ABS 157 NOTICE 1-2007 GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION《新建船体调查指南》.pdf
《ABS 157 NOTICE 1-2007 GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION《新建船体调查指南》.pdf》由会员分享,可在线阅读,更多相关《ABS 157 NOTICE 1-2007 GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION《新建船体调查指南》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 1 GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION AUGUST 2007 NOTICE NO. 1 August 2010 The following changes become EFFECTIVE AS OF 1 JULY 2010. (See http:/www.eagle.org for the consolidated version of the Guide for Hull Survey for New Construction, 20
2、07, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification (Part 1).)
3、Foreword (Add new second paragraph, as follows.) (1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234, UI LL76, and UI MPC96, regarding initial statutory surveys at new construction. Updates to IACS UR Z23 are also incorporated. 2 Definitions 2.3 Sur
4、vey Methods (Revise Subparagraphs 2.3.1 and 2.3.2, as follows.) 2.3.1 Patrol (1 July 2010) Patrol is the act of checking on an independent and unscheduled basis that the applicable processes, activities and associated documentation of the shipbuilding functions identified in Table 1 continue to conf
5、orm to classification and statutory requirements. 2.3.2 Review (1 July 2010) Review is the act of examining documents in order to determine traceability and identification and to confirm that processes continue to conform to classification and statutory requirements. 3 Applications (Revise Paragraph
6、 3.2, as follows.) 3.2 Statutory Items (1 July 2010) This Guide covers all statutory items relevant to the hull structure and coating (i.e., Load Line and SOLAS Safety Construction). Notice No. 1 August 2010 2 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 (Revise Paragraph 3.5, as follows.) 3.
7、5 Locations of Construction (1 July 2010) This Guide applies to the hull structures constructed and coatings applied at any of the following: i) Shipbuilders facilities ii) Subcontractors at the shipbuilders facilities iii) Subcontractors at their own facilities or at other remote locations (Revise
8、Subsection 4, as follows.) 4 Qualification and Monitoring of Personnel (1 July 2010) The Surveyors are to confirm through patrol, review and witness as defined in 2.3, that the vessels are built using approved plans in accordance with the relevant Rules and statutory requirements. The Surveyors are
9、to be qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activities are monitored. (See Section 1-1-6 of the ABS Rules for Building and Classing Steel Vessels.) 5 Survey of the Hull Structure (Revise first line of Paragraph 5.1, as follows.) 5.1 Items
10、to be Surveyed (1 July 2010) Table 1 provides a list of surveyable items for the hull structure and coating covered by this Guide, including: (Following text remains unchanged.) 6 Review of the Construction Facility (Revise first paragraph and Item i) of Subsection 6, as follows.) (1 July 2010) ABS
11、is to familiarize itself with the yards production facilities, management processes, and safety procedures for consideration in complying with the requirements of Table 1 prior to any steelwork or construction taking place in the following circumstances: i) Where ABS has no recent experience at the
12、construction facilities (typically after a one year lapse) or when significant new infrastructure has been added (Following text remains unchanged.) 7 Newbuilding Survey Planning (Revise Paragraph 7.1, as follows.) 7.1 Kick-off Meeting (1 July 2010) Prior to commencement of surveys for any newbuildi
13、ng project, ABS is to discuss with the shipbuilder at a kick-off meeting the items listed in Table 1. The purpose of the meeting is to agree how the list of specific activities shown in Table 1 is to be addressed. The meeting is to take into account the shipbuilders construction facilities and vesse
14、l type including the list of proposed subcontractors. A record of the meeting is to be made, based upon the contents of the Table (the Table can be used as the record with comments made into the appropriate column). Notice No. 1 August 2010 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 3 If AB
15、S has nominated a Surveyor for a specific newbuilding project, then the Surveyor is to attend the kick-off meeting. The builder is to be asked to agree to undertake ad hoc investigations during construction where areas of concern arise and to keep ABS advised of the progress of any investigation. Wh
16、enever an investigation is undertaken, the builder is to be requested, in principle, to agree to suspend relevant construction activities if warranted by the severity of the problem. (Revise Paragraph 7.3, as follows.) 7.3 Update of Meeting Record (1 July 2010) The shipyard shall be requested to adv
17、ise of any changes to the activities agreed to at the kick off meeting and these are to be documented. (e.g., if the shipbuilder chooses to use or change subcontractors, or to incorporate any modifications necessitated by changes in production or inspection methods, Rules and regulations, structural
18、 modifications, or in the event where increased inspection requirements are deemed necessary as a result of a substantial non-conformance or otherwise). (Revise Paragraph 7.6, as follows.) 7.6 Series Ship Production (1 July 2010) In the event of series ship production consideration may be given to w
19、aiving the requirement for a kickoff meeting for the second and subsequent ships provided any changes are documented as required in 7.1. (Revise Subsection 8, as follows.) 8 Examination and Test Plan for Newbuilding Activities (1 July 2010) The shipbuilder is to provide plans of the items which are
20、intended to be examined and tested. These plans need not be submitted for approval and examination at the time of the kick-off meeting. They are to include: i) Proposals for the examination of completed steelwork (generally referred to as the block plan) and are to include details of joining blocks
21、together at the pre-erection and erection stages or at other relevant stages ii) Proposals for fit up examinations where necessary iii) Proposals for testing of the structure (leak and hydrostatic) as well as for all watertight and weathertight closing appliances iv) Proposals for nondestructive exa
22、mination v) Any other proposals specific to the vessel type or to the statutory requirements. The plans and any modifications to them are to be submitted to the Surveyors in sufficient time to allow review before the relevant survey activity commences. TABLE 1 (1 July 2010) (Revise Item 7 of Table 1
23、, as follows.) Reference Shipbuilding Function Survey Requirements for Classification Survey Method Required for Classification ABS Rules/Guide(1)IACS Reference(2, 3) Statutory Requirements and Relevant Reference Documentation Available to Classification Surveyor during Construction Documentation fo
24、r Ship Construction File Specific Activities ABS Proposals for the Project .1 Verify that applied coatings are approved and review records of application 7 (1 July 2010) Corrosion Protection Systems (e.g., coatings, cathodic protection, impressed current) except for coating system subject to PSPC Sa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS157NOTICE12007GUIDEFORHULLSURVEYFORNEWCONSTRUCTION 新建 船体 调查 指南 PDF

链接地址:http://www.mydoc123.com/p-400633.html