GME 15492-2007 Antenna Coaxial Cable (English).pdf
《GME 15492-2007 Antenna Coaxial Cable (English).pdf》由会员分享,可在线阅读,更多相关《GME 15492-2007 Antenna Coaxial Cable (English).pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、GeneralSpecificationElectrical Function GME15492Antenna Coaxial Cable1 Introduction 21.1 Scope 21.2 Mission / Theme 21.3 Classification 21.3.1 Temperature Classes 22 References 32.1 External Standards/Specifications 32.2 GM Group Standards/Specifications 32.3 Additional References 33 Test Preparatio
2、n and Evaluation 33.1 Resources 33.1.1 Calibration 33.1.2 Alternatives 33.1.3 Facilities 33.1.3.1 Ovens 33.1.4 Equipment 33.2 Test Samples 33.3 Conditioning 33.4 Documentation 33.4.1 Test Results 33.4.2 Deviations from Test Procedure 44 Requirements and Procedure 44.1 Material 44.1.1 Conductor 44.1.
3、2 Insulation 44.1.3 Material of the Sheath 44.1.4 Identification 44.1.4.1 IR-Spectrum 44.2 Marking 44.3 Colours 44.4 Dimensions 44.4.1 Cable Outside Diameter 44.4.1.1 Test Samples 44.4.1.2 Apparatus 44.4.1.3 Procedure 44.4.1.4 Interpretation of Results 44.4.2 Conductor Diameter 44.4.2.1 Test Sample
4、44.4.2.2 Apparatus 44.4.2.3 Procedure 44.4.2.4 Interpretation of Results 44.4.3 Diameter of Strand 44.4.3.1 Procedure 44.4.3.2 Interpretation of Results 44.4.4 Thickness of the Sheath 44.4.4.1 Preparation of the Test Sample 44.4.4.2 Apparatus 54.4.4.3 Measurement Procedure 54.4.4.4 Interpretation of
5、 Results 54.4.5 Type of Screen(s) 54.4.5.1 Interpretation of Results 54.5 Electrical Characteristics 74.5.1 General 74.5.1.1 Test Sample 74.5.1.2 Apparatus 74.5.1.3 Procedure 74.5.1.4 Interpretation of Results 74.5.2 Characteristic Impedance 74.5.3 Resistance 74.5.4 Capacitance 74.5.5 Attenuation Lo
6、ss 74.5.6 Isolation 74.5.7 Velocity Ratio 74.5.8 Withstand Voltage of Dielectric 74.5.9 Power Rating 74.5.10 Return Loss 74.5.11 Current 74.5.12 Inductance 74.5.13 Delay 74.5.14 EMC Requirement 74.6 Mechanical Characteristic 114.6.1 Resistance to Cold 114.6.1.1 Test Sample 114.6.1.2 Apparatus 114.6.
7、1.3 Prcoedure 114.6.1.4 Interpretation of Results 114.6.2 Short-Term Ageing 114.6.2.1 Test Sample 114.6.2.2 Apparatus 114.6.2.3 Procedure 114.6.2.4 Interpretation of Result 114.6.3 Long-Term Ageing 114.6.3.1 Test Sample 11 Copyright 2007 General Motors Corporation All Rights ReservedPublication Depa
8、rtment: GME Specification CenterOctober 2007 - Issue No. 1 Page 1 of 13PRD045 - VPRE ST 1 10/03GME15492 GM EUROPE ENGINEERING STANDARDS4.6.3.2 Apparatus 114.6.3.3 Procedure 114.6.3.4 Interpretation of Results 114.6.4 Shrinkage in Heat 114.6.4.1 Test Sample 114.6.4.2 Apparatus 114.6.4.3 Procedure 114
9、.6.4.4 Interpretation of Results 124.6.5 Static Bending 124.6.5.1 Test Sample 124.6.5.2 Apparatus 124.6.5.3 Interpretation of Results 124.6.6 Cyclic Bending Test 124.6.6.1 Test Sample 124.6.6.2 Apparatus 124.6.6.3 Procedure 124.6.6.4 Interpretation of Results 124.6.7 Reistance to Flame Propagation 1
10、24.6.8 Temperature Humidity Cycling 124.6.8.1 Test Sample 124.6.8.2 Apparatus 124.6.8.3 Procedure 124.6.8.4 Interpretation of Results 125 Additional Requirements 125.2 Compatibility 125.3 Connectors 136 Notes 136.1 Glossary 136.2 Acronyms, Abbreviations andSymbols137 Additional Paragraphs 138 Coding
11、 System 139 Release and Revisions 139.1 Release 139.2 Revisions 131 IntroductionNote: Nothinginthisstandardsupersedesapplicablelaws and regulations.Note: In the event of a conflict between the Eng-lish and the domestic language, the English languageshall take precedence.1.1 Scope. This standard is b
12、ased on ISO 14572,to which additions have been made in several para-graphs.1.2 Mission / Theme. This standard specifiesdimensions, test methods and requirements forantenna coaxial cables.1.3 Classification. The cables are classified by theimpedance, attenuation loss and temperature.1.3.1 Temperature
