ARMY UFGS-02 83 14 00 10-2010 ASBESTOS HAZARD CONTROL ACTIVITIES《石棉危害控制活动》.pdf
《ARMY UFGS-02 83 14 00 10-2010 ASBESTOS HAZARD CONTROL ACTIVITIES《石棉危害控制活动》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 83 14 00 10-2010 ASBESTOS HAZARD CONTROL ACTIVITIES《石棉危害控制活动》.pdf(62页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 83 14.00 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 83 14 00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02
2、82 14.00 10ASBESTOS HAZARD CONTROL ACTIVITIES02/10PART 1 GENERAL1.1 PAYMENT PROCEDURES1.2 REFERENCES1.3 DEFINITIONS1.3.1 Amended Water1.3.2 Asbestos-Containing Material (ACM)1.3.3 Authorized Person1.3.4 Building Inspector1.3.5 Class I Asbestos Work1.3.6 Class II Asbestos Work1.3.7 Class III Asbestos
3、 Work1.3.8 Class IV Asbestos Work1.3.9 Clean Room1.3.10 Competent Person1.3.11 Contractor/Supervisor1.3.12 Critical Barrier1.3.13 Decontamination Area1.3.14 Demolition1.3.15 Disposal Bag1.3.16 Disturbance1.3.17 Equipment Room or Area1.3.18 Fiber1.3.19 Friable ACM1.3.20 Glovebag1.3.21 High-Efficiency
4、 Particulate Air (HEPA) Filter1.3.22 Intact1.3.23 Model Accreditation Plan (MAP)1.3.24 Negative Initial Exposure Assessment1.3.25 NESHAP1.3.26 Nonfriable ACM1.3.27 Nonfriable ACM (Category I)1.3.28 Nonfriable ACM (Category II)1.3.29 Permissible Exposure Limits (PELs)1.3.29.1 PEL-Time Weighted Averag
5、e(TWA)1.3.29.2 PEL-Excursion LimitSECTION 02 82 14.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3.30 Regulated Area1.3.31 Removal1.3.32 Repair1.3.33 Surfacing ACM1.3.34 Thermal System Insulation (TSI) ACM1.3.35 Transite1.3.36 Worker1
6、.4 SYSTEM DESCRIPTION1.4.1 Abatement Work Tasks1.4.2 Unexpected Discovery of Asbestos1.4.3 Wallboard/Joint Compound1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Written Qualifications and Organization Report1.6.2 Specific Requirements1.6.3 Federal, State or Local Citations on Previous Projects1.6.4 Preco
7、nstruction Conference1.7 SAFETY1.7.1 Asbestos Hazard Abatement Plan Appendix1.7.2 Activity Hazard Analyses Appendix1.7.3 Local Exhaust System1.8 SECURITY1.8.1 Licenses, Permits and Notifications1.8.2 Regulated Areas1.8.3 Warning Signs and Tape1.8.4 Warning Labels1.9 MEDICAL SURVEILLANCE REQUIREMENTS
8、1.9.1 Respiratory Protection Program1.9.2 Respiratory Fit Testing1.9.3 Respirator Selection and Use Requirements1.9.4 Personal Protective Equipment1.9.5 Whole Body Protection1.9.5.1 Coveralls1.9.5.2 Gloves1.9.5.3 Foot Coverings1.9.5.4 Head Covering1.9.5.5 Protective Eye Wear1.10 HYGIENE1.10.1 3-Stag
9、e Decontamination Area1.10.2 Load-Out Unit1.10.3 Single Stage Decontamination Area1.10.4 Decontamination Area Exit Procedures1.10.5 Smoking1.11 TRAINING PROGRAMPART 2 PRODUCTS2.1 ENCAPSULANTS2.2 ENCASEMENT PRODUCTS2.3 RECYCLABLE MATERIALS2.4 EXPENDABLE SUPPLIES2.4.1 Glovebag2.4.2 Duct Tape2.4.3 Disp
10、osal Containers2.4.4 Sheet Plastic2.4.4.1 Flame Resistant2.4.4.2 Reinforced2.4.5 Mastic Removing Solvent2.4.6 Leak-tight WrappingSECTION 02 82 14.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4.7 Viewing Inspection Window2.4.8 Wetting
11、 Agents2.4.9 Strippable Coating2.5 EQUIPMENT2.5.1 Scales2.5.2 Tools2.5.3 Rental Equipment2.5.4 Air Monitoring EquipmentPART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.2 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN3.3 OBJECTS3.3.1 Removal of Mobile Objects3.3.2 Stationary Objects3.4 BUILDING VENTILATION
