ARMY MIL-P-60416 A-1982 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf
《ARMY MIL-P-60416 A-1982 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60416 A-1982 PROPELLANT M1 FOR USE IN CHARGE PROPELLING 155MM M3A1《M3A1式155 mm点火管用M1发射火药》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、H 2f- 4- MIL-P-604LbA 13 7797706 0338328 8 MIL-P-60416A (AR) 23 MARCH 1982 SUPERSEDING MIL-P-60416 (MU) 20 December 1966 MI LI TARY SPEC I FI CAT ION PROPELLANT M1 FOR USE IN CHARGE, PROPELLINGI 155MM, M3A1 This specification is approved for use by the US Army Armament Research and Development Comma
2、nd, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers M1 Propellant for use in the M3A1 Propelling Charge. 1.2 Classification. The propellant shall be Type II, cylindrical, single-perfor-ated grains. 2. APPLICABLE DOCUMENTS
3、2.1 Government documents 2.1.1 Specifications and standards. Unless otherwise specified, the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specifi
4、cation to the extent specified herein. SPECIFICATIONS MI LI TARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for -, FSC: 1376 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improvin this document sh
5、ould be addressed to: Commander, US Army Armament fiesearch and Develo ment Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using tie self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. f- THIS DOCUMENT CONTAINS ,/A PAGE
6、S. I I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. -. MIL-P-6041bA 13 997770b O338329 T M MIL-P-60416A (AR) MIL-C-60418 - Charge, Propelling, 155MM, M3A1 Loading, Assembling and Packing STANDARDS MILITARY MIL-STD-286 - Propellants, Solid: Sampl
7、ing, Examination And Testing MIL-STD-414 - Sampling Procedures and Tables for Inspection by Variables for Percent Defect i ve MIL-STD-652 - Propellants, Solid for Cannons, Requ i rememen ts and Pack ing 2.1.2 Other government documents, drawings and publications. The following other Government docum
8、ents form a Part of this specification to the extent specified herein. DRAWINGS U.S . ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND (ARRADCOM) 8887277 - Charge, Propelling, 155MM, M3A1 for Cannon M1, M45, M126, M185,M199 2.1.3 Order of precedence. In the event of a conflict between the text of this
9、 specification and the references cited herein, the text of this specification shall take precedence. (Copies of specifications, standards, handbooks, drawings and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activit
10、y or as directed by the contracting officer.) 3. REQUIREMENTS ! I 3.1 Material. The propellant shall be M1, Type II conforming to the requirements of MIL-STD-652 and Drawing (Dwg) 8887277. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bOqLb
11、A 13 m 77777Ob 0338330 b m MIL-P-60416A (AR) 3.2 Ballistic assessment requirements. The propellant, when I fired in the M1 cannon with the M107 projectile shall be capable of assessment to the velocities and pressures at 70F as specified in Table I. TABLE I Velocity and Pressure zone - 1 A Velocity
12、(fps) 680 770 900 1040 1230 Average Pressure (psi) Mi n imum Maximum 18,000 28,000 3.3 Ballistic uniformity requirements. The propellant, when fired in the M1 cannon with the M107 projectile shall comply with the following requirements when tested as specified in 4.5.1.2. ll charges shall be manufac
13、tured in accordance with MIL-C-60418. 3.3.1 Uniformity of velocity. The standard deviation of velocity for the lot at zone 5 at 70F shall not exceed 3.0 feet per second. 3.3.2 Averaqe pressure. At 70F and standard weapon conditions, the propellant shall not produce an average pressure greater than 2
14、8,000 psi at zone 5. 3.3.3 Individual maximum pressure (IMP). The propellant shall not produce an individual pressure greater than 30,500 psi when fired at 70F. 3.4 Initial production. This specification contains provisions for initial production inspection. Requirements for the submission of initia
15、l production inspection samples by the contractor shall be as specified in 4.5.1.2.1. 3.5 Preproduction inspection. This specification contains provisions for preproduction inspection. Requirements for the submission of preproduction inspection samples by the contractor shall be as specified in 4.3.
16、1. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P- 60 4 16A (AR) 3.6 Potassium sulfate. The total potassium sulfate content of the propellant on an added basis shall be 1.00 + 0.30 percent when determined as specified in 4.5.2. - 3.7 Workman
17、ship. The best commercial practices shall be used in the formulation of propellant furnished under this specification, and all other applicable documents. The propellant and its standard ingredients shall be protected from the action of direct sunlight and acid fumes. Unless otherwise specified, no
18、reground propellant or nitrocellulose shall be used in the manufacture of propellant procured under this specification. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of
19、 MIL-A-48078 shall apply and are hereby made a part of this detail specification. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use hi
20、s own or any other facilities suitable for the performance of the inspection requirements, specified herein, unless disapproved by the Government. of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requi
21、rements . inspection shall be conducted on the unit product: The Government reserves the right to perform any 4.2 Classification of inspections. The following types of a. Preproduction Sample Inspection b. Quality Conformance Inspection 4.3 Preproduction sample (pilot lots). The preproduction sample
22、 is intended to provide the necessary information to establish the propellant granulation needed to meet the required ballistic parameters. 4.3.1 Submission. The Contractor shall select three (3) propellant granulations which, from experience,should best fit the requirements of this specification. T
23、he contractor shall submit a preproduction sample as designated by the Contracting Officer for evaluation in accordance with 4.3.2, consisting of three (3) pilot lots of 1000 lbs to 1200 lbs each representing three (3) candidate granulations. 4 Provided by IHSNot for ResaleNo reproduction or network
24、ing permitted without license from IHS-,-,- MIL-P-b0qLbA 13 777770b 0338332 T H MIL-P-60416A (AR) t 4.3.2 pvalua tion. Each of the pilot lots submitted per 4.3.1 will be tested for conformance to those specification requirements selected by the Government. the test results by the contractor and the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP60416A1982PROPELLANTM1FORUSEINCHARGEPROPELLING155MMM3A1M3A1 155 MM 点火 管用 M1 发射 火药 PDF

链接地址:http://www.mydoc123.com/p-446657.html