1、10-06M 31 20 00 - 1 SECTION 31 20 00 EARTH MOVING SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Modify, add or delete items in Article, DESCRIPTION OF WORK as necessary to corres
2、pond with detailed paragraphs in Part 3. Add items if required to describe unusual conditions. Provide subparagraph item under the main headings that relate to the specific work activities to be performed for the specific site. PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. This section specifies the
3、requirements for furnishing all equipment, materials, labor, tools, and techniques for earthwork including, but not limited to, the following: 1. Site preparation. 2. Excavation. 3. Underpinning. 4. Filling and backfilling. 5. Grading. 6. Soil Disposal. 7. Clean Up. 1.2 DEFINITIONS: A. Unsuitable Ma
4、terials: 1. Fills: Topsoil; frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic material, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable and any material w
5、ith a liquid limit and plasticity index exceeding 40 and 15 respectively. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction, as defined by ASTM / D 698 / D 1557 / / AASHTO / T 99 / T 180. 2. Existing Subgrade (Excep
6、t Footing Subgrade): Same materials as 1.2.A.1, that are not capable of direct support of slabs, pavement, and similar items with possible exception of improvement by compaction, proofrolling, or similar methods. 3. Existing Subgrade (Footings Only): Same as paragraph 1, but no fill or backfill. If
7、materials differ from / reference borings and / Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 20 00 - 2 design requirements, excavate to acceptable strata subject to Resident Engineers approval. B. Building Earthwork: Earthwork operations
8、 required in area enclosed by a line located 1500 mm (5 feet) outside of principal building perimeter. It also includes earthwork required for auxiliary structures and buildings. C. Trench Earthwork: Trenchwork required for utility lines. D. Site Earthwork: Earthwork operations required in area outs
9、ide of a line located 1500 mm (5 feet) outside of principal building perimeter and within new construction area with exceptions noted above. E. Degree of compaction: Degree of compaction is expressed as a percentage of maximum density obtained by laboratory test procedure. This percentage of maximum
10、 density is obtained through use of data provided from results of field test procedures presented in ASTM D1556, ASTM D2167, and ASTM D2922. F. Fill: Satisfactory soil materials used to raise existing grades. In the Construction Documents, the term “fill” means fill or backfill as appropriate. G. Ba
11、ckfill: Soil materials or controlled low strength material used to fill an excavation. H. Unauthorized excavation: Removal of materials beyond indicated sub-grade elevations or indicated lines and dimensions without written authorization by the Resident Engineer. No payment will be made for unauthor
12、ized excavation or remedial work required to correct unauthorized excavation. I. Authorized additional excavation: Removal of additional material authorized by the Resident Engineer based on the determination by the Governments soils testing agency that unsuitable bearing materials are encountered a
13、t required sub-grade elevations. Removal of unsuitable material and its replacement as directed will be paid on basis of Conditions of the Contract relative to changes in work. J. Subgrade: The undisturbed earth or the compacted soil layer immediately below granular sub-base, drainage fill, or topso
14、il materials. K. Structure: Buildings, foundations, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface. L. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. M. Drainage course:
15、Layer supporting slab-on-grade used to minimize capillary flow of pore water. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 20 00 - 3 N. Bedding course: Layer placed over the excavated sub-grade in a trench before laying pipe. Bedding cou
16、rse shall extend up to the springline of the pipe. O. Sub-base Course: Layer placed between the sub-grade and base course for asphalt paving or layer placed between the sub-grade and a concrete pavement or walk. P. Utilities include on-site underground pipes, conduits, ducts, and cables as well as u
17、nderground services within buildings. Q. Debris: Debris includes all materials located within the designated work area not covered in the other definitions and shall include but not be limited to items like vehicles, equipment, appliances, building materials or remains thereof, tires, any solid or l
18、iquid chemicals or products stored or found in containers or spilled on the ground. R. Contaminated soils: Soil that contains contaminates as defined and determined by the Resident Engineer or the Governments testing agency. 1.3 RELATED WORK: A. Materials testing and inspection during construction:
19、Section 01 45 29, TESTING LABORATORY SERVICES. B. Safety requirements / and blasting operations /: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION. C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01 00 00, GENERAL RE
20、QUIREMENTS. D. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL DATA. /E. Erosion Control: Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, and Section 32 90 00, PLANTING. / /F. Site preparation: Section 31 23 19, DEWATERING, and Section 02 41 00, DEMOLITION. /
21、/G. Foundation system requirements: Section 31 62 00, DRIVEN PILES, Section 31 63 16, AUGER CAST GROUT PILES, Section 31 63 26, DRILLED CAISSONS, Section 31 23 23.33, FLOWABLE FILL. / /H. Paving sub-grade requirements: Section 32 12 16, ASPHALT PAVING./ 1.4 CLASSIFICATION OF EXCAVATION: A. Unclassif
22、ied Excavation: Removal and disposal of pavements and other man-made obstructions visible on surface; utilities, and other items including underground structures indicated to be demolished and removed; together with any type of materials regardless of character of material and obstructions encounter
23、ed. SPEC WRITER NOTE: Retain either Unclassified Excavation above or Classified Excavation below. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 20 00 - 4 B. Classified Excavation: Removal and disposal of all material except that material
24、not defined as Rock. C. Rock Excavation: SPEC WRITER NOTE: The requirements for track mounted power excavators may vary. Discuss with soils consultant and modify as necessary. 1. Trenches and Pits: Removal and disposal of solid, homogenous, interlocking crystalline material with firmly cemented, lam
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3120002006EARTHMOVINGPDF