《SSPC PA GUIDE 4-1982 Guide to Maintenance Repainting with Oil Base or Alkyd Painting Systems《使用油基或醇酸树脂涂料系统进行维护和重新涂装的指南 编辑修订 2004年11月1日》.pdf》由会员分享,可在线阅读,更多相关《SSPC PA GUIDE 4-1982 Guide to Maintenance Repainting with Oil Base or Alkyd Painting Systems《使用油基或醇酸树脂涂料系统进行维护和重新涂装的指南 编辑修订 2004年11月1日》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、7-50SSPC-PA Guide 4November 1, 1982Editorial Revisions November 1, 2004SSPC: The Society for Protective CoatingsPAINT APPLICATION GUIDE NO. 4Guide to Maintenance Repainting with Oil Base or Alkyd Painting Systems4. Surface Condition and Preparation4.1 SURFACE CONDITION: The surface condition of the
2、previously painted steel substrate should be classied and re-painted in accordance with the applicable section of Table 1.It is recognized that in any maintenance painting project, the structure or equipment to be repainted may have areas where the condition of the old paint work varies. In these ca
3、ses each particular section of the area to be repainted should then be recoated in accordance with the applicable section of Table 1.4.2 SURFACE PREPARATION: The SSPC SurfacePrepa-ration Specications should be followed as in Table 1, or with the mutual agreement of both owner and contractor, another
4、 set of surface preparation criteria may be established.5. Paints5.1 PAINT SYSTEMS: The wash primer (if any), primer, intermediate, and nish coat should be the same as those specied in the original paint system. Alternatively, a paint having the same generic type of vehicle as in the original painti
5、ng may be used. Some other compatible paint system may be used if mutually agreed upon between the owner and contractor.5.2 COMPATIBILITYSPOT TEST: If the composition of the original paint system is unknown, a spot test should be made to determine the compatibility of the new system with the old, an
6、d should include: assuring the adhesion of the present system to the substrate; applying proposed painting system; and observing for adhesion, lifting, bleeding, or other evidence of incompatibility.6. Paint Application6.1 PAINT APPLICATION: Painting should be performed in accordance with Table 1 an
7、d the requirements of SSPC-PA 1, “Shop, Field, and Maintenance Painting of Steel.“6.2 TOUCH-UP PAINTING: After cleaning the previously painted steel surfaces, those areas with bare steel exposed should be spot primed in accordance with the “Field Painting“ Section of SSPC-PA 1.1. Scope1.1 This Guide
8、 covers the steps necessary for the repainting of steel structures previously painted with oil base, alkyd, or other conventional oleoresinous paint systems with the same generic paint system as the existing one.1.2 When special paint systems such as zinc-rich, epoxy, or urethane are involved, spot
9、tests may be necessary and the instructions of the manufacturer should be followed.1.3 The amount of maintenance cleaning and painting is determined by the need for corrosion protection and appearance and should be described in the procurement documents.2. Description2.1 This Guide outlines the comp
10、onents of a complete maintenance repainting system. A standard system consists of surface preparation and repainting according to the guidelines presented in Table 1.3. Referenced Standards3.1 SSPC AND JOINT STANDARDS :PA 1 Shop, Field, and Maintenance Painting of SteelPA 2 Measurement of Dry Coatin
11、g Thick-ness with Magnetic GagesPA Guide 3 A Guide to Safety in Paint Applica-tionSP 1 Solvent CleaningSP 2 Hand Tool CleaningSP 6/NACE No. 3 Commercial Blast CleaningVIS 2 Standard Method of Evaluating Degree of Rusting on Painted Steel Surfaces3.2 AMERICAN SOCIETY FOR TESTING AND MATERI-ALS (ASTM)
12、 STANDARDS:D 610 Evaluating Degree of Rusting on Painted Steel SurfacesD 3359 Measuring Adhesion by Tape Test7-51SSPC-PA Guide 4November 1, 1982Editorial Revisions November 1, 2004TABLE 1MAINTENANCE PAINTING OF OIL BASE OR ALKYD PAINTING SYSTEMSRUST GRADES*EXAMPLE OF AREA %(Generally Dispersed Rust)
13、CLEANING AND PAINTING RECOMMENDEDSolvent clean (SSPC-SP 1) entire repaint area, and spot prime, if necessary. If required to maintain lm thickness or continuity, spot apply nish coat, then apply 1.5-2.0 mils (36-51 micrometers) of nish coat over entire repaint area.10-88-66-4 Spot clean (minimum SSP
14、C-SP 2, hand cleaning) entire repaint area, feather edges and spot prime. If required to maintain lm thickness or continuity, spot appIy nish coat, then apply 1.5-2.0 mils (38-51 micrometers) of nsh coat over entire repaint area.SEVERELY DETERIORATED(10 to 50% rust)Large portion of surface is covere
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCPAGUIDE41982GUIDETOMAINTENANCEREPAINTINGWITHOILBASEORALKYDPAINTINGSYSTEMS 使用 醇酸树脂 涂料 系统 进行 维护 重新

链接地址:http://www.mydoc123.com/p-1054457.html