ARMY MIL-P-48241-1973 PLUG CLOSING 105MM《105毫米闭气塞》.pdf
《ARMY MIL-P-48241-1973 PLUG CLOSING 105MM《105毫米闭气塞》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48241-1973 PLUG CLOSING 105MM《105毫米闭气塞》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、#JXyP-48241 (MU) 14 September 1973 MIL I TARY S PE C IF1 C AT1 ON PLUG, CLOSING 10 5MM 1.1 This specification covers one type of plastic closing plug for lO5MM Howitzer cartridge. 2. APPLICABLE DOCUMENTS 2.1 The following documents of issue in effect on date of invitation for bids or request for pro
2、posal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - MIL-C-45662 - STANDARDS MILITARY MIL-STD-105 - MIL-STD-109 - MIL-STD-1168 - MIL-STD-1169 - MIL-STD-1235 - Ammunition and Special Weapons, General Specification for Calibration System Require
3、ments Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) Quality Assurance Terms and Definitions Lot Numbering of Ammunition Packaging, Packing and Marking for Ship- ment of Inert Ammunition Components Single and Multilevel Continuous Sampling Procedures and Tables for Inspect
4、ion by At tribute s. DRAWINGS 9282892 - lO5MM Closing Plug FSC : - THIS DOCUMENT CONTAINS 7 PAGES. _ 1315 , Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48241 33 W 7797706 0337783 4 MIL- P - 4 8 2 4 1 (MU. ) (Copies of specifications, standa
5、rds, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material. Material shall be in accordance with applicable drawings and specification
6、s. 3.2 Plug. The plug shall comply with all requirements speci- fied on Drawing (dwg.) 9282892 and with all requirements specified in applicable- specifications. 3.3 Workmanship. All parts shall be dry and free of dirt, grease and other foreign material, cracks, holes, flash. 3.4 First article inspe
7、ction. This specification makes pro- visions for first article inspection. Requirements for the sub- mission of first article sample by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contract
8、or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified he
9、rein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-1
10、09 in order to define terms used herein. The provisions of Specification MIL-A-2550 shall apply. 4.1.1 Submission of product.-At the time the completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the follow- ing information a
11、ccompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48241 13 W 7777906 0317784 b MIL-P-4 82 41 (2) a. A statement th
12、at the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with identification and date of changes thereto. c. A statement that all material purchased by the con- tractor meets requirements, when such mater
13、ial is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the cert
14、- ifying organization. The initial certificate submitted shall be sub- stantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in
15、 another agent of the certifying organi- zation. 4.2 First Article Inspection 4.2.1 Submission. The contractor shall submit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of 20 plugs fr
16、om each mold cavity which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials, including packaging and packing, shall be o
17、btained from the same source of supply as will be used in regular productioq. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this inspection with the sample, including statemen
18、ts of findings for materials, processes and tests. A sample containing known defects will not be submitted unless specifically authorized by the Contracting Officer. A first article sample, or portion thereof, as directed by the contracting officer, shall also be submitted whenever there is a lapse
19、in production for a period in excess of 90 days or whenever a change occurs in manufacturing process, material used, drawing or specification such.as to significantly affect product uniformity as determined by the Government. will be subjected by the Government to any or all the 4.2.2 Inspection to
20、be performed. Assemblies and components 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-4241 13 m 7777706 0317785 m MIL-P- 4 8 2 4 1 (MU.) examinations or tests specified in 4.3.2 and 4.3.3 of this spec- ification and any or all requirements
21、 of the applicable drawings. 4.2.3 Rejection. If any assembly or components fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reservesthe right to terminate its inspection upon any failure of an assembly or component to comply with an
22、y of the stated requirements. 4.3 Inspection Provisions 4.3.1 Lot formation.-The term “inspection lot“ as used in this specification is defined as an essentially homogeneous collection of units of product from which a representative sample is drawr, and inspected to determine conformance with applic
23、able requirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homo- geneity shall be considered to exist provided the inspection lot has been prod
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP482411973PLUGCLOSING105MM105 毫米 闭气 PDF

链接地址:http://www.mydoc123.com/p-446372.html