NAVY MIL-T-23132 A-1972 TUNGSTEN DELAY COMPOSITION《钨迟滞合成物》.pdf
《NAVY MIL-T-23132 A-1972 TUNGSTEN DELAY COMPOSITION《钨迟滞合成物》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-23132 A-1972 TUNGSTEN DELAY COMPOSITION《钨迟滞合成物》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-23132A 13 7777706 0303068 7 MIL-T-23132A (AS) 16 June 1972 SUPERSEDING MIL-T-23132 (Wep) 21 December 1961 MILITARY SPECIFICATION TUNGSTEN DELAY COMPOSITION This specification has been approved by the Naval Air Systems Command, Department of the Navy. 1, SCOPE 1.1 Scope. This specification cove
2、rs the minimum requirements for the procurement of tungsten delay composition. (See 6.1.) 1.2 Classification. The tungsten delay composition furnished under Burning time will be specified by the procuring activity. this specification shall be of five series, depending on the burning time range. (See
3、 6.2.) Series I 0.15 to 1.0 sec/in. at 25“ centigrade (C) Series II 1.0 to 5.0 sec/in. at 25“ C Series III 5.0 to 28.0 sec/in. at 25 C Series IV 28.0 to 33.0 sec/in. at 25“ C Series V 33.0 to 38.0 sec/in. at 25“ C . 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date o
4、f invita- tion for bids or request for proposal, form a part of this specification to the extent specified herein. SPEC I FICAT IONS Federal RR-S-366 Sieves; Standard, Testing. PPP-B-621 Box; Wood, Cleated- Plywood PPP- B-62 1 Box; Wood, Nailed and Lock Corner ;HIS DOCUMENT CONTAINS i PAGE; Provided
5、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-T-23132A 13 W 7799706 0303069 O MIL-T-23132A (AS) Mi li tam MIL-P-116 Preservation, Methods of MI L-P-2 17 Potassium Perchlorate MI L-B-550 Barium Chromate MIL-D-20550 Diatomaceous Earth MIL-P-22264 Powder
6、s, Ignition, Gas ess Naval Ordnance Sys tems Command (Code Ident 1000 1) OS 9765 Boron-Potassium Nitrate Naval Air Systems Command Code Ident 30003) AS 2686 Tungsten Metal Powder, Pyrotechnic STANDARDS Mi li tary MI L-STD- 129 MIL-STD-1234 Pyrotechnics : Sampling, Inspection an Marking for Shipment
7、and Storage DRAW I NG S Naval Ordnance Systems Command (Code Ident 10001) 2 249 36 2 2249363 Delay Body Test Element Loading Assembly 2249365 LD 518765 Test Element Output Charge Holder Loading Assemb ly PUBLICATIONS Naval Ordnance Systems Command (Code Ident 10001) OD 12051 Operating Instructions f
8、or Pyrotechni Timing Apparatus 7 Testing Jelay c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ - MIL-T-23132A 13 9997906 0303070 7 MIL-T-23132A (AS) (Copies of specifications, standards, drawings, and publications required by suppliers in connect
9、ion with specific procurement functions should be obtained from the contracting officer.) 2.2 Other publications. specification to the extent the issue in effect on date shall apply. procuring activity or directed by the The following documents form a part of this specified herein. Unless otherwise
10、indicated , of invitation for bids or request for proposal Code of Federal Regulations 49 CFR 170-190 Hazardous Materials Regulations, Department of Transportat i on (Copies are available from the Superintendent of Documents , Govern- ment Printing Office, Washington, D. C. Orders should cite “the l
11、atest issue and supplements thereto.“) 3, REQUIREMENTS 3.1 Description. The tungsten delay compositions shall be homogeneous mixtures of tungsten powder, barium chromate, potassium perchlorate, and diatomaceous earth. corresponding burning time ranges in accordance with 1.2. Compositions shall be de
12、signated in series with 3.2 Materials. delay composition shall conform to the requirements of 3.2.1, 3.2.2, 3.2.3, and 3.2.4. The materials used in the manufacture of the tungsten 3.2.1 Tungsten powder. The tungsten powder shall conform to the requirements of AS 2686, type II. are considered the mos
