BS 8552-2012 Sampling and monitoring of water from building services closed systems Code of practice《建筑设备封闭系统中水的采样和监测 实施规程》.pdf
《BS 8552-2012 Sampling and monitoring of water from building services closed systems Code of practice《建筑设备封闭系统中水的采样和监测 实施规程》.pdf》由会员分享,可在线阅读,更多相关《BS 8552-2012 Sampling and monitoring of water from building services closed systems Code of practice《建筑设备封闭系统中水的采样和监测 实施规程》.pdf(46页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS 8552:2012Sampling and monitoringof water from buildingservices closed systems Code of practicePublishing and copyright informationThe BSI copyright notice displayed in this do
2、cument indicates when the documentwas last issued. The British Standards Institution 2012Published by BSI Standards Limited 2012ISBN 978 0 580 70237 2ICS 13.060.01The following BSI references relate to the work on this standard:Committee reference EH/3Draft for comment 12/30215289 DCPublication hist
3、oryFirst published November 2012Amendments issued since publicationDate Text affectedBS 8552:2012 BRITISH STANDARDContentsForeword ii0 Introduction 11 Scope 12 Normative references 23 Terms and definitions 34 Design of the sampling programme 45 Sample locations and frequency 116 Sampling methodology
4、 157 Documentation and reporting of results 228 Interpretation of results 23AnnexesAnnex A (normative) Sampling points 24Annex B (normative) Laboratory analytical methods for water qualitysampling 25Annex C (informative) Method for detecting sulfate reducing bacteria (SRBs) 33Annex D (informative) M
5、inimum performance requirements for on-siteanalysis 36Annex E (normative) Interpretation of results for pre-commission cleaning 36Bibliography 39List of figuresFigure A.1 Binder pressure test point for sampling dissolved oxygen 25Figure E.1 Interpretation of guidelines in relation to BSRIA BG29 38Li
6、st of tablesTable 1 Life stages of the closed-circuit water system 5Table 2 Suggested analyses 8Table 2 Suggested analyses 9Table 3 Examples of corrosion and scale inhibitors 10Table 4 Examples of analysis for permit to discharge application 11Table 5 Number of sample locations between filling/press
7、ure testing andpre-commission cleaning 12Table 6 Minimum number of sample locations immediately post-clean and upto practical completion 14Table A.1 Selection of sampling points 24Table B.1 Reference analytical methods 32Table C.1 Probabilities of detecting the presence of SRBs using the five-daytes
8、t 34Table D.1 Minimum performance requirements for on-site analysis of water inbuilding services closed systems 36Summary of pagesThis document comprises a front cover, an inside front cover, pages i to ii,pages 1 to 40, an inside back cover and a back cover.BRITISH STANDARD BS 8552:2012 The British
9、 Standards Institution 2012 iForewordPublishing informationThis British Standard is published by BSI Standards Limited, under license fromThe British Standards Institution, and came into effect on 30 November 2012. Itwas prepared by Technical Committee EH/3, Water quality. A list oforganizations rep
10、resented on this committee can be obtained on request to itssecretary.Use of this documentAs a code of practice, this British Standard takes the form of guidance andrecommendations. It should not be quoted as if it were a specification andparticular care should be taken to ensure that claims of comp
11、liance are notmisleading.Any user claiming compliance with this British Standard is expected to be able tojustify any course of action that deviates from its recommendations.Presentational conventionsThe provisions in this standard are presented in roman (i.e. upright) type. Itsrecommendations are e
12、xpressed in sentences in which the principal auxiliaryverb is “should”.Commentary, explanation and general informative material is presented insmaller italic type, and does not constitute a normative element.Contractual and legal considerationsThis publication does not purport to include all the nec
13、essary provisions of acontract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legalobligations.BRITISH STANDARDBS 8552:2012ii The British Standards Institution 20120 IntroductionThis British Standard addresses the particular issues o
14、f sampling water fromclosed-circuit heating and cooling systems in buildings and related infrastructure,from construction, pressure testing, pre-commission cleaning and commissioningto routine operation. The purpose of sampling a closed-circuit water system is toprovide information about the current
15、 condition of that system and/or thewater within it. That might include, but is not limited to, water treatmentstatus, water quality, bacteriological contamination and corrosion activity.Confidence in the results obtained, which are crucially dependent on consistentsampling and analysis protocols, i
16、s extremely important to industry.Sampling of water used to fill the system is used to assess whether the water issuitable for unrestricted use or requires pre-treatment.Sampling of system water between filling and pre-commission cleaning is usedto monitor the growth of bacteria that could lead to l
17、ong-term corrosion andwater quality problems.Sampling of system water on completion of pre-commission cleaning is used toverify the success of the pipework flushing and cleaning procedures. Failure toachieve industry guidelines on system cleanliness can result in expensiveremedial work and contractu
18、al disputes.Sampling of system water prior to practical completion is used to demonstratethat the system is fit to be handed over.Sampling of system water during normal operation is used to establish that thewater treatment regime is being correctly applied and is effective in minimizingthe risk of
19、corrosion and other water quality issues.Sampling prior to discharge of water from the system is used to apply for, andestablish compliance with, discharge permits.This standard does not set guidelines for water quality; only the sampling andanalysis methods that are recommended to assess whether gu
20、idelines set byothers have been achieved. These are critical in the commissioning and lifecyclemaintenance of closed-circuit system heating and cooling systems in new andrenovated buildings to prevent the onset of operational problems andpremature failure.1 ScopeThis British Standard gives recommend
21、ations and guidance for the sampling ofwater from closed-circuit heating and cooling systems in buildings and relatedinfrastructure to maintain water quality and the integrity of pipework, plantand fittings, including:a) hydronic space heating and cooling systems;b) heat pump ground and water loops;
22、c) thermal storage systems;d) closed-circuit condenser water systems;e) low-temperature district heating and cooling mains;f) generator cooling systems; andg) similar closed-circuit water systems.The standard gives recommendations for the design of the sampling programmeduring each phase of the syst
23、em lifecycle, including the location and suitabilityof sampling points, frequency of sampling and record keeping, to facilitate thecontrol of closed system water quality throughout the life of the building.BRITISH STANDARD BS 8552:2012 The British Standards Institution 2012 1It also gives guidance o
24、n:1) procedures for the collection, preservation, handling and storage of samplesprior to analysis (by reference to BS EN ISO 5667-3); analytical methods (byreference to other British Standards and approved methods) and thestatistical treatment of results; and2) the selection of the analytical param
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS85522012SAMPLINGANDMONITORINGOFWATERFROMBUILDINGSERVICESCLOSEDSYSTEMSCODEOFPRACTICE 建筑设备 封闭系统 中水 采样

链接地址:http://www.mydoc123.com/p-547489.html