1、 Guide for Survey and Inspection of Jacking Systems GUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS NOVEMBER 2016 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Ho
2、uston, TX 77060 USA ii ABSGUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS .2016 Foreword Foreword This Guide has been prepared by ABS to provide Owners guidelines to establish minimum requirements for inspection of Rack and Pinion jacking gear at Special Periodical Survey of Hull for Self-Elevati
3、ng Drilling Units. This Guide provides more details regarding the examination of open and closed type jacking systems of a Self-Elevating Drilling Units. The maintenance crew will benefit from understanding the general and design specific survey requirements for a Rack and Pinion jacking gear. This
4、will enable better planning, execution and consistent application of the scope of surveys and inspection during Special Surveys for jacking systems. This Guide becomes effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to
5、verify that this version of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to 0Hrsdeagle.org. Table of Contents GUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS CONTENTS SECTION 1 Purpose . 1 SECTION 2 Definitions . 2 1 Closed
6、Systems 2 3 Open Systems 2 5 Jacking Gear Function Test 2 SECTION 3 General Survey Requirements 3 SECTION 4 Scope of Surveys . 4 SECTION 5 Design Specific Survey Requirements . 5 1 Open Type Systems . 5 3 Closed Type Systems . 5 ABSGUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS .2016 iii This Pa
7、ge Intentionally Left Blank Section 1: Purpose SECTION 1 Purpose The purpose of these Guide is to establish minimum requirements for inspection of Rack and Pinion jacking gear at Special Periodical Survey of Hull for Self-Elevating Drilling Units for consistent application of the below noted Rule re
8、quirement. 7-2-5/13.15 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units (MODU Rules) is the current requirement for inspection of jacking gear, see excerpt below: 13.15 Self-Elevating Drilling Units Leg Jacking Systems (2011) On self-elevating type drilling units, leg jackin
9、g systems are to be examined and reported on. Pinions and gears of the climbing pinion gear train of rack and pinion systems are to be examined as far as practicable, to the Surveyors satisfaction, by an effective crack detection method. At Special Periodical Survey No. 2 and subsequent Special Peri
10、odical Surveys, the leg jacking system is to be examined in the presence of the Surveyor by the original equipment manufacturer or other third party inspector mutually agreeable to the owner and the Surveyor. The above Rule gives a requirement for in-depth inspection commencing at Special Periodical
11、 Survey No.2, which is at 10 years from delivery of the Unit, by the Original Equipment Manufacturer or a third party inspector agreeable to both ABS and the Owner; however, the extent of the inspection is not clearly defined as there are multiple manufacturers and designs of Jacking Systems and the
12、 inspection requirements for each vary. The following designs of Jacking Systems are predominantly used on Self-Elevating Drilling Units and are considered in these instructions: Open Type Systems Closed Type Systems ABSGUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS .2016 1 Section 2: Definition
13、s SECTION 2 Definitions 1 Closed Systems Closed jacking systems are systems where a visual examination of the gears in place by removal of inspection covers cannot be carried out, as not all Closed Designs are fitted with inspection covers. These types of systems, without inspection covers, have to
14、be removed from the unit and disassembled in a shop to carry out visual examination of the gear units. Most commonly they are planetary drive type units. 3 Open Systems Open Jacking systems are systems that are fitted with removable inspection covers that enable in-place visual examination of the ge
15、ars. 5 Jacking Gear Function Test A jacking Gear Function test refers to operational testing of the jacking gear while jacking under normal load. In the function test, distance to be jacked is one complete revolution of the climbing pinion. 2 ABSGUIDE FOR SURVEY AND INSPECTION OF JACKING SYSTEMS .20
16、16 Section 3: General Survey Requirements SECTION 3 General Survey Requirements The following requirements are to be applied to all units and jacking system designs: i) Record Keeping. Number of hours and loading while jacking should be kept for review and used as a reference for the required examin
17、ations. These records should include hours jacking under preload, normal loading, pulling stuck legs and jacking in heavy weather. Verification of these records should be performed at each Annual Classification Survey. ii) Lube Oil Analysis. Lube oil from the gear boxes of systems that are designed
18、as “closed systems” (i.e., planetary drive type) should be retrieved, and analyzed twice each year, as a minimum. When excessive metal content or other conditions that would indicate failure of the gearbox are found the gearbox is to be opened and examined prior to completion of the Special Survey.
19、iii) Climbing pinions should be closely examined at each Special Survey, tooth profile checked and non-destructively tested as considered necessary. iv) Rack teeth profiles are to be examined, compared to the tolerances set by the Units designer. Any out of tolerance must be corrected. Areas of the
20、Rack to be examined should be determined from operational records but should include the areas of the leg most highly loaded during jacking operations while going on location. v) Shock pads, were fitted, are to be examined, dimensions confirmed to be in accordance with the OEM specifications and fou
21、nd or placed in satisfactory condition. vi) Leg guide wear plates are to be examined and found or placed in satisfactory condition. a) Liners are to be confirmed in place b) Liners are to be examined for cracking or missing retaining welds c) Liner wear is to be within the OEMs tolerances Note: Lowe
22、r liners are to be examined while the Unit is elevated. vii) The jacking systems including all auxiliary equipment are to be inspected for damage, wear, or corrosion. This is to include items such as the gearbox and motors, foundations, mounting arrangements, bolting, and connection couplings. Other
23、 ancillary equipment such as operating and control, piping and wiring installations along with their supporting structure should also be included. viii) During any inspection lock-out, tag-out or similar isolation of the jacking system is to be carried out. This included pressure systems, electrical
24、 systems, and structural components. ix) Provision of Safe Access. Due to increased likelihood of survey work being carried out at height or over water, reference is made to the entire text of 1-1-5/7 of the ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1) and ABS Su
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2402016GUIDEFORSURVEYANDINSPECTIONOFJACKINGSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-400834.html