther-moplastic Pipe and FittingsD2444 Test Method for Determination of the Impact Resis-tance of Thermoplastic Pipe and Fittings by Means of aTup (Falling Weight)D2564 Specification for Solvent Cements for Poly(VinylChlor
8、ide) (PVC) Plastic Piping SystemsD2749 Symbols for Dimensions of Plastic Pipe FittingsD5033 Guide for Development ofASTM Standards Relatingto Recycling and Use of Recycled Plastics (Withdrawn2007)3F402 Practice for Safe Handling of Solvent Cements,Primers, and Cleaners Used for Joining Thermoplastic
9、Pipe and FittingsF412 Terminology Relating to Plastic Piping Systems3. Terminology3.1 Definitions are in accordance with Terminology F412,abbreviations are in accordance with Terminology D1600, anddimension symbols are in accordance with SpecificationD2749.3.2 Definitions of Terms Specific to This S
10、tandard:3.2.1 central-vacuum tubing, npiping used for central-vacuum systems, that is O.D. controlled.3.2.2 unaided eye, nobservable without enhancement be-yond correction for normal vision.4. Significance and Use4.1 The requirements of this specification are intended toprovide tube and fittings for
11、 central-vacuum cleaning systems,used to convey debris from the vacuum inlets to the central-vacuum power units.5. Materials5.1 Basic MaterialsThe tube and fittings shall be made ofvirgin plastic having a cell classification of equivalent to orgreater than that for poly (vinyl chloride) (PVC) 12454,
12、 13354,and 12223, as defined in Specification D1784. Compounds thathave different cell classifications, because one or more prop-erties are superior to those of the specified compounds, are alsoacceptable.1This specification is under the jurisdiction of ASTM Committee F11 onVacuum Cleaners and is th
13、e direct responsibility of Subcommittee F11.50 on SpecialVacuum Cleaner Types.Current edition approved Oct. 1, 2016. Published October 2016. Originallyapproved in 2001. Last previous edition approved in 2013 as F2158 08 (2013).DOI: 10.1520/F2158-08R16.2For referenced ASTM standards, visit the ASTM w
14、ebsite, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenced onwww.astm.org.Copyright ASTM Internatio
15、nal, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15.2 Recycled MaterialThe use of recycled materials asdefined in Guide D5033 is acceptable as long as the materialmeets the cell classification requirements in 5.1.5.3 Solvent CementWhere solvent cement is used t
16、o joinPVC tube and fittings, it shall meet the requirements ofSpecification D2564.6. Requirements6.1 GeneralThe tube and fittings shall be homogeneousthroughout and free of visible cracks, holes, foreign inclusions,or other defects. They shall be as uniform as commerciallypracticable in color, opaci
17、ty, density, and other physical prop-erties.6.1.1 Tube and Fitting FlatteningThere shall be no evi-dence of splitting, cracking, or breaking when the tube andfittings are tested in accordance with 7.4.6.1.2 Tube and Fitting Impact StrengthThe impactstrength of the tube and fittings at the time of ma
18、nufacture shallnot be less than 20 ftlbf (27 J), when tested in accordance with7.5.6.2 Dimensions and Tolerances:6.2.1 Tube DimensionsThe tube dimensions shall meetthe requirements given in Table 1, when measured in accor-dance with Test Method D2122.6.2.1.1 Tube LengthThe tolerance on the tube leng
19、th shallbe 612 in. (612.5 mm).6.2.2 Fitting and Tube Hub DimensionsThe dimensionsof fittings and tube hubs shall meet the requirements of Table2 and Fig. 1, when measured in accordance with Test MethodD2122.6.2.3 Belled TubeFor belled tube fabricated from tubesections, the thickness of the belled se
20、ction shall be consideredsatisfactory if the bell was formed from tube meeting therequirements of Table 1.7. Test Methods7.1 SamplingThe selection of tube samples shall be asagreed upon between the purchaser and seller. In case of noprior agreement, samples selected by a testing laboratory shallbe d
21、eemed adequate.7.2 Tube Test SpecimensFor testing in accordance with7.4 and 7.5, cut each test specimen from the selected tube to aminimum of 6 618 in. (152 6 3.175 mm) in length. Deburr theedges of each specimen on the inner and outer diameter.7.3 ConditioningFor time-of-manufacture testing, condi-
22、tioning shall be permitted at the ambient temperature andhumidity of the manufacturers facility. For referee purposes,conditioning shall be in accordance with Procedure A ofPractice D618.7.4 Tube and Fitting FlatteningFlatten three test speci-mens between parallel plates in a press until the distanc
23、ebetween the plates is 40 % of the outside diameter of the tubeor fitting. The rate of loading shall be uniform and such that theflattening is completed within 2 to 5 min. On the removal of theload, the specimen shall pass if no splitting, cracking, orbreaking is observed under normal light with the
24、 unaided eye.7.5 Impact ResistanceDetermine the impact resistance ofthe tube or fitting in accordance with Appendix X3.5, “Proce-dureSpecification Requirement,” of D2444. Use either a 6-lb(2.7-kg) or a 20-lb (9.1-kg) B tup and the flat plate (holder B).Test six specimens at an impact of 20 ftlbf (27
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASTMF21582008STANDARDSPECIFICATIONFORRESIDENTIALCENTRALVACUUMTUBEANDFITTINGS 住宅 中央 真空管 配件 规范 PDF

链接地址:http://www.mydoc123.com/p-433044.html