ARMY UFGS-01 45 00 10 10-2010 QUALITY CONTROL SYSTEM (QCS)《质量控制系统(QCS)》.pdf
《ARMY UFGS-01 45 00 10 10-2010 QUALITY CONTROL SYSTEM (QCS)《质量控制系统(QCS)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-01 45 00 10 10-2010 QUALITY CONTROL SYSTEM (QCS)《质量控制系统(QCS)》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.10 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01.10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 45 00.10 10QUALITY CONTROL SYSTEM (QCS)02/10PART 1 GENE
2、RAL1.1 Contract Administration1.1.1 Correspondence and Electronic Communications1.1.2 Other Factors1.2 QCS SOFTWARE1.3 SYSTEM REQUIREMENTS1.4 RELATED INFORMATION1.4.1 QCS User Guide1.4.2 Contractor Quality Control(CQC) Training1.5 CONTRACT DATABASE1.6 DATABASE MAINTENANCE1.6.1 Administration1.6.1.1
3、Contractor Information1.6.1.2 Subcontractor Information1.6.1.3 Correspondence1.6.1.4 Equipment1.6.1.5 Management Reporting1.6.1.6 Request For Information (RFI)1.6.2 Finances1.6.2.1 Pay Activity Data1.6.2.2 Payment Requests1.6.3 Quality Control (QC)1.6.3.1 Daily Contractor Quality Control (CQC) Repor
4、ts.1.6.3.2 Deficiency Tracking.1.6.3.3 QC Requirements1.6.3.4 Three-Phase Control Meetings1.6.3.5 Labor and Equipment Hours1.6.3.6 Accident/Safety Reporting1.6.3.7 Features of Work1.6.3.8 Hazard Analysis1.6.4 Submittal Management1.6.5 Schedule1.6.6 Import/Export of Data1.7 IMPLEMENTATION1.8 DATA SUB
5、MISSION VIA CD-ROM1.8.1 File MediumSECTION 01 45 00.10 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.8.2 CD-ROM Labels1.8.3 File Names1.9 MONTHLY COORDINATION MEETING1.10 NOTIFICATION OF NONCOMPLIANCEPART 2 PRODUCTSPART 3 EXECUTION- End
6、of Section Table of Contents -SECTION 01 45 00.10 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.10 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01.10 (January 2008)UNIFIED
7、FACILITIES GUIDE SPECIFICATIONS*SECTION 01 45 00.10 10QUALITY CONTROL SYSTEM (QCS)02/10*NOTE: This guide specification covers the requirements for use of the Quality Control System (QCS) for contract monitoring and administration.Edit this guide specification for project specific requirements by add
8、ing, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should b
9、e directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 Contract Administra
10、tion*NOTE: During preparation of the Project Management Plan, the project delivery team should analyze each project/future contract to decide if use of (QCS) is necessary. Its use will be appropriate for inclusion in most construction and dredging contracts. However, it may not be necessary nor bene
11、ficial to include the (QCS) requirement in small, simple, short duration contracts/delivery orders for construction, or for other contracts where its use would not be beneficial overall.The decision to use or not use QCS should be documented in the project management plan for each SECTION 01 45 00.1
12、0 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-construction project. A district-wide internal Standard Operating Procedure specifying the criteria for QCS use is also recommended. Note that RMS, the Government version, is to be used for a
13、ll construction contracts, including those where QCS is not required.The clauses and sections listed below are closely related to this section and must be coordinated with this section. These clauses and sections should reference Section 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) whenever appropria
14、te and necessary to require use of QCS by the Contractor.- Contract Clause, Schedules for Construction - Contracts- Contract Clause, Payments- Section 01 32 01.00 10 PROJECT SCHEDULE- Section 01 33 00 SUBMITTAL PROCEDURES- Section 01 45 00.00 10 QUALITYCONTROL*The Government will use the Resident Ma
15、nagement System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor must use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The Contr
16、actor module, user manuals, updates, and training information can be downloaded from the RMS web site. This joint Government-Contractor use of RMS and QCS will facilitate electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, tr
17、ack, and electronically share information with the Government in the following areas:AdministrationFinancesQuality ControlSubmittal MonitoringSchedulingImport/Export of Data1.1.1 Correspondence and Electronic CommunicationsFor ease and speed of communications, both Government and Contractor will, to
18、 the maximum extent feasible, exchange correspondence and other documents in electronic format. Correspondence, pay requests and other documents comprising the official contract record will also be provided in paper format, with signatures and dates where necessary. Paper documents will govern, in t
19、he event of discrepancy with the electronic version.1.1.2 Other FactorsParticular attention is directed to Contract Clause, “Schedules for Construction Contracts“, Contract Clause, “Payments“, Section 01 32 01.00 10PROJECT SCHEDULE, Section 01 33 00 SUBMITTAL PROCEDURES, and Section 01 45 00.00 10 Q
20、UALITY CONTROL, which have a direct relationship to the reporting to be accomplished through QCS. Also, there is no separate payment for establishing and maintaining the QCS database; all costs associated therewith will be included in the contract pricing for the work.SECTION 01 45 00.10 10 Page 4Pr
21、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 QCS SOFTWAREQCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make available the QCS software to the Contractor after award of the
22、construction contract. Prior to the Pre-Construction Conference, the Contractor will be responsible to download, install and use the latest version of the QCS software from the Governments RMS Internet Website. Upon specific justification and request by the Contractor, the Government can provide QCS
23、 on CD-ROM. Any program updates of QCS will be made available to the Contractor via the Government RMS Website as they become available.1.3 SYSTEM REQUIREMENTSThe following is the minimum system configuration that the Contractor must have to run QCS:QCS and QAS SystemHardwareIBM-compatible PC with 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS01450010102010QUALITYCONTROLSYSTEMQCS 质量 控制系统 QCSPDF

链接地址:http://www.mydoc123.com/p-449507.html