1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 50 00 (August 2009)-Preparing Activity: USACE SupersedingUFGS-01 50 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 50 00TEMPORAR
2、Y CONSTRUCTION FACILITIES AND CONTROLS08/09PART 1 GENERAL1.1 SUMMARY1.2 REFERENCES1.3 SUBMITTALS1.4 CONSTRUCTION SITE PLAN1.5 BACKFLOW PREVENTERS CERTIFICATE1.5.1 Backflow Tester Certificate1.5.2 Backflow Prevention Training CertificatePART 2 PRODUCTS2.1 TEMPORARY SIGNAGE2.1.1 Bulletin Board2.1.2 Pr
3、oject and Safety Signs2.2 TEMPORARY TRAFFIC CONTROL2.2.1 Haul Roads2.2.2 Barricades2.2.3 Fencing2.2.4 Temporary Wiring2.2.5 Backflow PreventersPART 3 EXECUTION3.1 EMPLOYEE PARKING3.2 AVAILABILITY AND USE OF UTILITY SERVICES3.2.1 Temporary Utilities3.2.2 Payment for Utility Services3.2.3 Meters and T
4、emporary Connections3.2.4 Advance Deposit3.2.5 Final Meter Reading3.2.6 Utilities at Special Locations3.2.6.1 Utilities at Guam by Contractor for Special Projects3.2.6.2 Utility Services at Midway3.2.7 Utility Services for Diego Garcia Projects3.2.7.1 Contractor-Owned and Operated Radio Telecommunic
5、ationsSECTION 01 50 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.7.2 Off-Island3.2.8 Utility Services for Wake Island3.2.9 Telephones at Midway, Wake, and Diego Garcia3.2.10 Electricity3.2.11 Water3.2.12 Sanitation3.2.13 Telephone3.2.
6、14 Obstruction Lighting of Cranes3.2.15 Fire Protection3.3 TRAFFIC PROVISIONS3.3.1 Maintenance of Traffic3.3.2 Protection of Traffic3.3.3 Rush Hour Restrictions3.3.4 Dust Control3.3.5 Commercial Vehicles In/Out of NAVSTA/NAS Norfolk, VA3.4 CONTRACTORS TEMPORARY FACILITIES3.4.1 Safety3.4.2 Administra
7、tive Field Offices3.4.3 Storage Area3.4.4 Supplemental Storage Area3.4.5 Appearance of Trailers3.4.6 Trailers or Storage Buildings3.4.7 Maintenance of Storage Area3.4.8 New Building3.4.9 Security Provisions3.4.10 Storage Size and Location3.4.11 Storage in Existing Buildings3.4.12 Weather Protection
8、of Temporary Facilities and Stored Materials3.4.12.1 Building and Site Storm Protection3.4.12.2 TyphoonHurricane Condition of Readiness3.5 GOVERNMENT FIELD OFFICE3.5.1 Resident Engineers Office3.5.2 Quality Control Manager Records and Field Office3.5.3 Trailer-Type Mobile Office3.6 PLANT COMMUNICATI
9、ON3.7 TEMPORARY PROJECT SAFETY FENCING3.8 CLEANUP3.9 RESTORATION OF STORAGE AREA- End of Section Table of Contents -SECTION 01 50 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 50 00 (August 2009)-Prep
10、aring Activity: USACE SupersedingUFGS-01 50 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION 01 50 00TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS08/09*NOTE: This specification covers the requirements for temporary construction fa
11、cilities, safety systems, construction traffic provisions, construction signage and controls over contractor operations required for use in all projects.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items
12、(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of tech
13、nical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for SOUTHDIV; SW DIV; NAVY; NASA; ARMY,NAVY; LANTDIV; LANTDIV,
14、PACDIV; PACDIV; and EFA MW. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERAL*NOTE: TO DOWNLOAD UFGS GRAPHICS go to:http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.SEC
15、TION 01 50 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-On the drawings, show:1. Location of temporary buildings and storage areas, if specified;2. Location of temporary utility connections, if specified.*1.1 SUMMARYRequirements of this S
16、ection apply to, and are a component of, each section of the specifications.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organi
17、zation, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.Referenc
18、es not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
19、 the text by the basic designation only.AMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C511 (2007) Standard for Reduced-Pressure Principle Backflow Prevention AssemblyFOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH (FCCCHR)FCCCHR List (continuously updated) List of Approved Backflow Prev
20、ention AssembliesFCCCHR Manual (1988e9) Manual of Cross-Connection ControlNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 241 (2009) Standard for Safeguarding Construction,Alteration, and Demolition OperationsSECTION 01 50 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted
21、 without license from IHS-,-,-NFPA 70 (2008; AMD 1 2008) National Electrical Code - 2008 EditionU.S. FEDERAL AVIATION ADMINISTRATION (FAA)FAA AC 70/7460-1 (Rev K) Obstruction Marking and LightingU.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)MUTCD (2000) Manual of Uniform Traffic Control Devices1.3 SUBMI
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0150002009TEMPORARYCONSTRUCTIONFACILITIESANDCONTROLS 临时 施工 设备 控制 PDF

链接地址:http://www.mydoc123.com/p-449509.html