ARMY MIL-P-12951F-1972 PRIMER PERCUSSION M39A1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《碰炸起爆药包M39A1的零件及其装债 组装和包装》.pdf
《ARMY MIL-P-12951F-1972 PRIMER PERCUSSION M39A1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《碰炸起爆药包M39A1的零件及其装债 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-12951F-1972 PRIMER PERCUSSION M39A1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《碰炸起爆药包M39A1的零件及其装债 组装和包装》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-12951F (MU) 9 August 1972 SUPERSEDING 9 October i969 MIL-P-12951E (MU) MILITARY SPECIPICATION PRIMER, PERCUSSION, N39A1 PARTS FOR, AND LOADIIJG, ASSEilLING AND PACKING 1. SCOPE 1.1 This specification covers the inspection of the parts and the loading, assembling and packing of one type of perc
2、ussion primer designated as Primer, Percussion N39A1 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY NIL-A-2550 - Ammunition
3、and Special Weapons; General Specification for NILITARY NIL-STD-105 - Sampling Procedures and Tables for MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-1168- Lot Numbering of Amunit ion MIL-STD-1235- Single and Blultilevel Continuous Inspection by Attributes (ABC-STD-105) Sampling Pro
4、cedures and Tables for Inspection by Attributes Licensed by Information Handling ServicesMIL-P-129 51F (MU) DRAWINGS U.S. ARMY MUNITIONS COMMAND 8797919 - Primer, Percussion, M39A1 Assembly 8864583 - Container, Ammunition, Plastic for 8864584 - Box, Wire Bound, Packing, Ammunition 9207697 - Carton,
5、Packing, Ammunition, for Percussion Primer, M39A1 for Percussion Primer M39A1 Percussion Primer, M39A1 Level C Packing PUBLICATIONS U.S. ARMY MUNITIONS COMMAND ET-87 989 19- Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with
6、specific procurement functions should be obtainea from the procuring activity or as dgrected by the contracting officer). 3. REQUIREMENTS 3.1 Material.-r Bterial and parts shall be in accordance 3.2 with applicable drawings and specifications. specified on Drawing (dwg.) 8798919, and with all requir
7、ements specified in applicable specifications. moisture content at the loading station at the time of loading the primer shall not exceed 0.30 percent when determined as specified in 4.4.1. 3.4 Functioning.-The primer assembly shall not show evidence of a firing failure (see 6.5) when tested as foll
8、ows: Frimers .-The primers shall cornply with all requirements 3.3 Moisture content of primer mixture composition.-The 2 ._, - .i ,. i I f 3 i Licensed by Information Handling ServicesflIL-P-1275lF 13 779770b 0274737 T MIL-P-12951F (MU) 3.4.1 Sensitivity.-The primer assembly shall fire without any e
9、vidence of failure when a maximum (max.) of twenty-nine and forty hundredths (29.40) inch ounces (see 6.6) of energy.is applied and shall not fire when a minimum (min.) of three and eighty-four hundredths (3.84) inch ounces of energy is applied. The test shall be performed as specified in 4.4.2.1. 3
10、.4.2 Failure to fire (Dud).-The primer assembly shall not fail to fire when tested as specified in 4.4.2.2. 3.5 Workmanship.-All parts and assemblies shall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of burrs, chips, sharp edges, c.racks, surface defects, dirt, gre
11、ase, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. All packing components shall be dry. 3.6 First article inspection.-T
12、his specification makes provision for first article inspection. Requirements for the submission of first article samples shall be as specified in the contract . 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspectSon.-Unless otherwise specified in the contract or purchase order, the suppli
13、er is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by t
14、he Government. The Government reserves the right to perform any of the inspectZon set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The pro
15、visions of MIL-A-2550 shall apply. o items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submi
16、tted: 4.1.1 Submission of product.-At the time each completed lot 3 Licensed by Information Handling ServicesMIL-P-12951F (MU) a. A statement that the lot conplies with all of the quality assurance provisions specified in this specification. b. Drawing an specification number and date, together with
17、 identification and date of changes thereto. C. A stateinent that all material purchased by .the contractor meets requirements, when such material is controlled by Governrnent or comercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file
18、 and available for review, except that a statement of findings on the moisture content of primer mixture composition shall be furnished with each lot submitted for acceptance . d. Number of items in the lot. e. Date submitted. The cePtificate shall be signed by a responsible agent of the certifying
19、organization. The initial certificate submitted sh 11 be substantiated by evidence of the agents authority to bind his principal. be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. Substantiati
20、on of the agents authority will not 4.2 First article inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first ar-ticle sample shall consist of twenty-five (25) each o
21、f anvils, cups, and bodies which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials, shall be obtained from the same sour
22、ce of supply as will be used in regular production. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and he shall submit a record of this inspection with the sample, including certificates of conforman
23、ce of materi-als. A sample containing known defects shall not be submitted unless specifically authorized by the contracting officer. A first article sample, or portion thereof, as directed by the contracting officer shall also be submitted whenever there is a lapse in production for a period in exc
24、ess of 90 days, or whenever a change occurs in manufacturing process, material used, drawing or specification such as to significantly affect product uniformity as determined by the Government. 4- Licensed by Information Handling ServicesNIL-P-129 51F 4.2.2 Inspections to be performed.-Components wi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP12951F1972PRIMERPERCUSSIONM39A1PARTSFORANDLOADINGASSEMBLINGANDPACKING 起爆 药包 M39A1 零件 及其 组装 包装

链接地址:http://www.mydoc123.com/p-446089.html