ARMY UFGS-02 65 00-2010 UNDERGROUND STORAGE TANK REMOVAL《地下储罐移除》.pdf
《ARMY UFGS-02 65 00-2010 UNDERGROUND STORAGE TANK REMOVAL《地下储罐移除》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 65 00-2010 UNDERGROUND STORAGE TANK REMOVAL《地下储罐移除》.pdf(40页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 65 00 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 65 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 65 00UNDERG
2、ROUND STORAGE TANK REMOVAL02/10PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Qualifications1.5.2 Laboratory Services1.5.3 Support Staff1.5.4 Preconstruction Conference and Work Plan1.5.4.1 Site Safety and Health Plan1.5.4.2 Excavation and M
3、aterial Handling Plan1.5.4.3 Field Sampling and Laboratory Testing Plan1.5.4.4 Tank and Piping Removal and Disposal Plan1.5.4.5 Spill and Discharge Control Plan1.5.4.6 Site Safety And Health Officer1.5.5 Permits and Licenses1.5.6 Statutes and Regulations1.6 PROJECT/SITE CONDITIONSPART 2 PRODUCTS2.1
4、BACKFILL MATERIAL2.2 PLASTIC SHEETINGPART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.1.1 Safety Guidelines3.1.2 Exclusion Zone (EZ) And Contamination Reduction Zone (CRZ)3.1.3 Onsite Training3.1.4 Personnel Protection3.1.5 Respiratory Protection Program3.1.6 Decontamination3.1.7 Emergency Response and Fir
5、st Aid EquipmentSECTION 02 65 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.8 Burning and Explosives3.1.9 Protection of Existing Structures and Utilities3.1.10 Shoring3.2 TANK CONTENTS VERIFICATION3.2.1 Sampling3.2.2 Analysis3.2.3 Char
6、acterization3.3 CLEARING, GRUBBING AND REMOVALS3.4 TOPSOIL3.5 PREPARATIONS FOR EXCAVATION3.5.1 Removal of Product, Pumpable Liquids, and Sludge3.5.2 Contaminated Water Disposal3.5.2.1 Sampling, Analysis, and Containment3.5.2.2 Treatment3.6 PURGING AND INERTING3.7 EXCAVATION3.7.1 Exploratory Trenches
7、3.7.2 Tank Excavation3.7.3 Temporary Containment of Excavated Soil3.7.4 Piping Excavation3.7.5 Open Excavations3.7.6 Hidden Structures3.7.7 Stockpiles3.7.8 Acceptable Levels of Contamination3.8 REMOVAL OF PIPING, ANCILLARY EQUIPMENT, AND TANK3.8.1 Piping and Ancillary Equipment3.8.2 Tank3.8.3 Contam
8、inated Soil, Tank and Piping Excavation Examination3.8.4 Testing Along Piping3.9 TANK CLEANING3.9.1 Exterior3.9.2 Temporary Storage3.9.3 Interior3.10 SOIL EXAMINATION, TESTING, AND ANALYSIS3.10.1 Tank Excavation Sampling Procedures3.10.2 Stockpiled Material Sampling3.10.3 Analysis3.11 BACKFILLING3.1
9、2 DISPOSAL REQUIREMENTS3.12.1 Treatment, Disposal, and Recycling3.12.2 Tank and Ancillary Equipment Disposal3.12.3 Transportation of Wastes3.12.4 Salvage Rights3.12.5 Manifest Records3.12.6 Hazardous/Special Waste Manifests3.12.7 Documentation of Treatment or Disposal3.13 SPILLS3.14 INSPECTIONS3.15
10、TANK CLOSURE REPORT3.16 COMPACTION, FINISH GRADING, and SEEDING- End of Section Table of Contents -SECTION 02 65 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 65 00 (February 2010)-Preparing Activity
11、: USACE SupersedingUFGS-02 65 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 65 00UNDERGROUND STORAGE TANK REMOVAL02/10*NOTE: This guide specification covers the requirements for removal and disposal of underground, nonhardene
12、d tanks and piping used to store petroleum products, waste oils or hazardous wastes in accordance with Federal, State, and local regulations.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or inser
13、t appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical propon
14、ents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Show the following information on the project drawings:(1) Overall installation plan which identifies and
15、 locates tanks and equipment; borrow, disposal, and stockpile areas; temporary containment areas; special security areas; shoring and special support requirements; and access routes.(2) Individual as-built site plans of tank locations which identify site features such as SECTION 02 65 00 Page 3Provi
16、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-buildings, roads, utilities, topography, trees and shrubs, surface condition, etc. If as-built drawings are not available, a site investigation and site plans are required to show the general location of exi
17、sting tanks and site features. Detail drawings to include dimensions, sections, elevations, slopes and size of excavations and temporary containment areas. Provide, as part of the Tank Closure Report, a detailed map showing exact location of the tank prior to removal.(3) Limits of pavement removal,
18、fence removal, and the location of ancillary equipment to be removed.Hardened tanks are deep buried tanks as would be found with some missile facilities. Note this in the contract as they require deeper excavations and possibly substantial demolition of concrete.Tanks will not be abandoned in place
19、unless a waiver is granted in accordance with state or local requirements, LEE HQ U.S. Air Force for Air Force Projects, and HQUSACE policy dated 31 July 1990, for Formerly Used Defense Sites. Waivers will be obtained prior to advertising the closure project. Exceptions will be granted when requeste
20、d in writing on a case by case basis. Absence of contamination must still be verified prior to closure and prior to obtaining a waiver.Incorporate installation, state and local requirements into this specification, including the necessary approval processes, licensing, or having their representative
21、 on site during removal operations. In many cases, the state or local jurisdiction has final authority on approval of the Work Plan. While states often enforce petroleum tank removal regulations, counties and cities are sometimes delegated authority.Petroleum sludge and contaminated media are often
22、considered “special wastes“ and are subject to regulations enforced by the State Fire Marshals Office, local agencies, etc. Some states have adopted federal rules for management of petroleum waste.State requirements usually involve testing, analysis, and a report. The review by the state may require
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0265002010UNDERGROUNDSTORAGETANKREMOVAL 地下 储罐移 PDF

链接地址:http://www.mydoc123.com/p-449532.html