1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#% ).4%2.!4)/.!,G0G04%,%0(/.%G0G0#)2#5)43-!).4%.!.#%G0G0-%4(/$3)45G134G0G02ECOMMENDATIONG0G0- (Extract from the “LUEG0“OOK)NOTES1 ITU-T Recommendation M.730 was published in Fascicle IV.1 of the Blue
2、 Book. This file is an extract fromthe Blue Book. While the presentation and layout of the text might be slightly different from the Blue Book version, thecontents of the file are identical to the Blue Book version and copyright conditions remain unchanged (see below).2 In this Recommendation, the e
3、xpression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 1988, 1993All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic ormechanical, including photoc
4、opying and microfilm, without permission in writing from the ITU.Fascicle IV.1 - Rec. M.730 1Recommendation M.730Fascicle IV.1 - Rec. M.730MAINTENANCE METHODS1 GeneralIn order to meet the service demands of a progressive and rapidly expanding international fully automatictelephone network with the b
5、est possible quality of service, it is essential that all factors adversely affecting the qualityof service should be detected and service restored as quickly as possible. In setting this objective it is recognized thatperfect performance is unattainable and that beyond a certain point, costs can ri
6、se sharply out of proportion comparedwith service quality gain.When choosing a suitable maintenance method or a combination of methods one should consider: the reliability of the plant to be maintained; the availability of testing and supervisory facilities as well as the availability and quality of
7、 manpower inthe maintenance organization; the availability of facilities in the plant that indicate the existence and frequency of disturbances; the availability of arrangements for automatic remedial action; the availability of automatic means to process and analyse operational data received from t
8、he plant; the final objective i.e. to ensure a satisfactory overall service quality (subscriber-to-subscriber) in theinternational connection, giving equal importance to the national and international parts of the chain thatconstitute the connection.It is recognized that a combination of maintenance
9、 methods may be applied.2 Preventive maintenance methods2.1 GeneralThe introduction of stored program control (SPC) exchanges and digital transmission systems reduce the needfor preventive maintenance. SPC exchanges should in general be provided with functions which supervise the signalling,switchin
10、g and transmission processes. If a fault occurs or if pre-set disturbance limits are reached, data which indicatethe concerned device(s) or circuit(s) should be printed out.External supervision, testing and fault localization functions should be avoided if internal functions in SPCexchanges or digit
11、al transmission systems can provide the same facilities.2.2 Functional tests2.2.1 In carrying out functional tests, ordinary working conditions apply and the equipment and circuits are taken asfound.They are carried out on a systematic basis to discover faults that would influence the quality of ser
12、vice. Theresponse to each signal may be tested by equipment provided for this purpose. Such tests may be applied to any part ofthe signalling path.2.2.2 Functional tests are carried out locally, or from either end of an international circuit to the other.2.2.3 The organization of the programme for c
13、arrying out functional tests locally is left to the discretion of theAdministration responsible for the international exchange.2.2.4 Overall functional tests on an international circuit are such that they can be made from one end of the circuitwithout cooperation of technical personnel at the other
14、end of the circuit. These tests may utilize the switchingequipment at each end of the circuit, but such equipment is not being tested directly, only the circuit.The verification of satisfactory signalling operation may be done by using various types of tests: Certain types of tests not requiring any
15、 special equipment, for example checking that a seizing signal isfollowed by the return of a proceed-to-send signal and that a clear-forward signal is followed by thereturn of a release-guard signal.2 Fascicle IV.1 - Rec. M.730 Other types combining several tests, using special equipment at both end
16、s. Any type which is in generaluse by Administrations may be used if suitable and agreed between the Administrations concerned1).2.3 Circuit limit tests2.3.1 A circuit limit test is made to verify that the international circuit meets specified operating margins. These testsenable the performance of
17、the whole international circuit to be checked. They will be made as required but normally atthe following times: before putting the circuit into service; according to a systematic test programme which may be based on measurement results or fault (trouble)statistics or quality of service observations
18、 (see Recommendation M.605).They may also be made if functional tests indicate a fault, in order to locate such a fault.Circuit limit tests may be made with respect either to transmission or to signalling conditions.2.3.2 The frequency of such tests will be determined by the Administrations concerne
19、d and the test conditions to beapplied will be in conformity with CCITT Recommendations.2.3.3 The test equipment, the specifications and methods of gaining access to this equipment are described in thespecifications of international signalling, switching and transmission equipment.2.4 Limit tests on
20、 the constituent parts of a circuit2.4.1 These limit tests are made to verify that the constituent parts of a circuit meet specified operating margins.They will be made as required but normally at the following times: at installation; if functional or limit tests on the circuit indicate a fault, if
21、such tests will help in fault location; systematic test programmes which may be based on measurement results or trouble statistics or quality ofservice observations.2.4.2 The frequency of such tests will be determined by the Administrations concerned and the test conditions to beapplied will be in c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM7301988MAINTENANCEMETHODS 维护 方法 PDF