ARMY MIL-P-60620 D (1)-1994 PROJECTILE ASSEMBLY FOR CARTRIDGE SMOKE WP 81MM M375A1《M375A1式81 mm白磷烟幕弹(WP)弹夹的组装》.pdf
《ARMY MIL-P-60620 D (1)-1994 PROJECTILE ASSEMBLY FOR CARTRIDGE SMOKE WP 81MM M375A1《M375A1式81 mm白磷烟幕弹(WP)弹夹的组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60620 D (1)-1994 PROJECTILE ASSEMBLY FOR CARTRIDGE SMOKE WP 81MM M375A1《M375A1式81 mm白磷烟幕弹(WP)弹夹的组装》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、I INCH-POUND I MIL-P-6062OD (AR) AMENDMENT 1 23 August 1994 MILITARY SPECIFICATION PROJECTILE ASSEMBLY FOR CARTRIDGE, SMOKE, WP, 81MM, M375A1 This Amendment forms a part of MIL-P-60620D (AR), dated 9 August 1985, and is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and
2、is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1. I, SPEClL.lCAI10NS, Add : “FEDERAL TT-C- 490 Cleaning Methods and Pre treatment of Ferrous Surfaces for Organic Coatings.“ PAGE 4 3.6, Delete in its entirety and substitute: “3.6 Proving ground (maximum av
3、erage pressure) test. Projectile bodies shall reveal no evidence of failure when tested at maximum average pressure in accordance with 4.5.6.“ PAGE 5 Add new paragraph 3.9 as follows: “3.9 Hydrostatic test (one-piece projectile). Each one- piece projccti le shall withstand stresses developed by the
4、application of 7000 + 250 psi internal hydrostatic pressure for five seconds without leakage, rupture, or permanent deformation when tested in accordance with 4.5.2.1.“ 1 of 10 AMSC N/A DISTRIBUTION STATEMENT A. FSC 1315 Approved for public release; distribution is unlimited. Provided by IHSNot for
5、ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60620D 9AR) AMENDMENT 1 PAGE 5 (cont) 4.3.1, List of components submitted for first article, Add: “Body, prior to machining obturator groove . 10535864 . 10“. PAGE 6 TABLE 1, Add Category IV as follows: 81y, .g.rior to-
6、machininq obturating band qroove (Dwg. 10535864) a. Examination for defects . 10 . 100% . 3.2 . 4.4.2.2/4.4.2.3/4.4.2.4 b. Hydrotest . 10 . 100% . 3.9 . 4.5.2.1“. PAGE 7 4.4.2, Add the following at the end of the paragraph: “Dimensions marked tool control (*) shall be gaged during first article insp
7、ection, at the beginning of each workday, every four (4) hours during production, for the last component prior to and first component after each tooling, equipment, or process change, repair or adjustment. Measurements of the tool may be substituted provided the contractor has established correlatio
8、n between the tool dimension and the component dimension prior to substitution. determined, inspection of tool dimensions will be permitted. Whenever a defective tool control dimension is found, immediate action will be taken by the contractor to correct the tool problem and all material produced si
9、nce the last successful inspection shall be rejected.“ . When acceptability has been PAGE 8 4.4.2.1, Majors, Add: “103 Forward inside diameter . 0.40% . 3.2 . Gage 104 Wall thickqess, minimum, through shoulder . 0.40% . 3.2 . Gage . . .Gagegi 105 Length from rear face to base of cavity . 0.40% . 3.2
10、 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60620D 9AR) AMENDMENT 1 PAGE 9 4.4.2.2, Title block, Add : trBodyl. Drawing Number block, Add: 181053586411. Notes, Add: Il/ - Minor characteristics do not apply to 1053586411. Critical, Add: “
11、4 . . .Hydrotest . . .loo% . . .3.9 . . .4.5.2.lV1. Critical 2, delete in its entirety and substitute: “2 . press fit surface increases in diameter anywhere from front face to WP cavity . 100% . 3.2 . Gage.“ PAGE 10 4.4.2.3. Critical 1, Delete in its entirety and substitute: “1. Hydrotest . 1/ . 100
12、% . 3.4.1 . 4.5.2“. Critical 2, Delete in its entirety and substitute: “2. Air leak test . I/ . 100% . 3.4.2 . 4.5.3“. Criticals 3, 4 and 5, Delete in their entirety. Specials, Add: lia. Metal defects . 100% . 3.2 . Visual b. Hydrostatic test stamp missing . 100% . 3.2 . Visual C. Air pressure test
13、stamp missing . 1/ . 100% . 3.2 d. k3raze metal not visible for 360 degrees, internal and e. t3rdzt riic.I.al voids in excess of requirements (external ) f. Presence of void(s) at juncture of base and body wall Y- Joirit quality inadequate .I /, z/ . 100% . 3.4.3 . . .Visual external . . .i/ . . -10
14、0% . . -3.4 . . .Visual .1 / . 100% . 3.4 . Visual (internal) . )-/ . 100% . 3.4 . Visual . . -4.5. a/Visual“. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bOb20D (1) 9999906 L992904 3LT ! MIL-P-606200 9AH) AMENDMENT 1 PAGE 10 (cont) Notes
15、, Add: “1/ Alternative body assembly only 2/ See 4.4.3.4“. PAGE Il 4.4.2.3, Majors 110, 111, and 112 No. of Sample Units column, Add: Il/“. Notes, Add: “I/ See 10535866 for this feature on Body Alternative I.“ Majors, Add: II 13.0 Diariictcr of- bourrelet . . .0.40% . . .3.2 . . .Gage“. PAGE 12 J 4.