13、 Classes. Five cable classeshave been defined in Table 1 to respond to thevarious temperatures encountered on vehicles.Note: Nothinginthisstandardsupersedesapplicablelaws and regulations. Copyright 2007 General Motors Corporation All Rights ReservedPage 2 of 13 Issue No. 1 - October 2007PRD045 - VPR
14、E ST G 10/03GM EUROPE ENGINEERING STANDARDS GME15492Table 1: Temperature ClassesClassOperatingtemperaturein CLong-term ageingtemperature 3000 hin CShort-term ageingtemperature 240 hin CThermal overloadtemperature 6 hin CA -40.+85 +852 +1102 +1352B -40.+100 +100 3 +1253 +1503C -40.+125 +125 3 +1503 +
15、1753D -40.+150 +150 3 +1753 +2003E -40.+175 +175 3 +2003 +25032 ReferencesNote: Only the latest approved standards are appli-cable unless otherwise specified.2.1 External Standards/Specifications.IEC 62153-4-3ISO 14572ISO DIS 20860-1SAE/USCAR-172.2 GM Group Standards/Specifications.GME8740GME14022GM
16、E14090GMW3059ON 2022.3 Additional References. None.3 Test Preparation and Evaluation3.1 Resources.3.1.1 Calibration. The test facilities and equipmentshall be in good working order and shall have a validcalibration label.3.1.2 Alternatives. Alternative test facilities andequipment may also be used.
17、However, all mea-suring variables as specified in this standard shallbe determined correctly with respect to its physicaldefinition.3.1.3 Facilities.3.1.3.1 Ovens. When an oven is required, unlessotherwise specified it shall be a hot air oven. The aircontained in the oven shall be completely changed
18、 atleast 8 times/h and 20 times/h max. at the specifiedtemperature.3.1.4 Equipment. As specified in the single tests.3.2 TestSamples. Numberoftestsamplesarespec-ified in each section. The cables shall be manufac-tured under full production conditions. No parts out ofprototype tools shall be used.3.3
19、 Conditioning. Test samples for all tests shall bepreconditioned for at least 16 h at a temperature of(+23 5) C (room temperature) anda relative humid-ityof (45.75) %. Unless otherwise specified, all testsother than “inprocess”testsshallbe conducted atthistemperature.3.4 Documentation. Samples of co
20、mponents ormaterial released to this standard shall be tested forconformity with the requirements of this standard andapproved by the responsible GM Department prior tothe start of delivery of production level componentsor materials.Any change to the component or materiale.g. design,function, proper
21、ties, manufacturing process and/orlocation of manufacture requires a new releaseof the product. It is the sole responsibility of thesupplier to provide the customer, unsolicited, withdocumentation of any change or modification to theproduct/process, and to apply for a new release.If not otherwise ag
22、reed to the entire verification testshall be repeated and documented by the supplierprior to start of delivery of the modified or changedproduct. In some cases a shorter test can be agreedto between the responsible GM Department and thesupplier.3.4.1 TestResults. The test results shallbe reportedina
23、 test report (seeGME14022). Thetest report shallinclude as minimum:Name of the supplier.Date.Designation of product. Copyright 2007 General Motors Corporation All Rights ReservedOctober 2007 - Issue No. 1 Page 3 of 13PRD045 - VPRE ST U 10/03GME15492 GM EUROPE ENGINEERING STANDARDSIMDS-ID and informa
24、tion, if the IMDS datasheethas been approved by the customer.Reference to used test method.Test results and interpretation of results.3.4.2 Deviations from Test Procedure. Deviationsfrom the requirements of the test procedures shallhave been agreed upon. Such requirements shallbe specifiedon compone
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME154922007ANTENNACOAXIALCABLEENGLISHPDF
