ASTM B213-2013 Standard Test Methods for Flow Rate of Metal Powders Using the Hall Flowmeter Funnel《使用霍尔流量计漏斗的金属粉末流量的标准试验方法》.pdf
《ASTM B213-2013 Standard Test Methods for Flow Rate of Metal Powders Using the Hall Flowmeter Funnel《使用霍尔流量计漏斗的金属粉末流量的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM B213-2013 Standard Test Methods for Flow Rate of Metal Powders Using the Hall Flowmeter Funnel《使用霍尔流量计漏斗的金属粉末流量的标准试验方法》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: B213 11B213 13Standard Test Methods forFlow Rate of Metal Powders Using the Hall FlowmeterFunnel1This standard is issued under the fixed designation B213; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of las
2、t revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope*1.1 This test method covers the determinati
3、on of a flow rate, by the use of the Hall Flowmeter funnel of metal powders andpowder mixtures. It is suitable only for those powders that will flow unaided through the Hall Flowmeter funnel.1.2 With the exception of the values for density and the mass used to determine density, for which the use of
4、 the gram per cubiccentimeter (g/cm3) and gram (g) units is the longstandinglong-standing industry practice, the values in inch-pound units are to beregarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for informationonly, and are not consi
5、dered standard.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.2.
6、 Referenced Documents2.1 ASTM Standards:2B215 Practices for Sampling Metal PowdersB243 Terminology of Powder MetallurgyB855 Test Method for Volumetric Flow Rate of Metal Powders Using the Arnold Meter and Hall Flowmeter FunnelB964 Test Methods for Flow Rate of Metal Powders Using the Carney Funnel3.
7、 Terminology3.1 DefinitionsDefinitions of powder metallurgy terms can be found in Terminology B243.3.2 Definitions of Terms Specific to This Standard:3.2.1 Hall flow rate (FRH), nthe time required for a metal powder sample of specified mass to flow through the orifice in aHall Flowmeter funnel accor
8、ding to a specified procedure.4. Summary of Test Method4.1 A weighed mass (50.0 g) of metal powder is timed as it flows through the calibrated orifice of a Hall Flowmeter funnel.5. Significance and Use5.1 The rate and uniformity of die cavity filling are related to flow properties, which thus influe
9、nce production rates anduniformity of compacted parts.5.2 The ability of a powder to flow is a function of interparticle friction.As interparticle friction increases, flow is slowed. Finepowders may not flow. Some powders, often fine powders and lubricated powder mixtures, may not flow through the H
10、allFlowmeter funnel. Nevertheless, if a larger orifice is provided, such as in the Carney Flowmeter funnel of Test Method B964B964,a meaningful flow rate may be determined, providing specific information for certain applications.1 This test method is under the jurisdiction of ASTM Committee B09 on M
11、etal Powders and Metal Powder Products and is the direct responsibility of B09.02 on BaseMetal Powders.Current edition approved Nov. 15, 2011April 1, 2013. Published December 2011June 2013. Originally approved in 1946. Last previous edition approved in 20032011 asB213 03.B213 11. DOI: 10.1520/B0213-
12、11.10.1520/B0213-13.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and
13、 is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only t
14、he current versionof the standard as published by ASTM is to be considered the official document.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15.3 Test Method B213B213
15、, using the Hall Flowmeter funnel, is the preferred method for determining the flowability of metalpowders and powder mixtures. The Carney Flowmeter funnel of Method B964 should only be used when powder will not flowthrough the Hall Flowmeter funnel.5.4 Humidity and moisture content influence flow r
16、ate. Wet or moist powders may not flow.5.5 These test methods are based on flow of a specified mass of powder. If flow of a specific volume of powder is preferred,Test Method B855 may be used for powders that flow readily through the Hall Flowmeter funnel.5.6 This test method may be part of the purc
17、hase agreement between powder manufacturers and powder metallurgy (PM) partproducers, or it can be an internal quality control test by either the producer or the end user.6. Apparatus6.1 Powder Flowmeter Funnel3A flowmeter funnel (Fig. 1) having a calibrated orifice of 0.10 in. (2.54 mm) in diameter
18、.6.2 The dimensions shown for the flowmeter funnel, including the orifice, are not to be considered controlling factors.Calibration with emery, as specified in Section 9, determines the working flow rate of the funnel.6.3 Stand3A stand (Fig. 2) to support the powder flowmeter funnel.6.4 WorkbenchA l
19、evel, vibration free table or workbench to support the powder flowmeter stand.6.5 Timing DeviceA stopwatch or other suitable device capable of measuring to the nearest 0.1 s.6.6 Chinese Emery3An emery powder used to calibrate the flowmeter funnel.6.7 BalanceA balance readable to 0.01 g suitable for
20、weighing at least 50.0 g to the nearest 0.1 g.7. Sampling7.1 A test sample of powder sufficient to run the desired number of flow tests shall be obtained in accordance with PracticeB215.7.2 Individual test portions, each of approximately the required mass, shall be obtained from the test sample in a
21、ccordance withPractice B215.8. Preparation of Apparatus8.1 Clean the funnel with clean dry toweling paper.8.2 Clean the funnel orifice with a clean dry pipe cleaner.9. Calibration of Apparatus9.1 The manufacturer supplies the powder flowmeter funnel calibrated as follows:9.1.1 Heat an open glass jar
22、 of Chinese emery in a drying oven at a temperature of 102 to 107C 107 C (215 to 225F) 225F) for 1h.9.1.2 Cool the emery to room temperature in a dessicator.desiccator.9.1.3 Follow the procedure outlined in steps 10.1.1-10.1.8.9.1.4 Repeat steps 10.1.2-10.1.8 using the identical 50.0 g mass of emery
23、 for all the tests until 5 flow times, the extremes ofwhich shall not differ by more than 0.4 s, have been recorded.NOTE 1The flow rate of Chinese emery calibration powder is sensitive to moisture. Starting from the dried condition, it will absorb moisture fromthe ambient air as five (or more) flow
24、tests are performed. Flow times can vary dependent upon the humidity of the test area.9.1.5 The average of these five flow times is stamped on the bottom of the funnel.The correction factor for the unused flowmeterfunnel is 40.0 divided by this number.9.2 The flow rate of Chinese emery powder was es
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMB2132013STANDARDTESTMETHODSFORFLOWRATEOFMETALPOWDERSUSINGTHEHALLFLOWMETERFUNNEL 使用 霍尔 流量计 漏斗 金属粉末

链接地址:http://www.mydoc123.com/p-460629.html