16、4.2.3, Majors 113, 114, 120, and Minors 201, 202, 203, 204 No. of Saarriple Units column, Add: Il/“. Majors Il5 arid 116 No. 01- SarripIc Urii ts colurriri, Add: “2/“. Notes, Add: - “1/ See 10535866 for this feature on Body Alternative I 2/ Applies tio 10535864 only“. 4 Provided by IHSNot for Resale
17、No reproduction or networking permitted without license from IHS-,-,-MIL-P-60620D 9AR) AMENDMENT 1 PAGE 13 4.4.2.3, Minors 210 No. of Sample Units column, Add: iil/ii. - 211 Delete: “VisualI1, and substitute: Gagef1. 218 Delete in its entirety and add: “219 Depth of drill point in thread boss, maxim
18、um . 0.65% - . -3.2 . . .Gageii. 220 Diameter of drill point at rear face of thread boss . . .O. 65% . . .3.2 . . .Gage“. Notes, Add: Il/ See 10535866 for this feature on Body Alternative I.“ PAGE 14 4.4.2.3, Add: “Special a . Major diameter of thread, min - 100% . 3.2 . . .Gage“. Major 102, delete
19、in its entirety. Major 104, No. of Sample Units column, Add: lll/tl. Majors, Add: “Ill Salt spray test . 21 . - . 3.5 . 4.5.5/Visual 112 Max average pressure test . . .3/ . . .- . . -3.6 . . .4.5.6/Visual“. Notes, Add Ill/ Major diameter shall be checked to full form minimum lerigt h 2/ See 4.5.5 31
20、 See 4.4.4“. PAGE 17 4.4.3.2, Delete iri its entirety. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bObZOD (1) MIL-P-60620D 9AR) AMENDMENT 1 PAGE 18 4.4.3.4, Delete in its entirety and substitute: “4.4.3.4 Joint quality (alternative body a
21、ssembly). lhc test shall be performed for first article inspection each day of brazing during production and whenever a change is made to the brazing process. After air and hydrostatic testing, but prior to the application of protective coating, three (3) samples from the start of brazing operations
22、 and from the first units produced after a layoff of over one (1) hour shall be tested. Iwo (2) samples shall be selected, each from the end of brazirig operations during continuous brazing, up to 24 hours arid from the last. units produced prior to a layoff of over one hour and tested in accordance
23、 with 4.5.4. If a failure occurs in either of the two (2) samples tested at the end of the days brazing operations or at the start of layoff-, all parts brazed since the last successful test shall be rejected.“ 4.4.3.5, Delete in its entirety. 4.4.4, Delete iri its entirety and substitulc: “4.4.4 Pr
24、oving ground (maximum average pressure) test. See 4.5.6. iwerity five (25) projectiles shall be tested from the first article sample and ten (10) from each of the first three (3) production lots and from three (3) consecutive lots when a new mill heat of steel is introduced into production. &i attem
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP60620D11994PROJECTILEASSEMBLYFORCARTRIDGESMOKEWP81MMM375A1M375A1 81 MM 白磷 烟幕弹 WP 弹夹 组装 PDF

链接地址:http://www.mydoc123.com/p-446683.html