NAVY UFGS-07 57 13-2011 SPRAYED POLYURETHANE FOAM (SPF) ROOFING《喷射的聚氨酯泡沫(SPF)屋面》.pdf
《NAVY UFGS-07 57 13-2011 SPRAYED POLYURETHANE FOAM (SPF) ROOFING《喷射的聚氨酯泡沫(SPF)屋面》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-07 57 13-2011 SPRAYED POLYURETHANE FOAM (SPF) ROOFING《喷射的聚氨酯泡沫(SPF)屋面》.pdf(39页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-07 57 13 (May 2011)-Preparing Activity: NAVFAC Superseding UFGS-07 57 13 (August 2010)UFGS-07 57 13 (August 2009) UFGS-07 57 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVI
2、SION 07 - THERMAL AND MOISTURE PROTECTIONSECTION 07 57 13SPRAYED POLYURETHANE FOAM (SPF) ROOFING05/11PART 1 GENERAL1.1 REFERENCES1.2 DESCRIPTION OF ROOF SYSTEM1.2.1 Design Requirements1.2.1.1 Fire and Wind Uplift1.2.2 Performance Requirements1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Qualification of
3、Manufacturer1.4.1.1 Manufacturers Technical Representative1.4.2 Qualification of Applicator1.4.3 Preroofing Conference1.4.4 Foam Roof System Mock-Up1.4.5 Sample Warranty1.4.6 Sustainable Design Certification1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery1.5.2 Storage1.5.3 Handling1.6 ENVIRONMENTAL
4、 CONDITIONS1.6.1 Primer1.6.2 Sprayed Polyurethane Foam1.6.3 Elastomeric Coating1.7 COORDINATION1.7.1 Flashing1.8 WORK SEQUENCE1.9 CONTRACTORS FOAM SPRAY EQUIPMENT1.9.1 Applicator1.9.2 Equipment Calibration1.9.3 Metering Equipment Requirements1.9.4 Moisture Protection1.9.5 Compressed Air1.9.6 Dispens
5、e Excess MaterialsSECTION 07 57 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.10 SPECIAL SAFETY PROVISIONS1.10.1 Special Equipment1.10.1.1 Air Masks1.10.1.2 Eye and Face Masks1.10.1.3 Clothing and Gloves1.10.2 Handling Precautions1.10.2.
6、1 Venting of Material Containers1.11 WARRANTY1.11.1 Roof System Manufacturer Warranty1.11.2 Roofing System Installer Warranty1.11.3 Continuance of Warranty1.12 CONFORMANCE AND COMPATIBILITYPART 2 PRODUCTS2.1 SPRAY URETHANE FOAM2.2 PROTECTIVE COATING2.2.1 Type A Coating2.2.2 Type B Coating2.2.3 Type
7、CB Coating2.2.4 Type CF Coating2.2.5 Coating Color2.3 PRIMER2.4 CERAMIC GRANULES2.5 SEALANTS2.6 WALKPADS2.7 TRAFFIC AREA FABRIC2.8 INSPECTION TOOLSPART 3 EXECUTION3.1 PROTECTION OF PROPERTY3.1.1 Masking3.1.2 Warning Signs3.2 SPECIAL PRECAUTIONS AND INSTRUCTIONS3.2.1 Safe Working Load Limits3.2.2 Pri
8、mers3.2.3 Material Handling3.2.4 Shoes3.2.5 Fire and Explosion Hazards3.3 ROOF AREA PREPARATION3.3.1 Preapplication Inspection3.3.1.1 Surface Examination3.3.2 Close Intake Vents3.4 GENERAL APPLICATION3.5 SURFACE PREPARATION FOR FOAM APPLICATION3.5.1 Ferrous Metal3.5.2 Concrete Decks3.5.3 Wood Decks
9、and Other Wood Surfaces3.5.4 Existing Roof Covering Surfaces3.6 SPRAY FOAM APPLICATION3.6.1 Spray Foam3.6.2 Terminations3.6.3 Surface Uniformity3.6.4 Finish Appearance and Texture3.6.5 Foam Finish Correction3.6.6 Finish Removal3.6.7 Application Time Limits3.6.8 Curing TimeSECTION 07 57 13 Page 2Prov
10、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6.9 Spray Foam Clean Up3.7 SURFACE PREPARATION FOR PROTECTIVE COATING APPLICATION3.7.1 Metal Concrete and Masonry Surfaces3.7.2 Primer3.7.3 Sealant3.8 PROTECTIVE COATING APPLICATION3.8.1 Base Coat Applica
11、tion3.8.2 Intermediate Coat Application3.8.3 Finish Coat Application3.8.4 Minimum Dry Film Thickness (DFT)3.8.5 Granule Surfacing3.8.6 Penetrations3.8.7 Walkways3.8.8 Coating Application Clean-Up3.9 FIELD QUALITY CONTROL3.9.1 Construction Monitoring3.9.2 Coating Wet Film Thickness Monitoring3.9.3 Sl
12、it samples3.9.4 Core samples3.9.5 Manufacturers Field Inspection3.9.6 Visual Inspection and Moisture Scanning3.10 CORRECTION OF DEFICIENCIES3.11 CLEAN-UP AND DISPOSAL3.12 INFORMATION CARD- End of Section Table of Contents -SECTION 07 57 13 Page 3Provided by IHSNot for ResaleNo reproduction or networ
13、king permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-07 57 13 (May 2011)-Preparing Activity: NAVFAC Superseding UFGS-07 57 13 (August 2010)UFGS-07 57 13 (August 2009) UFGS-07 57 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL da
14、ted April 2011*SECTION 07 57 13SPRAYED POLYURETHANE FOAM (SPF) ROOFING05/11*NOTE: This guide specification covers the requirements for spray applied urethane foam roofing systems with a fluid applied elastomeric protection coating.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS)
15、 Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove info
16、rmation and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR)*NOTE: Roof must be sloped to drain, with minimum slope af
17、ter deflection of 20 mm per meter 1/4 inch per foot. Roof slope will be obtained by sloping the structural deck and not by varying the thickness of the sprayed insulation. The roofing system will not be applied when deck is of lightweight concrete or when other than light foot traffic is anticipated
18、 on the roof. Broomed finish should be specified for concrete decks.The designer will determine the minimum required R-value and calculate the insulation thickness based on the aged R-value of 5.6. Insulation thickness shall be specified or indicated on drawings but not be less than 38 mm 1-1/2 inch
19、es and will be shown on SECTION 07 57 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the drawings.This section shall be coordinated with other system components specifications such as decking and sheet metal flashing. This section shall als
20、o be coordinated with the criteria of UFC 3-110-03, “Roofing“ as it relates to the specific project and Service Exceptions indicated therein.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred
21、 to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use
22、the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0757132011SPRAYEDPOLYURETHANEFOAMSPFROOFING 喷射 聚氨酯 泡沫 SPF 屋面 PDF

链接地址:http://www.mydoc123.com/p-984728.html