1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 26 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 26 00 (August 2010)UFGS-09 26 00 (April 2006) UFGS-09215 (September 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVIS
2、ION 09 - FINISHESSECTION 09 26 00VENEER PLASTER05/11PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.3 SUBMITTALS1.4 SUSTAINABLE DESIGN CERTIFICATION1.5 DELIVERY AND STORAGE1.6 SCHEDULING1.7 ENVIRONMENTAL REQUIREMENTS1.8 FIRE RESISTIVE CONSTRUCTIONPART 2 PRODUCTS2.1 MATERIALS2.1.1 Steel Framing
3、, Furring, and Related Items2.1.2 Vapor Retarder2.1.3 Gypsum Backing Board2.1.4 Gypsum Base2.1.5 Gypsum Veneer Plaster2.1.6 Joint Reinforcement2.1.7 Joint Compound2.1.8 Screws2.1.9 Nails2.1.10 Corner Bead, Casing Bead, and Control JointsPART 3 EXECUTION3.1 STEEL FRAMING3.1.1 Partition Framing System
4、3.1.2 Special Framing3.1.3 Shaftwall Framing System3.1.4 Ceiling Openings3.1.5 Wall Openings3.1.6 BlockingSECTION 09 26 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 APPLICATION OF GYPSUM BASE3.2.1 Curved Surfaces3.2.2 Cavity Shaftwall
5、 System3.2.3 Control Joints3.2.4 Vapor Retarder3.3 JOINT REINFORCEMENT3.3.1 Mesh Reinforcing3.3.2 Paper Tape Reinforcing3.4 APPLICATION OF GYPSUM VENEER PLASTER3.4.1 Mixing3.4.2 Application3.4.2.1 Base Coat3.4.2.2 Finish Coat3.5 CLEANUP AND PATCHING- End of Section Table of Contents -SECTION 09 26 0
6、0 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 26 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 26 00 (August 2010)UFGS-09 26 00 (April 2006) UFGS-09215 (September 2003)UNIFIED FACILITIES
7、 GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 09 26 00VENEER PLASTER05/11*NOTE: This guide specification covers the requirements for veneer plaster systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this gu
8、ide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required
9、 in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Veneer plaster consists of a 2 to 3 mm 1/16 to 1/8 inch thick plaster coating applied i
10、n one or more coats to a special gypsum lath base over metal or wood framing. Veneer plaster provides a hard, dense finish for areas such as corridors and conference rooms of major facilities where walls are subjected to frequent impact and where appearance is important. It should not be used in sho
11、wer rooms or excessively humid areas.*NOTE: On the drawings, indicate location and extent of each type of veneer plaster and control joints.*SECTION 09 26 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 REFERENCES*NOTE: Thi
12、s paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add
13、a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification
14、 when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 1002 (2007) Standard Specifi
15、cation for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel StudsASTM C 1047 (2010a) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer BaseASTM C 1396/C 1396M (2009a) Standard Specification for G
16、ypsum BoardASTM C 475/C 475M (2002; R 2007) Joint Compound and Joint Tape for Finishing Gypsum BoardASTM C 514 (2004; R 2009e1) Standard Specification for Nails for the Application of Gypsum BoardASTM C 587 (2004; R 2009) Gypsum Veneer PlasterASTM C 631 (2009) Bonding Compounds for Interior Gypsum P
17、lasteringASTM C 645 (2009a) Nonstructural Steel Framing MembersASTM C 754 (2009a) Installation of Steel Framing SECTION 09 26 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Members to Receive Screw-Attached Gypsum Panel ProductsASTM C 843 (
18、1999; R 2006) Application of Gypsum Veneer PlasterASTM C 844 (2004; R 2010) Application of Gypsum Base to Receive Gypsum Veneer PlasterASTM C 954 (2010) Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to 0.112 in. (2.84 m
19、m) in ThicknessASTM D 3678 (1997; R 2008e1) Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Interior-Profile ExtrusionsFM GLOBAL (FM)FM APP GUIDE (updated on-line) Approval Guide http:/ ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsSCIENTIFIC CERTIFICATI
20、ON SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageUNDERWRITERS LABORATORIES (UL)UL Fire Resistance (2011) Fire Resistance Directory1.2 GENERAL REQUIREMENTS*NOTE: Select either the one or two-coat system. The one-coat is slightly lower in cost, requires less installation time,
21、 and requires only one plastering material on the job. The two-coat system has greater crack resistance and is more resistant to damage. The one-coat system should be used where appearance is the sole consideration. The two-coat system should be used where physical abuse is a consideration.*Except w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0926002011VENEERPLASTER 石膏 PDF