1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 35 27 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 35 27 (April 2006)GUIDE SPECIFICATION FOR CONSTRUCTIONReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 35 27SOIL-BENTONITE
2、(S-B) SLURRY TRENCH05/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.1.1 Measurement1.1.2 Payment1.2 DEFINITIONS1.2.1 Slurry Trench1.2.2 Slurry Method of Excavation1.2.3 Bentonite1.2.4 Slurry1.2.5 Soil Bentonite (S-B) Backfill1.2.6 Ground Water Level1.2.7 Working Surface1.2.8 Confining Stratum1.3 REFE
3、RENCES1.4 SUBMITTALS1.5 SUBMITTAL REQUIREMENTS1.6 QUALITY ASSURANCE1.6.1 Qualifications1.6.1.1 Contractor1.6.1.2 Slurry Trench Specialist1.6.1.3 Slurry Trench Excavation Equipment Operator1.7 DELIVERY, STORAGE, AND HANDLING1.8 GEOTECHNICAL SITE CONDITIONS1.8.1 Exploratory Borings1.8.2 Subsurface Con
4、ditions1.8.3 Ground Water1.8.4 Embankment ConditionsPART 2 PRODUCTS2.1 MATERIALS2.1.1 Bentonite2.1.2 Water2.1.3 Backfill Material2.2 EQUIPMENTSECTION 02 35 27 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.1 Trench Excavation Equipment2.2.
5、2 Slurry Mixing and Cleaning Equipment2.2.3 Field Laboratory Equipment2.3 BENTONITE SLURRY MIXES2.3.1 Initial Bentonite Slurry Mixture2.3.2 Trench Bentonite Slurry Mixture2.3.3 Additional Bentonite2.3.4 Additives2.3.5 S-B BackfillPART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.2 WORKING SURFACE3.3 SLURRY
6、TRENCH EXCAVATION3.3.1 Confining Stratum Excavation3.3.2 Blasting Plan3.4 SLURRY PLACEMENT AND TESTING3.4.1 Slurry Placement3.4.2 Slurry Testing3.5 EXCAVATED MATERIAL3.6 STABILITY3.7 TRENCH CLEANING3.8 S-B BACKFILL MIXING AND PLACEMENT3.8.1 Mixing3.8.2 Placement3.8.3 Mixing and Placing During Cold W
7、eather3.8.4 Testing3.9 SOUNDINGS3.9.1 Elevation of Top of Confining Stratum3.9.2 Elevation of Trench Bottom Prior to Backfilling3.9.3 Profile of S-B Backfill Slope and Trench Bottom3.10 AS-BUILT PROFILE3.11 TREATMENT OF TOP OF SLURRY TRENCH3.12 QUALITY CONTROL TESTING3.12.1 Bentonite Tests3.12.2 Wat
8、er Tests3.12.3 Backfill Material Tests3.12.4 Slurry Properties3.12.5 S-B Backfill Tests3.12.6 Samples of Confining Stratum3.13 CLEAN-UP- End of Section Table of Contents -SECTION 02 35 27 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE /
9、 NAVFAC / AFCESA / NASA UFGS-02 35 27 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 35 27 (April 2006)GUIDE SPECIFICATION FOR CONSTRUCTIONReferences are in agreement with UMRL dated April 2010*SECTION 02 35 27SOIL-BENTONITE (S-B) SLURRY TRENCH05/10*NOTE: This guide specification covers the
10、 requirements for constructing a soil-bentonite slurry trench at both conventional and hazardous waste projects.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Rem
11、ove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organiz
12、ation designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: In using this guide specification, the designer should realize that the requirements for the bentonite, backfill, and construction pro
13、cedure are highly dependent on the intended purpose of the slurry trench and the environment in which it is to be used.The primary considerations for S-B slurry trenches are blowout requirements, permeability, strength, and compressibility.The S-B backfill should be designed to prevent possible blow
14、out or piping of the S-B backfill into SECTION 02 35 27 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the surrounding foundation material due to the hydraulic gradient acting across the slurry trench. Design criteria are presented in Chapter
15、9, Corps of Engineers (COE) EM 1110-2-1901.The permeability for S-B slurry trenches is usually in the order of 10-6 to 10-8 cm/sec. The actual permeability of the slurry trench is dependent on both the filter cake, which forms on the sides of the trench and the S-B backfill. The contributions of bot
16、h are dependent on the relative permeability and thickness of the two materials. For design purposes, however, it is recommended that the permeability of the slurry trench be based only on the S-B backfill. For permanent or critical temporary projects, laboratory permeability tests should be utilize
17、d in establishing the mix design.When design requirements dictate, both shear strength and compressibility of the S-B backfill should be analyzed by conducting laboratory testing.Since chemical contaminants commonly associated with hazardous waste sites may increase the permeability of S-B backfill,
18、 a compatibility testing program must be undertaken prior to constructing a slurry trench. If the trench is to be excavated through contaminated material, consider performing compatibility testing using two potential backfill materials; soils to be excavated from the trench and an uncontaminated bor
19、row source. It should be noted that compatibility testing can take from 2 to 6 months to complete. For this reason, it is generally recommended that compatibility testing be completed during the design phase of the project.A recommended compatibility testing program consists of:1. Free swell (ASTM D
20、 5890) and filter cake permeability tests of several bentonites using contaminated site ground water and site mixing water that will be used during construction to determine acceptable bentonites for use on the project.2. Mix design optimization tests to determine the most economical mix of soils, d
21、ry bentonite, and bentonite slurry to produce the required permeability. This consists of short-duration (48-72 hours) permeability tests varying the amount of dry bentonite added (0, 2, and 4 percent) and if necessary the amount of additional fines added (0, 10, 20 percent) using site mixing water
22、as the permeant.3. Long-term flexible wall permeameter testing of at least 3 S-B backfill samples: the optimum mix design with site mixing water only as the permeant (control); the optimum mix design with contaminated SECTION 02 35 27 Page 4Provided by IHSNot for ResaleNo reproduction or networking
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0235272010SOILBENTONITESBSLURRYTRENCH 土壤 膨润土 SB 泥浆 PDF

链接地址:http://www.mydoc123.com/p-449517.html