《REG NASA-LLIS-1087--2001 Lessons Learned - Plan Timely Implementation of Backups In Case Breakthrough Technologies Fail to Meet Readiness Gates - 1998.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1087--2001 Lessons Learned - Plan Timely Implementation of Backups In Case Breakthrough Technologies Fail to Meet Readiness Gates - 1998.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1087Lesson Info:a71 Lesson Number: 1087a71 Lesson Date: 2001-12-06a71 Submitting Organization: JPLa71 Submitted by: D. LehmanSubject: Plan Timely Implementation of Backups In Case Breakthrough Technologies Fail to Meet Readiness Gates - 1998 Abstract: Although the Deep Space 1
2、 mission exceeded its overall technology demonstration objectives, certain important technologies under development never achieved flight readiness.Develop a project implementation plan with preplanned alternatives that addresses technology readiness and risk mitigation. Cease development when techn
3、ology readiness gates for critical technologies are not met and implement preplanned alternatives. Avoid a spacecraft architecture where one new technology relies on another in order to demonstrate them in-flight.Description of Driving Event: The Deep Space 1 (DS1) mission included breakthrough tech
4、nologies that were critical to mission success and had not been proven in space flight. Although DS1 exceeded its overall technology demonstration objectives, certain important technologies under development never achieved flight readiness. Specifically, the Three Dimensional Stack (3DS) flight comp
5、uter was deferred to a subsequent mission, and the Remote Agent Flight Software was downgraded to an in-flight experiment.A set of technology readiness “gates“ had been established for evaluating the flight readiness of the breakthrough technologies. However, these gates were poorly defined, and the
6、 Integrated Product Development Teams and the Program Office did not fully commit to them. Further, the development schedules for these advanced technologies were too short. Plans were in place for backups for some of these technologies (but not all) should their development prove unsuccessful.Certa
7、in technologies were coupled such that problems with one could hinder the successful Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-development of another. In-flight demonstration of the autonomous onboard optical navigation system (AutoNav) was req
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10872001LESSONSLEARNEDPLANTIMELYIMPLEMENTATIONOFBACKUPSINCASEBREAKTHROUGHTECHNOLOGIESFAILTOMEETREADINESSGATES1998PDF

链接地址:http://www.mydoc123.com/p-1018726.html