ANSI API SPEC 5DP-2009 Specification for Drill Pipe (FIRST EDITION Effective August 1 2010).pdf
《ANSI API SPEC 5DP-2009 Specification for Drill Pipe (FIRST EDITION Effective August 1 2010).pdf》由会员分享,可在线阅读,更多相关《ANSI API SPEC 5DP-2009 Specification for Drill Pipe (FIRST EDITION Effective August 1 2010).pdf(124页珍藏版)》请在麦多课文档分享上搜索。
1、Specification for Drill PipeANSI/API SPECIFICATION 5DPFIRST EDITION, AUGUST 2009EFFECTIVE DATE: AUGUST 1, 2010CONTAINS API MONOGRAM ANNEX AS PART OF U.S. NATIONAL ADOPTIONREAFFIRMED, APRIL 2015ISO 11961:2008 (Identical), Petroleum and natural gas industriesSteel drill pipeSpecial NotesAPI publicatio
2、ns necessarily address problems of a general nature. With respect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, eithe
3、r express or implied, with respect to the accuracy, completeness, or usefulness of theinformation contained herein, or assume any liability or responsibility for any use, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, su
4、bcontractors,consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.Users of this recommended practice should not rely exclusively on the information contained in this document.Sound business, scientific, engineering, and safety judgment
5、 should be used in employing the information containedherein. API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, orguarant
6、ee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are published to facilitate the broad av
7、ailability of proven, sound engineering and operatingpractices. These publications are not intended to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized. The formulation and publication of API publicationsis not intended in any way
8、 to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard. API does not represent,warrant, or guarantee tha
9、t such products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from t
10、he publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 2009 American Petroleum InstituteAPI ForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for themanufacture, sale, o
11、r use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in the publication be construed as insuring anyone against liability for infringement of letters patent.Shall: As used in a standard, “shall” denotes a minimum requirement in order to conform to th
12、e specification.Should: As used in a standard, “should” denotes a recommendation or that which is advised but not required in orderto conform to the specification. This document was produced under API standardization procedures that ensure appropriate notification andparticipation in the development
13、al process and is designated as an API standard. Questions concerning theinterpretation of the content of this publication or comments and questions concerning the procedures under whichthis publication was developed should be directed in writing to the Director of Standards, American PetroleumInsti
14、tute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to reproduce or translate all or anypart of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-t
15、imeextension of up to two years may be added to this review cycle. Status of the publication can be ascertained from theAPI Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is publishedannually by API, 1220 L Street, N.W., Washington, D.C. 20005.Suggested r
16、evisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW,Washington, D.C. 20005, standardsapi.org.iiiii Contents Page API Foreword ii Foreword . v Introduction vi 1 Scope 1 2 Conformance 1 2.1 Dual citing of normative references 1 2.2 Units of measurement . 2
17、3 Normative references 2 4 Terms, definitions, symbols and abbreviated terms . 4 4.1 Terms and definitions . 4 4.2 Symbols and abbreviated terms 8 5 Information to be supplied when placing orders for drill-pipe . 10 6 Requirements for drill-pipe . 11 6.1 General . 11 6.2 Dimensions, masses and conne
18、ctions . 11 6.3 Material requirements . 12 6.4 Process of manufacture for drill-pipe 13 6.5 Traceability . 14 6.6 Inspection and testing General . 15 6.7 Testing of welds. 16 6.8 Tensile test . 16 6.9 Hardness test . 17 6.10 Charpy V-notch impact test 18 6.11 Transverse side-bend test 18 6.12 Imperf
19、ections and defects in drill-pipe . 19 6.13 Visual inspection of the drill-pipe weld zone 19 6.14 Non-destructive examination of the weld zone 20 6.15 Marking of drill-pipe 21 6.16 Minimum facility requirements for drill-pipe manufacturers 23 6.17 Documentation requirements of drill-pipe 23 7 Requir
20、ements for drill-pipe body . 24 7.1 Information to be supplied when placing orders for drill-pipe bodies 24 7.2 Dimensional and mass requirements 24 7.3 Material requirements . 26 7.4 Process of manufacture 27 7.5 Traceability . 28 7.6 Inspection and testing General . 28 7.7 Testing of chemical comp
21、osition . 28 7.8 Tensile tests . 29 7.9 Charpy V-notch impact tests 30 7.10 Drill-pipe-body wall thickness 31 7.11 Drill-pipe-body length . 31 7.12 Internal upset . 31 7.13 Internal profile 32 7.14 Straightness . 32 7.15 Upset alignment . 32 7.16 Mass determination . 32 7.17 Imperfections and defect
22、s of drill-pipe body 32 7.18 Visual inspection of drill-pipe body . 33 iv 7.19 Non-destructive examination 34 7.20 Marking 37 7.21 Minimum facility requirements for drill-pipe-body manufacturer 38 7.22 Documentation requirements 38 8 Requirements for tool joints 39 8.1 Information to be supplied whe
23、n placing orders for tool joints 39 8.2 Dimensional requirements . 40 8.3 Material requirements. 40 8.4 Process of manufacture . 41 8.5 Traceability 42 8.6 Inspection and testing General . 42 8.7 Testing of chemical composition 42 8.8 Tensile tests 43 8.9 Hardness tests 44 8.10 Charpy V-notch impact
24、 tests . 44 8.11 Imperfections and defects . 45 8.12 Non-destructive examination 46 8.13 Marking 47 8.14 Minimum facility requirements for tool-joint manufacturers . 47 8.15 Documentation requirements for tool joints 48 Annex A (normative) Tables in SI units . 49 Annex B (normative) Figures in SI (U
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIAPISPEC5DP2009SPECIFICATIONFORDRILLPIPEFIRSTEDITIONEFFECTIVEAUGUST12010PDF

链接地址:http://www.mydoc123.com/p-431049.html