REG NASA-LLIS-1373--2002 Lessons Learned Construction Safety.pdf
《REG NASA-LLIS-1373--2002 Lessons Learned Construction Safety.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1373--2002 Lessons Learned Construction Safety.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1373Lesson Info:a71 Lesson Number: 1373a71 Lesson Date: 2002-01-28a71 Submitting Organization: DFRCa71 Submitted by: Roy TryonSubject: Construction Safety Abstract: Unavailable.Description of Driving Event: DFRC had a dozen large diameter (20“+/-) fire water sectional valves l
2、ocated in large vaults around the flight line. The requirement was to backfill these vaults with earthen materials, and remove the top of the vaults, and pave flush around them for minimal impact to the flight line area. The problems of doing this with “dirt“ included working down in deep confined s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13732002LESSONSLEARNEDCONSTRUCTIONSAFETYPDF

链接地址:http://www.mydoc123.com/p-1019012.html