12、SYSTEM AND CRITICAL BARRIERS3.5 PRECLEANING3.6 METHODS OF COMPLIANCE3.6.1 Mandated Practices3.6.2 Control Methods3.6.3 Unacceptable Practices3.6.4 Class I Work Procedures3.6.5 Specific Control Methods for Class I Work3.6.5.1 Negative Pressure Enclosure (NPE) System3.6.5.2 Glovebag Systems3.6.5.3 Min
13、i-Enclosures3.6.5.4 Wrap and Cut Operation3.6.6 Class II Work3.6.7 Specific Control Methods for Class II Work3.6.7.1 Vinyl and Asphalt Flooring Materials3.6.7.2 Roofing Material3.6.7.3 Cementitious Siding and Shingles or Transite Panels3.6.7.4 Gaskets3.6.8 Specific Control Methods for Class III Work
14、3.6.9 Specific Control Methods for Class IV Work3.6.10 Methods for Asphaltic Wrap3.6.11 Class I Asbestos Work Response Action Detail Sheets3.6.12 Class II Asbestos Work Response Action Detail Sheets3.6.13 Abatement of Asbestos Contaminated Soil3.6.14 Enclosure of ACM3.6.15 Encapsulation of ACM3.6.16
15、 Combined Encapsulation of Acoustical Wall and Ceiling Plaster3.6.17 Response Action Detail Sheets for Repair of Class I Materials3.6.18 Response Action Detail Sheets for Repair of Class II Materials3.6.19 Encasement of ACM3.6.20 Sealing Contaminated Items Designated for Disposal3.7 FINAL CLEANING A
16、ND VISUAL INSPECTION3.8 LOCKDOWN3.9 EXPOSURE ASSESSMENT AND AIR MONITORING3.9.1 General Requirements3.9.2 Initial Exposure Assessment3.9.3 Negative Exposure Assessment3.9.4 Independent Environmental Monitoring3.9.5 Preabatement Environmental Air Monitoring3.9.6 Environmental Air Monitoring During Ab
17、atement3.9.7 Final Clearance Air Monitoring3.9.7.1 Final Clearance Requirements, NIOSH PCM Method3.9.7.2 Final Clearance Requirements, EPA TEM MethodSECTION 02 82 14.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.9.7.3 Air Clearance Fa
18、ilure3.9.8 Air-Monitoring Results and Documentation3.10 CLEARANCE CERTIFICATION3.11 CLEANUP AND DISPOSAL3.11.1 Title to ACM Materials3.11.2 Collection and Disposal of Asbestos3.11.3 Records and Management Plan3.11.3.1 Asbestos Waste Shipment Records3.11.3.2 Asbestos Management Plan- End of Section T
19、able of Contents -SECTION 02 82 14.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 83 14.00 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 83 14 00 10 (April 2006)UNIFIED FACILITIES
20、 GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 82 14.00 10ASBESTOS HAZARD CONTROL ACTIVITIES02/10*NOTE: This guide specification covers the requirements for removal, encapsulation, enclosureencasement, or repair of friable and non-friable asbestos-containing m
21、aterial (ACM) which is encountered during the demolition, alteration, renovation, or maintenance of structures, substrates, equipment or portions thereof that contain asbestos; transportation, disposal, storage, containment of; and housekeeping activities on the site at which these activities are pe
22、rformed This specification is used in conjunction with Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove infor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS02831400102010ASBESTOSHAZARDCONTROLACTIVITIES 石棉 危害 控制 活动 PDF

链接地址:http://www.mydoc123.com/p-449536.html