ARMY UFGS-02 66 00-2010 SELECT FILL AND TOPSOIL FOR LANDFILL COVER《选择掩埋覆土的填方和表层土》.pdf
《ARMY UFGS-02 66 00-2010 SELECT FILL AND TOPSOIL FOR LANDFILL COVER《选择掩埋覆土的填方和表层土》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 66 00-2010 SELECT FILL AND TOPSOIL FOR LANDFILL COVER《选择掩埋覆土的填方和表层土》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 66 00 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 66 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 66 00SELECT
2、FILL AND TOPSOIL FOR LANDFILL COVER02/10PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SUBMITTALSPART 2 PRODUCTS2.1 Select Fill2.2 TOPSOIL2.3 EQUIPMENTPART 3 EXECUTION3.1 BORROW SOURCE ASSESSMENT REPORT3.1.1 Select Fill3.1.1.1 Classification Testing3.1.1.2 Moisture-Density (Compaction) Testing3.1.2
3、Topsoil3.1.3 Chemical Contamination Testing3.2 INSTALLATION3.2.1 Select Fill Placement3.2.1.1 Initial Lift of Select Fill Placed Over Geosynthetics3.2.1.2 Subsequent Lifts of Select Fill3.2.2 Topsoil Placement3.3 CONSTRUCTION TOLERANCES3.4 CONSTRUCTION TESTS3.4.1 Select Fill and Topsoil Material Tes
4、ts3.4.2 Moisture Content and Density Tests of In-Place Select Fill3.4.2.1 Test Frequencies and Locations3.4.2.2 Nuclear Density and Moisture Content Tests3.4.2.3 Test Results3.5 PROTECTION3.5.1 Damage3.5.2 StockpilesSECTION 02 66 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking pe
5、rmitted without license from IHS-,-,- End of Section Table of Contents -SECTION 02 66 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 66 00 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02
6、66 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 66 00SELECT FILL AND TOPSOIL FOR LANDFILL COVER02/10*NOTE: This guide specification covers the requirements for select fill and topsoil layers for landfill cover systems. Select
7、 fill is the term used by USACE to describe soil layers placed directly on geosynthetic materials.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove informatio
8、n and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designat
9、ion and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: Delete this paragraph when work is covered by a lump-sum contract price. Weight measurement may be used to supplement volume measurem
10、ent surveys if significant subgrade settlement is anticipated.*Measurement and payment for “select fill“ and “topsoil“ shall be based on the respective unit prices for each cubic meter yard of “select fill“ and “topsoil“ in place. This unit price shall include the cost for development of borrow sour
11、ces, cost of materials, excavation, hauling, equipment, SECTION 02 66 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-placement, testing, and other work required to construct the “select fill“ or “topsoil“ layers.1.2 REFERENCES*NOTE: This pa
12、ragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RI
13、D outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification whe
14、n you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 1556 (2007) Density and Unit Wei
15、ght of Soil in Place by the Sand-Cone MethodASTM D 2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon MethodASTM D 2216 (2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by MassASTM D 2487 (2006e1) Soils for Engineering Purposes (Unified Soil Classi
16、fication System)ASTM D 2974 (2007a) Moisture, Ash, and Organic Matter of Peat and Other Organic SoilsASTM D 422 (1963; R 2007) Particle-Size Analysis of SoilsASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of SoilsASTM D 4972 (2001; R 2007) pH of SoilsASTM D 6938 (2008a) Standar
17、d Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)SECTION 02 66 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM D 698 (2007e1) Laboratory Compaction Characteristics of Soil
18、 Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum req
19、uired for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control s
20、ystem. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authorit
21、y. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0266002010SELECTFILLANDTOPSOILFORLANDFILLCOVER 选择 掩埋 填方 表层 PDF

链接地址:http://www.mydoc123.com/p-449533.html