GME TM 412600-2013 TPO-Foil (Issue 2 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement).pdf
《GME TM 412600-2013 TPO-Foil (Issue 2 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement).pdf》由会员分享,可在线阅读,更多相关《GME TM 412600-2013 TPO-Foil (Issue 2 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement).pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、ADAM OPEL AGTDCCentral LaboratoriesTECHN. LIEFERBEDINGUNGENFR WERKSTOFFEENGINEERINGMATERIAL SPECIFICATIONLIMITED USETM 412600TPO-Folie / TPO-Foil1 Werkstoff / MaterialTPO-Folie mit PO-Schaum auf Trgerwerkstoff (z.B. TM 912800) kaschiert. /TPO-Foil with PO foam laminated to a carrier material (e.g. T
2、M 912800).2 Verwendungszweck / ApplicationFolie, z.B. fur Armaturentafel. /Foil, e.g. for dashboard.3 Bemerkung / NoteFreigabemuster, fr die diese Vorschrift zutrifft, mssen nach dieser Vorschrift geprft werden und von derProduktentwicklung genehmigt sein, ehe eine Lieferung erfolgen kann. Bei beabs
3、ichtigter Abweichung vondieser Vorschrift oder von den bisher freigegebenen Mustern ist der Hersteller verpflichtet, unaufgefordert denAbnehmer mit einer Dokumentation ber alle vorgesehenen Vernderungen zu informieren. Auf Anforderungsind Prfmuster in der genderten Ausfhrung zur erneuten Bemusterung
4、 und Genehmigung durch dieProduktentwicklung vorzulegen, bevor die Abweichung in der Lieferung einsetzen kann. /Samples of components or material released to this specification shall be tested for conformity with therequirements of this specification and approved by Product Engineering prior to comm
5、encement of delivery ofbulk supplies. In the event of any intentional deviations from the requirements of this specification or thepreviously released samples, it is the sole responsibility of the supplier to inform the purchaser unsolicited witha documentation of all such deviations. Upon request t
6、he supplier shall submit samples of the changedversion for reapproval by Product Engineering prior to commencement of delivery of deviant bulk supplies.Ausfertigungs-Nr.:Issue: 2Datum:Date: 03/2013Ausgefertigt:Prepared: JKRGenehmigt:Approved: T. WeiserSeite vonPage 1 of 6Unbeschadet etwaiger durch d
7、en Abnehmer erfolgenden Stichprobenprfungen trgt der Lieferant die Verantwortung dafr, da die gelieferteWare die Opel-Zeichnungsvorschriften erfllt. Ein Prfbericht mit zahlenmigen Ergebnissen aus Prfungen der Lieferung selbst ist bei jederBemusterung, Erstbelieferung und Ausfhrungsnderung mitzugeben
8、.Despite spot checks possibly performed by Opel, it is the suppliers responsibility that the delivered parts are in line with the Opel drawings.Deliveries of samples, first off-tool parts and parts, whose performance has been changed, must be accompanied by a test report showing thetest results in t
9、erms of figures.LBSP TL WS 1 11/95Note: This standard may be applied only for current programs. It is inactive for all futureprojects and without replacement.Hinweis: Diese Spezifikation darf nur noch fr laufende Projekte angewendet werden und istfr alle zuknftigen Projekte ohne Ersatz ungltig.LIMIT
10、ED USE TM 412600Ausfertigungs-Nr.:Issue: 2Datum:Date: 03/2013Ausgefertigt:Prepared: JKRGenehmigt:Approved: T. WeiserSeite 2 von 6Page ofS O L LSpecified valueI S TActual value4 Anforderungen / RequirementsBei den nachfolgenden fertigungsbedingten Eigenschaftenentspricht die Querrichtung der Fahrtric
11、htung. Die Probekrpersind aus moglichst planen Bereichen des Fertigteils zuentnehmen.Die Kennzeichnung des Entnahmebereichs auf derentsprechenden Teilzeichnung ist ggf. zu beachten. DiePrfungen Pos. 4.4.1 bis 4.4.8 werden grundstzlich amzeichnungsgerechten Zusammenbau ermittelt. Bei den brigenPrfung
12、en wird die zu bewertende Folie von dem Fertigteil-Zusammenbau abgetrennt und der jeweiligen Prfungunterzogen. /For the following requirements applies: the transversal directionequals the driving direction. Test pieces shall be taken from theflattest possible area of the finished part. The area from
13、 whichtest pieces shall be cut may be shown on the respectivecomponent drawing and where applicable, this shall be compliedwith.Tests to clause 4.4.1 to 4.4.8 shall be made on the assembly todrawing. For the remaining tests the foil shall be splitted of fromthe finished part assembly and tested.4.1
14、Anforderungen an die Gesamt-Folie mitSchaum / Requirements for the Complete Foil withFoam4.1.1 Flchengewicht / Weight per Unit Areanach/to GME 60301 - (550 50) g/m2 min4.1.2 Dicke / Thicknessnach/to GME 60303 - 1 A - (2,1 0,25) mm4.1.3 Glhrckstand / Residue on Ignitionnach/to GME 60333 -A 2 - 5Masse
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMETM4126002013TPOFOILISSUE2ENGLISHGERMANTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROGRAMSITISINACTIVEFORALLFUTUREPROJECTSANDWITHOUTREPLACEMENTPDF

链接地址:http://www.mydoc123.com/p-756473.html