13、t useful for the given burning time series. With proper adjustment of composition tungsten percentage, any particle size close to the suggested range may be used to achieve the desired burning time These tungsten particle size ranges 3 Provided by IHSNot for ResaleNo reproduction or networking permi
14、tted without license from IHS-,-,-NIL-T-23132A 13 m 777770b 0303073 7 m MI L-T-23132A (AS) Series AS 2686, class Average particle size, microns I 1 0.5 to (0.9 II 2 0.9 to (2.5 I II 3 2.5 to (5.0 4 5.0 to (10.0 IV V 4 + 1,2 5.0 to (10.0 or blend of coarse (5.0 - 10.0) and small amount of fine (0.5 -
15、 2.5) (10% - 25%) 3.2.2 Barium chromate. The barium chromate shall conform to MIL- B-550, class A, with the exceptions that the minimum purity shall be 97.5 percent, and 95.0 percent or more of the material shall pass through a U. S. No. 325 screen. The average particle size of the barium chromate s
16、hall be 5 microns or less as determined by 4.3.4. 3.2.3 Potassium perchlorate. The potassium perchlorate shall conform to MIL-P-217, grade A. lations of potassium perchlorate are suggested for optimum performance: In addition, the following percentages and granu- Series I II IIIA IIIB IIIC IV V Burn
17、ing time range, sec/in. 0.15 to 1.0 1.0 to 5.0 5.0 to 10.0 10.0 to 20.0 20.0 to 28.0 28.0 to 33.0 33.0 to 38.0 Percent KC104 5 5 5 5 10 10 10 KClO4 gr an u 1 at i on F* F* F* C* e* C* e* *3.0 to 8.0 micron FSSS *-1OOt200 mesh USS sieve 3.2.4 Diatomaceous earth. For all series compositions, 5. O perc
18、ent diatomaceous earth shall be used. requirements of MIL-D-20550, grade B. The diatomaceous earth shall meet the 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-T-23L32A 13 9999906 0303072 O -. MIL-T- 2 31 32A AS) 3.3 Formulation. The materia
19、l components forming the delay composi- tions shall be homogeneously mixed. are described in 6.4. Advisory manufacturing procedures 3.3.1 Composition. In order to meet the specific burning time char- acteristics required, the percentage composition by weight of the tung- sten delay composition shall
20、 be determined by pilot mixture. (See fig- ures 1 and 2 for effects of tungsten particle size and percentage tmg- sten.) Acceptance of the composition which conforms to the performance tests of 3.4, 3.5, and 3.6 shall be considered satisfactory compliance with the composition formulation. An advisor
21、y procedure for pilot mix- ture is given in 6.4.1 and 6.4.2. 3.4 Burning time at 24“ f 4“ C. The burning time of tungsten delay compositions shall conform to the basic time and tolerance designed in the drawings, specification, or contract as furnished. The burning time of tungsten delay composition
22、s is an average time ascertained under the provisions of 4.3.2. The percent coefficient of variation (C.V.) of observed burning times shall be not greater than indicated below for the ranges indicated. Seri es Burning time range, C.V., sec/in, % I 0.15 up to 1.0 7.0 (max.) II 1.0 up to 5.0 5.0 (max.
23、) IIIA, IIIB . 5.0 up to 20.0 4.0 (max.) IIIC, IV, v 20.0 up to 38.0 3.0 (max.) 3.5 Low-temperature functioning. The burning time shall not be increased by more than 20.0 percent when the initial temperature is changed from 24“ k 4“ C to -54“ k 2“ C. be applicable in determination of low-temperature
24、 functioning. The percent coefficient of variation of observed burning time shall be as specified in 3.4 at all required temperatures, The provisions of 4.4.3 shall 3.6 Delay performance. There shall be no delay failures at room temperature or at low temperature. A delay failure shall be a condi- ti
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT23132A1972TUNGSTENDELAYCOMPOSITION 迟滞 合成物 PDF

链接地址:http://www.mydoc123.com/p-982617.html