1、Lessons Learned Entry: 0937Lesson Info:a71 Lesson Number: 0937a71 Lesson Date: 2001-01-01a71 Submitting Organization: KSCa71 Submitted by: Malcolm GlennSubject: Mobile Crane Mishap Description of Driving Event: A three-man crane operating crew was assisting a three-man crane overhaul crew to refurbi
2、sh a 140-ton crew and to refurbish a 110-ton government owned mobile crane on September 15, 2000. On this day, the overhaul crew was to install new boom pendants, requiring the cable bridle and its associated cables to be moved from its temporary stowage location behind the cab of the crane to a poi
3、nt on the boom where it could be attached to the boom pendants. To move the bridle with its associated cables forward along the length of the boom, a second 65-ton government owned mobile crane was used to lift the cable bridle assembly and pull it to the new location. The cable bridle (weighing app
4、roximately 1100 pounds) was attached to the hook of the 65-ton crane with a web sling (rated for 10,000 pound capacity in the vertical choker configuration) used in a horizontal choker configuration.The crane operating personnel were performing the following duties: One member operated the 65-ton cr
5、ane used to lift the cable bridle assembly and pull it to its new location. A second member operated the 140-ton crane in order to play out cable while the bridle assembly was being pulled. The third member was on the ground acting as the signalman for the two crane operators. With the three crane o
6、perating crew members in position and the overhaul crew members observing the operations, the cable bridle was lifted and slowly pulled along the boom of the 140-ton crane. During this movement the cable bridle underwent several yawing motions due to the cables binding on the sheaves as the cable un
7、spooled from the take-up drums. The sheaves were binding because the cables were being pulled at an angle and the choker hitch configuration did not keep the bridle straight and level with the direction of pull.The web sling failed allowing the bridle to fall. The bridle assembly impacted the butt s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09372001LESSONSLEARNEDMOBILECRANEMISHAPPDF

链接地址:http://www.mydoc123.com/p-1018582.html