ASTM C1103M-2019 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric).pdf
《ASTM C1103M-2019 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric).pdf》由会员分享,可在线阅读,更多相关《ASTM C1103M-2019 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1103M 14C1103M 19Standard Practice forJoint Acceptance Testing of Installed Precast Concrete PipeSewer Lines (Metric)1This standard is issued under the fixed designation C1103M; the number immediately following the designation indicates the year oforiginal adoption or, in the case of r
2、evision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for testing the joints of installed precast concrete pipe sewer l
3、ines, when using either airor water under low pressure to demonstrate the integrity of the joint and the construction procedures. This practice is used fortesting 675-mm and larger diameter precast concrete sewer lines utilizing rubber gasket sealed joints.NOTE 1The user of this practice is advised
4、that methods described herein may also be used as a preliminary test to enable the manufacturer or installerto demonstrate the condition of sewer pipe prior to delivery.1.2 This practice is the SI companion of Practice C1103.NOTE 2The owner shall specify the following: who will conduct, observe, and
5、 furnish labor, material, and measuring devices and pay for the tests;who is responsible for determining local ground conditions; and whether an air or water test is to be used.NOTE 3The user of this practice is advised that test criteria presented in this practice are similar to those in general us
6、e. Pipe shall be accepted byinfiltration or exfiltration testing utilizing Practice C969M.NOTE 4Test times tabulated and the rate of air loss in this standard are based on successful testing of installed pipelines. However, since air and waterhave different physical properties, retests of some pipel
7、ines not meeting field air tests have been successful when tested with water.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety safety, health, and healthenvir
8、onmental practices and determine theapplicability of regulatory limitations prior to use. Specific safety precautions are given in Section 6.1.4 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Princip
9、les for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Technical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and Related ProductsC969M Practice for Infiltration a
10、nd Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)3. Terminology3.1 DefinitionsFor definitions of terms relating to concrete pipe, see Terminology C822.4. Summary of Practice4.1 The joint in the sewer line to be tested is covered on the inside of the pipe by a
11、 ring with two end element sealing tubes.Air or water, at low pressure, is introduced through a connection on the ring into the annular space between the ring and joint. Theamount of air, or water, loss is used to determine the acceptability of the installed sewer line.5. Significance and Use5.1 Thi
12、s is not a routine test. The values recorded are applicable only to the sewer being tested and at the time of testing.6. Safety Precautions6.1 The use of compressed air is dangerous if a sewer line is not prepared properly and proper procedures are not followed.6.2 It is imperative that all pressure
13、s be relieved completely before the test apparatus is loosened for removal.1 This practice is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved Nov. 15, 2014Jan. 1, 2019. Published Novembe
14、r 2014January 2019. Originally approved in 1989. Last previous edition approved in 20092014as C1103 03C1103 14.(2009). DOI: 10.1520/C1103M-14.10.1520/C1103M-19.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of
15、ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically
16、 possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C70
17、0, West Conshohocken, PA 19428-2959. United States16.3 Pressurizing lines for the two end element sealing tubes shall be separate from the lines for pressurizing the void volumecreated by the joint test apparatus. The pressures required to seal the end element tubes shall be as specified by the appa
18、ratusmanufacturer, and are greater than the pressure required to test the joint. The line for pressurizing the void volume shall includea 42 kPa pressure relief device to reduce hazards and avoid overpressurization.7. Preparation of the Sewer Joint7.1 Check the size of access openings to ensure that
19、 the test apparatus will fit in the sewer line.7.2 Clean the joint and interior joint surfaces to eliminate debris prior to wetting and testing.NOTE 5The user of this practice is advised that a wetted interior surface is desirable and will produce more consistent results. Air may pass throughthe wal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1103M2019STANDARDPRACTICEFORJOINTACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINESMETRICPDF

链接地址:http://www.mydoc123.com/p-1243449.html